This document outlines a solicitation for the replacement of 103 backflow preventers at six park locations within Lake Mead National Recreation Area. The National Park Service requires the supply and installation of 16 backflow preventers at Echo Bay, NV, 15 at Callville Bay, NV, 15 at Las Vegas Bay, 20 at Cottonwood Cove, NV, 17 at Temple Bar, AZ, and 20 at Willow Beach, AZ. The contractor shall provide all labor, materials, equipment, credentials and licensure to complete the work, including mechanical joints, piping, gaskets and fittings to provide a functioning water system. Site work is to begin on or around June 15, 2022 and be finished within 180 days of award. The NAICS code is 221310 with a size standard of $30 million in annual receipts. This is a total small business set-aside. The RFP will be available on April 19, 2022 via SAM.gov and close 21 days after issuance. An organized site visit is planned. The government intends to award a single fixed-price contract through a best value determination of price and non-price factors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LAKE MEAD NATIONAL RECREATION AREA (LAKE)

BOULDER CITY, NEVADA

Replace Backflow Preventers at Temple Bar, AZ and Willow Beach, AZ

PMIS# 289733 & 289735

IAP#

AT LAKE MEAD NATIONAL RECREATION AREA FY21

STATEMENT OF WORK

Revision 1 - 4 May 2022

Scope of Work

SCOPE OF WORK

Project Identification: The purpose of this contract is for a contractor, with the appropriate credentials and Licensure to replace backflow preventors at Echo Bay, NV, Callville Bay, NV, Las Vegas Bay, NV, Cottonwood Cove, NV, Temple Bar, AZ, and Willow Beach, AZ(See attachment for specs). Work includes associated mechanical joints needed, parts, new piping, gaskets, fittings, thrust blocking, delineation, flagging, traffic control, backfill and labor where needed to provide a functioning water distribution system that satisfies the needs of the NPS unit as determined by NPS personnel. The new backflows must be installed one at a time and tested for proper operation to minimize any chance of down time for downstream customers. Switch over to new backflow preventors will be scheduled with and observed by NPS personnel.

Disposal of all replaced devices and associated hardware must be removed off site by the contractor. Water Outages: If the instillation requires a water outage to a concession facility or a residential area, the Contractor shall notify the COR 2 business days in advance excluding federal holidays. The Contractor shall provide the COR with a detailed spreadsheet that includes size, s/n, location, GPS coordinates, model and type of device.

PROJECT LOCATIONS:

Echo Bay, NV developed area.

Temple Bar, AZ developed area Cottonwood Cove, NV developed area Willow Beach, AZ developed area Las Vegas Bay, NV developed area Callville Bay, NV developed area

Replace and Successfully Test/Certify Backflow Preventers at EB, CB, LVB, CC, NV and TB, WB, AZ Replace 17 backflow preventors at Echo Bay, NV (See attachment for specs).

Replace 18 backflow preventers at Callville Bay, NV (See attachment for specs).

Replace 15 backflow preventers at Las Vegas Bay, NV (See attachment for specs).

Replace 20 backflow preventers at Cottonwood Cove, NV. (See attachment for specs).

Replace 16 backflow preventers at Temple Bar, AZ (See attachment for specs).

Replace 21 backflow preventers at Willow Beach, AZ (See attachment for specs).

(All backflow preventers marked in red on the Backflow Preventor Specification List attachement) All devices must be testable devices and appropriate for the application in which it is installed.

New backflows must be NSF 60 & 61 compliant for use with drinking water. New devices must be approved for outdoor use in extreme climate conditions.

Contractor will supply new gaskets, fittings and/or piping when required for proper function with devices during install.

Contractor is required to submit at minimum a daily progress report, plan for the next day, before and after pics that assist in documenting the installation process and progress.

All Backflow devices must be tested and certified by a certified backflow tester and appropriately tagged with weather and UV resistant tags capable of a lifespan of greater than one year. Contractor must reinstall brass identifying tag or tags that are on current devices.

All gaskets hardware accessories etc. shall be new, appropriately sized and supplied by the contractor. The contractor will not reuse any associated parts and pieces from the replaced devices.

New devices must be installed per manufactures specification in each discrete application to ensure protection of the distribution system and per ADEQ and NDEP regulatory guidelines respectively.

