Sol_140P8121Q0091_Amd_0002.pdf

PDF 118 KB Posted

Attached to
RETROFIT DOORS & REPAIR DOOR FRAMES
Solicitation number
140P8121Q0091
Issued by

View the file

Other files

File Type Posted
A04_SOW_Rev1_8-19-21_0002.pdf PDF
Sol_140P8121Q0091_Amd_0001.pdf PDF
B03_SCA_Minimum_Wage_Determination.pdf PDF
Sol_140P8121Q0091.pdf PDF
A04_SOW.pdf PDF
A06_Photo_1_Door.pdf PDF
A06_Location_Maps.pdf PDF
A06_Door_Frame_Example.JPG JPG image
A06_Photo_2_Vault_Doors.pdf PDF
A06_Door_Frame_Example_2.JPG JPG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P8121Q0091 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PPL

Boulder City NV 89005-2426 601 Nevada Way

NPS, PWR - LAKE MABO

08/19/20210002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/30/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

AMENDMENT NO. 02 - The purpose of this amendment is to attach a revised SOW (dated 8/19/21) and extend the closing date of this solicitation to Monday, August 23, 2021 at 2:00pm PDT.

There are no other changes to the terms of this solicitation.

Legacy Doc #: NPS

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Statement of Work

PMIS 265514A Retrofit Damaged Doors & Doors Frames in 18 High Use

Vault Toilets

Part 1: Scope/Background/Objective

1.1 Scope of Work

Retrofit 20 damaged commercial metal doors with hinges and dead bolts and repair frames if needed. Doors w/Louver will be replaced with solid doors. Dead bolt will be keyed same as the existing dead bolt on park vault toilets doors. The doors will be w/deadbolt prep/primed/painted/dark brown color metal doors/w spring hinges (stainless steel). Door frames that are damaged, only the section that is damaged will be replaced and frame will be painted dark brown. Contractor will properly dispose of all old doors and debris.

Locations: Belle campground: vault #1, just door & hinges, # 2 doors & hinges and repair on frame.

Sheep Pass campground: vault # 1 just door & hinges, #2, just door & hinges, #3 just door & hinges, #4 just door & hinges, #5 just door & hinges, #6 just door & hinges.

Hidden Valley campground: vault # 1 just door & hinges, #2 just door & hinges, #3 just door & hinges, #4 just door & hinges, #5 just door & hinges, #6 just door & hinges, Day Use areas; Barker Dam: just 2 doors 7 hinges, Hidden Valley day use; 2 double vault toilets, just 4 doors & hinges, Intersection Rock: only needs repair done bottom of door frame.

1.2 Background

The visitation to Joshua Tree National Park has reached 3 million creating a heavy use of vault toilets. These doors at Belle, Sheep Pass and Hidden

Valley campgrounds are the original doors when the vault toilets were installed in 1998 and are not designed for the heavy visitor use that they are subjected to. Properly and easily closing doors to vault toilet are an integral part of visitor safety and visitor experience.

1.3 Objective

To improve the visitor safety and visitor experience, in accessing Joshua Tree National Park vault toilets.

Part 2: Contractor Tasks & Supplies

Contractor will remove doors and replace with powder coated/dark brown metal doors;

in Belle campground(vault #1, # 2 door and repair on frame), Sheep Pass campground (vault # 1-6), Hidden Valley campground (vault # 1-6), Day Use areas; Barker Dam (2 doors), Hidden Valley day use; 2 double vault toilets (4 doors), Intersection Rock (only needs repair done on door frame).

Part 3: Contract End Items

JOTR personnel will make inspection of all doors and the repaired frames working properly and all debris removed.