Sol_140P8319Q0048_Amd_0001.pdf
PDF 87 KB Posted
- Attached to
- Asphalt Paving for Longmire Area -Mount Rainier NP Federal contract opportunity
- Solicitation number
- 140P8319Q0048
About this file
140P8319Q0048
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_4_-_Read_Me_First.pdf | ||
| Attachment_3_-_Wage_Determination_WA20190001.pdf | ||
| Attachment_1_-_Scope_of_Work.pdf | ||
| Sol_140P8319Q0048.pdf | ||
| Attachment_2_-_Drawings.pdf | ||
| Attachment_5_-_Bond_Form_SF25A.pdf | ||
| Attachment_6_-_Past_Performance_-_Return_with_Quote.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P8319Q0048 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PY2
Ashford WA 98304-9751 55210 238th. Ave. E.
DOI, NPS, PWR - OLYM MABO - MORA
PPY
Ashford WA 98304-9751 22510 238th Ave E Mount Rainier National Park
NPS, PWR - OLYM MABO
07/09/20190001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/09/2019
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to post questions, answers and discussions from the site visit held 7/17/2019. An option line for hauling grindings has been added. No other changes.
Q: If the NPS estimate of tons is low or high, will there be a price renegotiation?
A: No, quote a per ton price of asphalt in place. You will be paid for what you install.
Q: Does the park want the grindings or does the contractor need to remove?
A: An option line has been added to the solicitation for the cost associated with the contractor hauling the grindings out of the park. Please include these costs on the option line, not in the price per ton quote.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Pamela Griffin
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8319Q0048/0001
Q: Is there a minimum depth of asphalt?
A: Yes, 2 inches.
Q: Will the NPS determine what areas to grind?
A: No, it will be up to the contractor to determine what needs to be ground to allow for a minimum of 2" asphalt and allow for the proper drainage patterns to be in place.
Q: Does the large hole at the far end toward the river need to be pre-leveled?
A: Yes.
Q: The bottom boards of the siding on the
Warehouse building are nearly touching the ground. Can we place asphalt up against the boards?
A: The NPS will remove and replace the boards to allow room for asphalt placement.
Legacy Doc #: NPS
Delivery Location Code: 0009816044
NPS Mount Rainier National Park
L-201 Park Warehouse
Longmire WA 98397 US
Period of Performance: 08/19/2019 to 09/20/2019
00030 Option Line - Haul and remove all grindings of TN asphalt material
(Option Line Item)
1 Days After Award
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it.