Sol_140P8123Q0065_Amd_0001.pdf

PDF 4 MB Posted

Attached to
MAINTAIN LAKE MEAD PARK-WIDE RESTROOM FLOORING
Solicitation number
140P8123Q0065
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P8123Q0065 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PPL

Boulder City NV 89005-2426 601 Nevada Way

NPS, PWR - LAKE MABO

07/05/20230001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/14/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See Continuation Page

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Maria Stubitz

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

140P8123Q0065 Amendment 0001

The purpose of this amendment is to answer contractor questions and to post the visit site sign in sheet.

A. Contractor questions and answers are provided as follows:

Question 1: What is the job classification for the wage determination?

Answer 1: Painter

Question 2: what is the existing paint on the bathroom floors? Is it water-based or oil-based?

Answer 2: These are the links for the existing paint.

- https://cxtincparts.com/cxtinc/product/paint-for-floors-rexthane-gray-gallon.html

- https://www.sherwin-williams.com/painting-contractors/products/armorseal-rexthane-i?itemCatentryId=18425

Question 3: Can the restrooms close to the public while the paint cures?

Answer 3: Yes, restrooms can be closed while the paint cures overnight.

Question 4: Can a contractor work on multiple restrooms at once?

Answer 4: Yes, the contractor can work on multiple restrooms at once.

B. Attached is the correct map for Echo Bay restrooms. EB Restroom 634 Lower does not get epoxy coated. All other contractor documents already reflected this.

C. Attached is the site visit attendance.

D. The quote due date remains the same, 7/18/2023 at 2pm.

https://cxtincparts.com/cxtinc/product/paint-for-floors-rexthane-gray-gallon.html https://cxtincparts.com/cxtinc/product/paint-for-floors-rexthane-gray-gallon.html https://www.sherwin-williams.com/painting-contractors/products/armorseal-rexthane-i?itemCatentryId=18425 https://www.sherwin-williams.com/painting-contractors/products/armorseal-rexthane-i?itemCatentryId=18425 slluke Line slluke Callout

DO NOT EPOXY COAT EB RESTROOM 634 LOWER

Maps - Restroom Flooring Corrected 20230628.pdf
Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7

File details come from the government source that posted it. Updated .