Site_Visit_QA_and_participant_list.pdf

PDF 95 KB Posted

Attached to
Rehabilitate Longmire area manholes, Mt Rainier NP
Solicitation number
140P8319Q0064
Issued by

About this file

Site Visit QA and participant list

View the file

Other files

File Type Posted
Sol_140P8319Q0064_Amd_0002.pdf PDF
LMHH1_Report.pdf PDF
LMHF1_Report.pdf PDF
Area_of_Excavation_LMHE1-LMHF1.pdf PDF
Longmire_Collection_-_LMHE1_&_LMHF1.pdf PDF
Sol_140P8319Q0064_Amd_0001.pdf PDF
Longmire_Collection_-_LMHH1.pdf PDF
LMHE1_Report.pdf PDF
KEY_PERSONNEL.docx DOCX document
longmire_area_map.pdf PDF
WA20190072_06.28.2019.pdf PDF
Sol_140P8319Q0064.pdf PDF
Park_Brochure.pdf PDF
PMIS_197170_Rehabilitate_Longmire_Wastewater_SOWjf_6-10-19.pdf PDF
J.1._PAST_PERFORMANCE.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P8319Q0064 Rehabilitate Longmire Area Manholes

Site Visit Questions and Answers

Q.1. Would a product substitution for the "polyurea interior coatings" be acceptable?

A.1. Yes, upon approval by the Engineer; please provide detailed specifications with the quotation or in advance for review.

Q.2. Are the contractors being asked to match the depth or the channel?

A.2. Both

Q.3. May bends be used?

Q.3. Yes, but only upon specific review at site

Q.4. May clean outs be used before the bends?

A.4. No.

Additions or deletions to the scope of work:

At L1 the wall along site L-126 is Historic and if necessary to be removed, the bricks shall be marked and the wall re-built to match as it originally stood at no additional cost to the Government.

The contractor shall patch the two existing cuts in asphalt between LMHF1 and LMHE1 (installed by NPS to determine presence of rock).