Sol_140P8225B0005_Amd_0001.pdf
PDF 98 KB Posted
- Attached to
- PERL BUNGALOW 68 HAZMAT REMOVAL
- Solicitation number
- 140P8225B0005
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a National Park Service project. Amendment 0001 extends the bid due date to 19 August 2025 at 12:00pm Mountain Time and provides a Microsoft Teams link for the virtual bid opening on 20 August 2025 at 12:00pm Mountain Time. The amendment includes responses to several Request for Information (RFI) questions regarding a renovation project, covering details such as bathroom access, temporary power, utility line locations, electrical wiring removal, windows and doors identification, flooring substrate work, and weatherproofing requirements. The project period of performance is from 09/01/2025 to 11/30/2025, with the contracting officer being Michael Davidson from the National Park Service.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P8225B0005 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PPP
Honolulu HI 96850 Box 50165 300 Ala Moana Blvd, Room 6-226
NPS, PWR - HONO MABO
07/15/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/15/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment 0001 is to:
1. Extend the Bid Due date to 19 Aug 2025 at 12:00pm Mountain Time.
2. POST THE LINK TO ATTEND BID OPENING: The bid opening will be held virtually via
Microsoft Teams on 20 Aug 2025 at 12:00pm Mountain Time. Copy and paste this hyperlink to join meeting:
https://teams.microsoft.com/l/meetup-join/19%3ameeting_OGVmODg5OTEtOTJiMS00NzJiLWJlYjItMzE0M
TMzYWJiOTU1%40thread.v2/0?context=%7b%22Tid%22%3a%220693b5ba-4b18-4d7b-9341-f32f400a5494%22%
2c%22Oid%22%3a%220a3519c1-92fe-43b0-b7d8-21a00b5a0780%22%7d
Meeting ID: 285 256 819 256 5
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Michael Davidson
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8225B0005/0001
Passcode: zA6Wg9Ga
3. Answer RFI Questions.
Question: Bathroom Access: Can you please confirm whether the public restrooms across the parking lot (near the USS Missouri tour area) will be available for contractor use during the project?
Answer: The contractor may utilize the restrooms located across the parking lot near the USS
Missouri tour area.
Question: Temporary Power Access: Is there currently live power to Bungalow 68?
Answer: Bungalow 68 currently has no power. The contractor should plan to provide their own generators for the duration of the project. If a nearby power source is identified, the contractor will be notified.
Question: Location of Main Water and Sewer Lines:
Please clarify the exact location of the main sewer and water lines to be capped. A site utility map or description would be appreciated to confirm the scope.
Answer: The main sewer and water lines are located on the west side of the building underneath the flooring and can be accessed through the exterior skirting or once the subflooring is removed. The contractor should cap the lines in that section and not beyond. Exact locations will be easier to identify once the subflooring is removed during demolition.
Question: Electrical Wiring ¿ Scope
Clarification: The scope states: Remove all electrical components, including receptacles, light fixtures, switches, power panels, and all electrical wiring within the walls. Ensure complete removal of interior electrical infrastructure.
Can you please confirm:
Does this apply only to interior wall and ceiling wiring, or Are we also required to remove wiring underneath the building, such as crawlspace/conduit wiring?
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8225B0005/0001
Answer: Removal applies only to electrical components within interior walls and ceilings that are easily accessible. Wiring located underneath the building does not need to be removed.
Question: Windows and Doors Identification:
Several windows and doors have been stored loosely in closets. Is there a reference or labeling system available to identify where each unit were located, or just make a list of which doors/windows and missing, and labor the doors in windows in closet?
Answer: The contractor should make a list of missing doors and windows, and label the ones stored in the closet.
Question: Flooring Substrate Clarification: The specs reference mastic removal, which suggests a slab, but the structure appears to be on post-and-pier foundation. We are going to have to cut out the wooden subfloor to remove the mastic
(with some subfloor remaining around the perimeter edges which we will have to chisel out the top layer to remove mastic, just for clarity is this the direction you want to go?
Answer: Yes, the direction is to remove the existing wood subfloor in its entirety to abate the asbestos-containing mastic. After removal, a temporary plywood subfloor will be installed to maintain the building¿s floor diaphragm, protect against further structural movement, and provide safe working access until joist repairs and permanent subfloor installation occur in the next phase.
Temporary Subfloor Specifications:
Material: 3/4¿ Tongue-and-Groove APA
Sturd-I-Floor plywood, Exposure 1 or better.
Installation: Screw-only fastening, no adhesive, using coated deck screws spaced 12¿ along panel edges and 16¿ in the field.
Reusability: Panels will be marked for location to allow reinstallation in Phase 2.7.
Question: Weatherproofing Requirements: Outside of the call to plywood over window and door openings, is there any additional weatherproofing requirement expected for the building exterior?
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
4 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8225B0005/0001
Given this is a temporary protection until renovation, we¿d like to align with the NPS intent.
Answer: No additional waterproofing is required beyond boarding up all window and door openings.
Period of Performance: 09/01/2025 to 11/30/2025
National Park Service Points of Contact:
Michael Davidson, Contracting Officer, michael_davidson@nps.gov