B09_Amd_1-_Specifications_0001.pdf

PDF 177 KB Posted

Attached to
DEVA-BACKCOUNTRY TOILET-SALINE VALLEY CG Federal contract opportunity
Solicitation number
140P8124Q0033
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This document appears to be a set of specifications for a federal procurement of an ADA wheelchair accessible backcountry toilet building kit with a urine diversion system, storage vault, and drain field. The kit is to be delivered to Death Valley National Park's Saline Valley Warm Springs Campground between September 1 and September 30, 2024. The specifications detail the required features of the toilet building kit, including a shed-style roof, aluminum frame, recycled wall materials, a behind-the-wall urine diversion conveyor system, and a storage vault with access hatch. The kit must also include a urine settling tank, drain field, and 25 Waste Away sacks or equivalent. Delivery requirements include 48-hour advance notice and acceptable delivery times of Monday-Thursday, 7:00 am - 3:30 pm Pacific. This procurement is related to Solicitation Number 140P8124Q0033, "DEVA-BACKCOUNTRY TOILET-SALINE VALLEY CG", issued by the Department of the Interior National Park Service Pacific West Region.

View the file

Other files for this federal contract opportunity

Other files attached to DEVA-BACKCOUNTRY TOILET-SALINE VALLEY CG, newest first.
File Type Posted
Sol_140P8124Q0033_Amd_0001.pdf PDF
B08_Specifications.pdf PDF
B08_Clauses_and_Provisions.pdf PDF
Sol_140P8124Q0033.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS - Amd 1 Supply one (1) ADA wheelchair accessible backcountry toilet building kit with a behind-the-wall urine diversion conveyor system, storage vault with access hatch, and single pipe urine diversion drain-field to Death Valley National Park. Building kit to be installed and maintained at Saline Valley Warm Springs Campground, a remote, difficult to access primitive campground.

Product Specifications (An example of an acceptable product: Wishbone Toilet Building kit from Toilet Tech Solutions OR equivalent Toilet Building kit.)

• Shed style roof, single-stalled, wheelchair accessible, ADA outhouse building with extension, aluminum floor and frame. Walls with some recycled materials is acceptable.

▪ Frame and hatch colored oil rubbed bronze and the wallboard: walnut.

• Features a behind-the-wall urine-diverting conveyor toilet system with a white, fiberglass riser and foot operated conveyor advance system. All drive components shall be stainless steel or approved equivalent.

▪ The system connects to drain-field comprised of a urine settling tank, EZ Flow drain-field pipe or equivalent and all components and parts to complete the system and connect it to the urine diversion toilet.

• Includes a medium-sized vault kit (under the hatch), together with foundation, walls, and floor to house Waste Away sacks or equivalent to catch and contain solid waste for removal. Include 25 Waste Away sacks or equivalent.

Delivery Details:

• Delivery Location: Cow Creek Maintenance Yard, 579 Cow Creek Service Road, Furnace Creek, CA, 92328

• Delivery Contact: TBD

• NPS must receive 48-hour notice in advance of delivery (contact TBD).

• Allowable delivery Times: Monday-Thursday, 7:00 am – 3:30 pm (Pacific). No delivery on weekends (inc. Friday), government holidays, or after 3:30 pm (Pacific) will be accepted.

• The ADA wheelchair accessible backcountry toilet with a behind-the-wall urine diversion conveyor system, storage vault with access hatch, and single pipe urine diversion drain-field must be delivered to Death Valley National Park between September 01, 2024, and September 30, 2024 (Be advised that freight to the park typically arrives less than truck load (LTL)—unless using a carrier like FedEx)

File details come from the government source that posted it. Updated .