Opportunity: Replace Keller Ferry Marina Dock System, LARO
Description
This is a REQUEST FOR PROPOSALS for construction issued by the National Park Service for Lake Roosevelt National Recreation Area to replace the Keller Ferry Marina fuel and sewage pump-out dock system. This is a design-build project to accomplish the following: Provide and install new 1,000 square foot dock structure and pilings at the present location but further out in deeper water; Salvage and reinstall the existing fuel, water and sewage pump-out services; Salvage and reinstall the existing work shed; Repair the existing bulkhead; Repair and reinstall existing gangway; Salvage and install another 50 feet of existing gangway to extend the new dock further out into deeper water; Provide and install intermediate float between the gangways and piling to hold the intermediate float at approximately elevation 1,280 feet; and any other work to make the system complete and functional. This project is being solicited and awarded as a total (100%) Small Business set-aside. The NAICS code for this solicitation is 237990-Other Heavy and Civil Engineering Construction, with an associated small business size standard of $36.5 million. The magnitude of construction for this project is between $250,000 and $500,000. This magnitude range is required in accordance with FAR 36.204 and is not the Government's estimate. A single firm-fixed price construction contract will be awarded as a result of the solicitation. A Bid Bond is required with the submitted proposal, and Performance and Payment Bonds will be required after award.
PRE-PROPOSAL SITE VISIT. An organized pre-proposal site visit is scheduled to occur on December 14, 2017 at 1pm (Pacific Time), meeting at the Keller Ferry Marina. There is not a physical address for the marina site itself, however, you can find the marina via a map app or map website by searching "Keller Ferry Marina, WA," or follow these driving directions: 1. Take US-2 West toward Davenport/Creston/Wilbur (travel for 59 miles), 2. Travel through Davenport and Creston toward Wilbur, 3. Travel through the town of Wilbur, 4. Turn right onto WA-21 N (signs for WA-174/Republic Grand Coulee Dam) (travel for .6 miles), 5. Turn right to stay on WA-21 N toward Keller Ferry Marina. (travel for 13 miles), and 6. Destination will be on your left - follow signs for Marina. Lake Roosevelt National Recreation Area staff attending the site visit will be Hoa Lam (engineer) and Ron Sacchi (Chief of Facilities Management). Hoa and Ron will briefly introduce the project, and then conduct a walk-thru of the project site. Please be prepared for rain or other inclement weather. Plan one to two hours for the complete site visit and Q&A. Please RSVP with Ron Sacchi by office phone at 509-754-7821, or cell phone 509-631-0423, or via email to Ronald_Sacchi@nps.gov. Provide business name, point of contact name, and phone number at time of RSVP.
Refer to Section J of Attachment no. 3 for the complete list of attachments that includes the price schedule and all other terms, provisions, and clauses, as well as Dept. of Labor construction wage rates, Scope of Work, Appendices, etc.
PROJECT PERIOD OF PERFORMANCE. The Contractor shall be required to commence work under this contract within 3-5 calendar days after the date the Contractor receives the Notice to Proceed and complete the entire work ready for use not later than 120 calendar days (starting in January and finishing in May 2018). NOTE: The Government anticipates making an award decision by the first week of January. Because this project has a tight timeframe to begin in January 2018, immediately upon receiving the Notice of Award, the Contractor shall obtain the performance and payment bonds as expeditiously as possible, as well as submit the required Accident Prevention Plan. Scheduling the Pre-Construction meeting will be fast-tracked upon receipt of bonds and the Accident Prevention Plan, so that work can begin as soon as possible in January 2018 (anticipated start date is January 22, 2017). The 120 days includes design, construction, inspection, punch list work, and final inspection. The Government expects that once the design phase is complete that the on-site construction will be completed within a 45 day period.
HOW TO FIND THE ATTACHMENTS. All attachments can be accessed by clicking the link below which will redirect you to FedConnect. If clicking the link below does not take you directly to the solicitation overview page in FedConnect, but instead takes you to the FedConnect Home Page, then please follow these instructions for how to find the attachments: At the FedConnect home page, click "Search Public Opportunities Only." Next screen, under Search Criteria, change the drop-down menu selection to read "Reference Number," then type in solicitation number 140P8318R0003 and click "search." Next screen, click the underlined text that is the title of the solicitation, shown as "Replace Keller Ferry Marina Dock System, LARO." Next screen is the overview screen. On the right-hand side, is the list of attachments. The attachments must be opened individually, and can be downloaded and saved or printed.
ALL QUESTIONS MUST BE SUBMITTED IN WRITING VIA EMAIL. Submit questions to Phaedra Fuller, Contracting Officer. Questions can be submitted via FedConnect or Email. Email address is Phaedra_Fuller@nps.gov. Please reference the solicitation number in the subject line of the email, as "140P8318R0003/QUESTION." Interested parties are urged to check for amendments. The Government reserves the right to cancel this solicitation.
Overview
Reference number:
140P8318R0003
Issue date:
11/22/2017
Response due:
12/27/2017 08:00 PM US/Eastern
Set Aside:
Total Small Business
NAICS:
237990
PSC / FSC:
Y1PZ-CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Agency:
DOI
Contracting office:
NPS, PWR - OLYM MABO
600 E. Park Avenue
Port Angeles, WA 98362-6757
Place of Performance:
Lake Roosevelt NRA
Keller Ferry Marina
15 miles north of Wilbur, WA via
US-2 West and State Route 21 North
WA
Contact:
Phaedra Fuller
Phone:
Fax:
Email:
Phaedra_Fuller@nps.gov
Vendors conference:
Location:
Details:
What do I do now?
This is the opportunity summary page. To the left you will see a description and an overview of this opportunity.
To the right you will see a list of the attached documentation. To view any of the attachments, simply click the attachment name.
Registered Users
To register interest in this opportunity or to electronically respond, you must first sign in. Click the Sign In button below.
Non Registered Users
You can view this or any other public opportunity. However, registered users have numerous added benefits including the ability to submit questions to the agency, receive emails concerning updates and amendments, create and manage a response team and submit responses directly through this site.
Becoming a registered user is fast, free and takes only a few minutes. To get started, click the Register Now button below.
Documentation
140P8318R0003
Pre-solicitation Notice
Overview
Solicitation
Overview
140P8318R0003
Attchmt 1_READ ME FIRST
Attchmt 2_SF-1442 Solicitation Form
Attchmt 3_Terms and Conditions
Attchmt 4_DOL Wage Determination
Attchmt 5_Scope of Work
Attchmt 6_Appendix A Prelim Design Reprt
Attchmt 7_Appendix B General Site Map
Attchmt 8_Appendix C Waste Mgt Plan
Attchmt 9_Appendix D Conversions
Attchmt 10_Appendix E Hot Work Permit
Attchmt 11_Appendix F Photos
Attchmt 12_Subcontracting Worksheet
© 2017 Compusearch Software Systems, Inc. All rights reserved.
Terms of Service and Use
About FedConnect
Videos
Help
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.