Records must be maintained and conveyed to the NPS to include Serial number, size, Make and Model, Date installed, GPS location for each device, and tested/certified date and must be conveyed in a digital format such as excel.

All devices must pass certification testing.

New Backflow devices will have the following characteristics:

• Single access cover and modular check construction for ease of maintenance

• Top entry - all internals immediately accessible

• Captured springs for safe maintenance

• Internal relief valve for reduced installation clearances

• Replaceable seats for economical repair

• Bronze body construction for durability 1⁄4" – 2"

• Ball valve test cocks — screwdriver slotted 1⁄4" – 2"

• Large body passages provides low pressure drop

• Compact, space saving design

• No special tools required for servicing

PERFORMANCE PERIOD:

This contract will have an initial period of performance of 180 calendar days from time of award.

CONTRACTOR PERSONNEL

The services will be performed by a quoter with the appropriate credentials and licensure.

QUALITY CONTROL - All work shall be performed in accordance with the following:

Industry Standards:

The Uniform Plumbing Code; Recommended Practice for Backflow Prevention and Cross- Connection Control.

The Manual of Cross-Connection Control.

State Administrative Codes:

Arizona Administrative Code (AAC): title 18 - environmental quality, chapter 4 - department of environmental quality safe drinking water, supp- 04-1, article 1 - general requirements, Section R18-4-115 - Backflow Prevention.

Nevada Administrative Code (NAC) and Nevada Revised Statutes (NRS): NAC 445A.67245

Water Outages: If the instillation requires a water outage to a concession facility or a residential area, the Contractor shall notify the COR 48 hours in advance. The Contractor shall provide the COR with the BPA number, and the length of the proposed outage.

All items must be NSF 60 & 61 approved

PHYSICAL SECURITY

Some locations may be secured and the quoter must make arrangements to access those locations with the assigned COR, 24-hour notice must be given to COR before accessing those locations.

HOURS OF OPERATION/WORK SCHEDULE

Standard hours of operation/work shall be Monday through Friday between the hours of 7:00 AM and 4:00 PM unless alternate hours are approved by the Contracting Officers Representative (COR). The Contractors proposed quote price should be based on working only during standard workdays and hours.

Work Schedule: As soon as the Contractor receives the "Notice to Proceed" letter from the Contracting Officer he/she shall develop a work schedule and submit it to the COR for approval, starting with the orientation meeting. The COR will use this schedule to provide to coordinate with other involved NPS work groups as well as concessionaires. The schedule should consist of the targeted day of the week for weekly service during the high use season March-October, as well as the date of first service for the year.

CONTRACTOR USE OF SITE

General: Limit use of the site during the period of preformance to the project area limits as outlined on the attached site maps. Do not disturb portions of the site beyond the project area limits.

Park Entry: The contractor shall furnish a list of personnel with phone contact information.

Vehicles associated with the contractor shall be waived entrance fee upon entering in a marked company vehicle or by providing the names of employees entering in personal vehicles. The entrance fee is waived only for the purpose of reporting directly to a specific work location. Any deviation for recreational purposes is subject to payment of required entrance fees.

Site Access: The contractor shall access the project site as outlined on the attached site maps. Do not drive vehicles off road or access non-project areas without permission from the contracting officer or park superintendent.

Park Regulations: Ensure all personnel (contractors, subcontractors, and vendors) entering or working in the park are familiar with and obey all park regulations. Law enforcement rangers will intervene if they perceive any unsafe or unlawful activity.

Working Hours: Regular work hours shall be limited to daylight hours from 7:00 a.m. until 5:00 p.m. Monday through Friday, excluding government holidays. Work outside regular hours requires approval from the contracting officer.

No Smoking Policy: Smoking is prohibited inside or outside within 25 feet of any buildings in the park. This applies to existing buildings, buildings under construction, and buildings under renovation. Discarding of tobacco products or debris anywhere other than into designated tobacco receptacles is considered littering and subject to fines.

Staging and Storage: Confine storage of equipment and materials to the staging / lay-down / storage areas identified on the attached site maps or as established at the preconstruction meeting.

Parking: The contractor shall park vehicles and heavy equipment in designated areas for contractor use or as established at the preconstruction meeting. Vehicles are not permitted within long-term or overnight parking along roads or in associated overlooks / pull-outs.

