This document is a federal contract amendment (Amendment 0001) for a National Park Service project to apply fog seal on 18 miles of Pinto Basin Road in Joshua Tree National Park. The amendment serves multiple purposes: publishing site visit attendance, answering a contractor's question about edge line requirements, and providing details for the bid opening.

Key details include a site visit held on May 22, 2025, at 8:00 AM, with representatives from Joshua Tree National Park present. The bid opening will be conducted via Microsoft Teams on June 18, 2025, at 2:00 PM Pacific Daylight Time, with the bid due date remaining June 17, 2024, at 2:00 PM PDT. The amendment clarifies that curbed areas are only in pullouts and parking lots, and the rest of the road will require an edge line. The solicitation number is 140P8125B0007, and the project involves road maintenance work in the Joshua Tree National Park area.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P8125B0007 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PPL

Boulder City NV 89005-2426 601 Nevada Way

NPS, PWR - LAKE MABO

05/28/20250001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/15/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See Continuation Page

Period of Performance: 06/20/2025 to 12/19/2025

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Caroline Bachelier

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

140P8125B0007 Amendment 0001

The purpose of this amendment is to:

A. Publish the site visit attendance.

B. Answer Contractor Question:

Q1: In the Scope of Work document, Section 01 11 00 - Summary of Work 1.2, B 9. it states:

"Curbed areas of roadway do not need edge line." Could you please specify the length of roadway with and without curbing, for both the base and additive sections of Pinto Basin Road?

A1: The only curbed areas on Pinto Basin Rd are in the pullouts and parking lots, so the pull outs and against the parking lots do not need an edge line. The rest of the road does not have curbs so it will need an edge line.

C. The bid opening will be held on via Microsoft Teams on June 18, 2025, at 2pm Pacific Daylight

Time (PDT). Below is the hyperlink:

https://teams.microsoft.com/l/meetup-join/19%3ameeting_YmFiMzQ0N2EtZDYxMS00YzFlLWE1ZmYtMDYzOWMxOGE4YjU0%40thread.

v2/0?context=%7b%22Tid%22%3a%220693b5ba-4b18-4d7b-9341-f32f400a5494%22%2c%22Oid%22%3a%222da10b0b-e814-41bc-9eff-e60b77ae9f23%22%7d

D. The bid due date remains the same, June 17, 2024, at 2pm PDT.

File details come from the government source that posted it. Updated .