Sol_140P8124Q0085_Amd_0001.pdf
PDF 134 KB Posted
- Attached to
- Intake Barge and CIP Pumps and Motors - LAKE
- Solicitation number
- 140P8124Q0085
About this file
This document is an amendment to a solicitation (Solicitation Number: 140P8124Q0085) for Intake Barge and CIP Pumps and Motors for the Lake Mead National Recreation Area, issued by the Department of the Interior National Park Service Pacific West Region.
The amendment provides answers to several questions submitted by potential contractors, including details on the existing equipment, pump/motor specifications, and acceptable substitutes. The solicitation due date has been extended from September 4th to September 6th, 2024 to allow contractors more time to prepare their quotes. The scope of work requires the contractor to provide new pumps and motors that match the performance and size of the existing equipment, interface with the existing electrical and plumbing systems, and be furnished from outside the park. No drawing of the existing intake barge pumps is available, but the specifications provide details on the required pump length, motor duty, and impeller trim.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P8124Q0085.pdf | ||
| Attch_1_-_Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P8124Q0085 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PPL
Boulder City NV 89005-2426 601 Nevada Way
NPS, PWR - LAKE MABO
08/28/20240001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/28/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The Contractor shall provide all supplies identified in Attachment 1 - Specifications. All materials shall be new and Contractor-furnished from outside the park. The new pumps and motors must match performance and size of old pumps. New pumps must interface with existing electrical controls and plumbing assemblies.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Maria Stubitz
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment 0001 The purpose of this amendment is to provide the answers to some questions that have been submitted to the contract specialist and to extend the solicitation due date to allow contractors more time to prepare their quotes.
The solicitation due date has been extended from September 4th 2024 at 14:00 PDT to September 6th 2024 at 14:00 PDT
Questions and Answers Q1: Do you have a drawing of existing intake barge pumps?
A1: We do not have drawings. Only what is in the specs.
Q2: On #4, it states total pump length is 12ft long. Is this overall size of pump or is this length from plate to bottom of pump?
A2: 12' from the plate down.
Q3: For the water intake barge motors, assuming this will see outdoor environment, do we need to quote severe duty on this or is standard duty motor fine?
A3: Just what is in the spec. It may be a good idea to add a quote with severe duty as an option.
Q4: For the water intake barge motors, does the motor need to be inverter rated?
A4: Does not need inverter rated.
Q5: For the CIP pump and motor, are other brands/products acceptable?
A5: Please quote any other parts as long as they are like/equal in rating, specs, etc
Q6: For the CIP pump and motor, what is the impeller trim?
A6: The only known info on the impeller trim that we have would be on the pump data plate we provided.
Q7: For the CIP pump and motor, does motor need to be inverter rated?
A7: Does not need to be inverter rated.
Q8: For the CIP pump and motor, does motor need to be severe duty rated or is standard fine?
A8: Motor needs to be comparable/equal to the specs.
Q9: What is the depth of the wet well?
A9: The intake barge sits on Lake Mohave at a depth of approximately 100'.