Driveways and Entrances: The contractor shall keep driveways and entrances serving the premises clear and available to the government, government employees, and emergency vehicles at all times.

Preservation of Natural Features: Prevent damage to natural surroundings. Restored damaged areas and replace damaged trees, vegetation, and grass at no expense to the government.

Refer also to Section 01 11 40 Work Restrictions and Section 01 50 00 Temporary Facilities & Controls.

CONSERVATION OF UTILITIES

All Contractor personnel shall make every effort to conserve energy when performing

MEETINGS

One Prebid site visit will be scheduled prior to close of solicitation for all interested bidders to attend

After contract award the Contractor shall attend an orientation meeting to be conducted at the Lake Mead Maintenance Warehouse Building, located at 101 Katzenbach Dr, Boulder City, NV 89005.

Lake Mead personnel will be present to go over park regulations and the specific requirements of the project with the contractor.

TECHNICAL REQUIREMENTS

Contractor is required to submit at minimum a daily progress report, plan for the next day, before and after pics that assist in documenting the installation process and progress.

Work includes associated mechanical joints needed, parts, fittings, thrust blocking, delineation, flagging, traffic control, trenching, grading, backfill and labor to provide a functioning water distribution system that satisfies the needs of the NPS unit as determined by NPS personnel.

The design of this project must be approved by NPS LAKE Utility Office.

The contractor will be responsible for any required permits or compliance needs from the State of Arizona and Nevada. All new utility work will comply with AWWA, NPS and State of Arizona and Nevada regulations. Permits must be stamped by a AZ, NV P.E. when required. Copies of all permit submittals and approvals will be provided to NPS asap.

Call dig alert at 811 before any trenching or excavation.

GENERAL DEFINITIONS

QUALITY ASSURANCE. Actions taken by the Government to assure services meet contract requirements.

QUALITY CONTROL. Those actions taken by a Contractor to control the performance of services to ensure services meet the requirements of the SOW.

TECHNICAL DEFINITIONS

Technical Definitions are described in the BPA manufacturers Operating and Service Manual, and Section 3 of this SOW

GENERAL INFORMATION

The Contractor shall furnish all labor, materials, permits, disposal fees and equipment necessary to complete the project scope of work.

CERTIFICATES/CREDENTIALS

Certifications/Credentials at a minimum should include all pertinent state and federal certifications held by the contracting company and individual technicians who will perform the work onsite.

Capability/Capacity

Capability/Capacity at a minimum should describe the number and credentials of all credentialed employees involved in the all aspects of the project.

GENERAL INFORMATION

The contractor shall have access to the publications listed below to ensure the work is accomplished in accordance with the manufacturer's recommendations and that the work is properly documented prior to submittal to the Government.

PUBLICATIONS

Autoflusher Manufacturers Operating and Service Manuals.

Arizona Administrative Code (AAC): TITLE 18 - ENVIRONMENTAL QUALITY, CHAPTER 4 - DEPARTMENT OF ENVIRONMENTAL QUALITY SAFE DRINKING WATER, Supp -04-1, ARTICLE 1 - GENERAL REQUIREMENTS, Section R18-4-115 - Backflow Prevention.

Nevada Administrative Code (NAC), and Nevada Revised Statutes (NRS): NAC 445A.67245 - Cross-connections and backflow: Duties of certified backflow prevention assembly tester.

The Uniform Plumbing Code; Recommended Practice for Backflow Prevention and Cross- Connection Control.

The Manual of Cross-Connection Control.

American Water Works Association (AWWA), CA-NV Section.

PERFORMANCE REQUIREMENTS SUMMARY

The final finished product shall be validation/certification that all BPAs listed on the Price Schedule are fully functioning and have passed all required tests. If a BPA does not pass the initial test, repairs or adjustments shall be made until the BPA can successfully pass the test.

PERFORMANCE EVALUATION

The Performance Evaluation will be based on the spot inspection performed by the COR and the reports submitted by the Contractor.

CONTRACTOR PAYMENT

Payment will take place after the Contractor provides the Government with all the documents listed.

REQUIRED REPORTS

GENERAL INFORMATION

All reports shall be submitted in electronic format, plus one signed original paper copy set.