Revised_Specifications_0001.pdf

PDF 331 KB Posted

Attached to
Split Rail Fence Materials Federal contract opportunity
Solicitation number
140P6425Q0114
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This document is a Revised Specification for Cedar Split Rail Fence Materials for Zion National Park, issued by the National Park Service Interior Regions 6/7/8 Ohio Major Acquisition Buying Office. The specification requires 1,860 cedar split rail fence rails and 972 cedar split rail fence posts, with specific material requirements including untreated cedar, minimum dimensional specifications, and split (not milled) construction. The materials must be delivered to the Zion National Park Maintenance Yard in Springdale, UT within 120 days after contract award, with unloading to be performed by park staff. The procurement will be made as one lot, with delivery FOB Destination, and the materials must be fully assembled and ready for immediate operation upon delivery.

View the file

Other files for this federal contract opportunity

Other files attached to Split Rail Fence Materials, newest first.
File Type Posted
Sol_140P6425Q0114_Amd_0001.pdf PDF
Questions_and_Answers_0001.pdf PDF
Specifications.pdf PDF
Sol_140P6425Q0114.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Zion National Park Springdale, UT

Revised Specifications:

Split Rail Fence Materials

NATIONAL PARK SERVICE

INTERIOR REGIONS 6/7/8

OHIO MAJOR ACQUISITION BUYING OFFICE

8/11/2025

Suggested Product: Cedar Split Rail Fence Posts & Rails

Cedar Split Rail Fence Rails Quantity: 1860 Pieces

Cedar Split Rail Fence Posts Quantity: 972 Pieces

Salient Characteristics:

Rails

Untreated cedar Minimum thickness of one 4” side and one 6“side.

Length of 10 feet minimum All cedar post shall be split along the grain, not milled All cedar rails shall be straight and true and be able to be held consistently level when installed horizontally.

Posts

Untreated cedar Blank (no hole) Posts preferred Two Hole Posts acceptable Minimum thickness of two 6” sides Length of 78 inches (+ or – 2”) All cedar posts shall be straight and true and be able to be plumb when installed vertically.

All cedar post shall be split along the grain, not milled

Delivery Location:

Materials/Product must be delivered to the following location:

Zion National Park Maintenance Yard

1 Zion Park Boulevard

Springdale, Ut 84767

Delivery and Instructions:

Delivery: 120 days after contract award effective date or sooner Unloading will be performed by Zion National Park staff with Zion National Park equipment

Arrangements for delivery must be made with Delivery COR or POC 1 (one) week prior to shipment:

a. NPS COR/POC:

b. Contact info:

i. Phone/Mobile COR:

Email:

Applicable performance standards:

Delivery will be FOB Destination Award to be made as ONE LOT to include all information listed in the above characteristics Equipment must be fully assembled, tested, and ready for immediate operation upon delivery

File details come from the government source that posted it. Updated .