This document is an Amendment (0001) to Solicitation 140P8125B0008 for the Great Basin National Park Lower Lehman Campground project. The amendment addresses contractor questions, clarifies project scope, and provides bid opening details. Key clarifications include: site preparation for vault toilets will be included in CLIN #1 Base Bid Pricing, the entire road loop will be repaved with 3" Hot Mixed Asphalt (HMA), and spoils will be used on-site. The project requires full depth milling of existing asphalt and road base, with excess materials to be used in a new campground addition.
The Period of Performance (PoP) is from July 1 to October 31, 2025, with work expected to be completed before weather conditions become prohibitive. Contractors are not permitted to camp onsite and must provide their own housing, with potential lodging options in nearby towns. No onsite water is available for construction, and contractors will need to source water locally. The bid is due on June 10, 2025, at 2 PM PDT, with a bid opening via Microsoft Teams on June 11, 2025, at 2 PM PDT. The project is being managed by the National Park Service Pacific West Region.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P8125B0008 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PPL
Boulder City NV 89005-2426 601 Nevada Way
NPS, PWR - LAKE MABO
05/30/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/05/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See Continuation Page
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Caroline Bachelier
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
140P8125B0008 Amendment 0001
The purpose of this amendment is to answer contractor questions, publish site visit attendance and provide the bid opening meeting information.
A. Contractor questions and answers are provided as follows:
Question 1: The drawings reference “Bid Option B – Trailhead Wall” and “Bid Option C – Vault Toilet” as CLIN #3 and CLIN #4, but these are not listed in the contract documents or bid schedule. Are these elements included in CLIN #1 Base Bid pricing? Please clarify.
Answer 1: There won’t be any added pricing in CLIN #1 Base Bid Pricing for this item. Also, the “Vault Toilets” will not be included in the CLIN #1 Base Bid Pricing except for digging and prepping for the placement of both the Concrete Vault Toilet, and the 1,000-gallon septic tank vault. (See Section 1.3, Work Under Other Contracts, Concurrent Work, C&D).
Question 2: Is the CTR to provide site prep, slab, and access measures for the vault toilets? If so, is it to be included in CLIN #1 Base Bid Pricing? Please advise.
Answer 2: CTR is to provide site prep, slab, and access measures for the vault toilet, and 1,000-gallon septic tank vault. Price to be included in CLIN #1 Base Bid Pricing.
Question 3: Does the Government intend to collect spoils from the site work? If so, is there a preferred off-haul site? Please clarify.
Answer 3: Government Does Not intend to collect spoils from the site work. All spoils are to be used on-site to fill where needed.
Question 4: Please clarify whether the entire existing loop is to be fully repaved with 3" HMA, or if surface treatment (e.g., patching or slurry) is intended.
Answer 4: The entire road loop will be completely repaved with Hot Mixed Asphalt (HMA) in lieu of patching and slurry sealing. (See 1.2, Work Covered by Contract Documents, B). Price is part of CLIN #1, Base Bid Pricing.
Question 5: If milling is required, what depth and method is required?
Answer 5: Milling is required as a Class IV (Full Depth Milling). Contractor is to mill and recycle the entire thickness of existing asphalt, along with some of the road base beneath it, and use this mix for the road sub-base in place. Any excess milling shall be removed and placed on the new S-curve road in the new campground addition as sub-base road material where needed.
Question 6: The SF 1442 notes a 60-day Government acceptance period and the CLIN notes a
PoP of July to October. If the Government exercises the full 60-day acceptance period will the
Pop be negotiable?
Answer 6: The Period of Performance (PoP) has a performance period of July 1 to October 31, 2025. The work needs to be completed this season before the weather turns to make the work impossible to complete. It is anticipated award will be made prior to the July 1.
140P8125B0008 Amendment 0001
Question 7: If seasonal weather conditions limit the working conditions onsite, will the PoP be negotiable?
Answer 7: The site work must be completed by this season. It is anticipated that the weather will turn at the end of October. If there are unforeseen conditions, they will be addressed at that point.
Question 8: Are contractors permitted to camp onsite?
Answer 8: Contractors are not permitted to camp onsite and will be required to provide their own housing outside of the park during the work. There may be lodging available in Baker, Nevada, in Ely, Nevada, and at the Border Inn Casino in Baker. There may also be camping outside of the park.
Question 9: Is there onsite water available for use for construction activities?
Answer 9: No, there is no onsite water available for use for construction activities. The contractor will need to provide their own water for all construction activities. There may be water available locally from the Baker Ranches, Inc. They are located just outside of the park, approximately 7-8 miles from the Lower Lehman Campground project.
Baker Ranches, Inc.
2400 Baker Ranch Road
Baker, Nevada 89311, USA
Phone: 775-761-0143.
Contractors may contact other sources too.
B. See Site Visit Attendance sheet on next page.
C. The bid due date remains the same, June 10, 2025, at 2pm PDT.
D. The bid opening will be held on via Microsoft Teams on June 11, 2025, at 2pm PDT. Below is the hyperlink:
https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZjUxNDc5NTktODg2Yi00NGM2LTk0MTMtOTg0ZDM5ZDBiMDdm%40thread
.v2/0?context=%7b%22Tid%22%3a%220693b5ba-4b18-4d7b-9341-f32f400a5494%22%2c%22Oid%22%3a%222da10b0b-e814-41bc-9eff-e60b77ae9f23%22%7d
Meeting ID: 236 488 280 045 0
Passcode: 6Di7W9pm https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZjUxNDc5NTktODg2Yi00NGM2LTk0MTMtOTg0ZDM5ZDBiMDdm%40thread.v2/0?context=%7b%22Tid%22%3a%220693b5ba-4b18-4d7b-9341-f32f400a5494%22%2c%22Oid%22%3a%222da10b0b-e814-41bc-9eff-e60b77ae9f23%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZjUxNDc5NTktODg2Yi00NGM2LTk0MTMtOTg0ZDM5ZDBiMDdm%40thread.v2/0?context=%7b%22Tid%22%3a%220693b5ba-4b18-4d7b-9341-f32f400a5494%22%2c%22Oid%22%3a%222da10b0b-e814-41bc-9eff-e60b77ae9f23%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZjUxNDc5NTktODg2Yi00NGM2LTk0MTMtOTg0ZDM5ZDBiMDdm%40thread.v2/0?context=%7b%22Tid%22%3a%220693b5ba-4b18-4d7b-9341-f32f400a5494%22%2c%22Oid%22%3a%222da10b0b-e814-41bc-9eff-e60b77ae9f23%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZjUxNDc5NTktODg2Yi00NGM2LTk0MTMtOTg0ZDM5ZDBiMDdm%40thread.v2/0?context=%7b%22Tid%22%3a%220693b5ba-4b18-4d7b-9341-f32f400a5494%22%2c%22Oid%22%3a%222da10b0b-e814-41bc-9eff-e60b77ae9f23%22%7d
File details come from the government source that posted it. Updated .