B08_Solicitation-SOWrevised_0001.pdf

PDF 1 MB Posted

Attached to
FIRE SYSTEM UPS INSPECTIONS IAW SOW Federal contract opportunity
Solicitation number
140P6425Q0111
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This Statement of Work (SOW) details the annual inspection requirements for Uninterrupted Power Supply (UPS) units at the Gateway Arch National Park in St. Louis, Missouri. The project consists of a base year with two optional years to inspect and test eight UPS units: six Eaton FE1.8KVA UPSs and two Eaton 93PM-100-2 UPSs with two Eaton 93PM IBCS Integrated Battery Cabinets. These UPS units are critical to the fire suppression system, ensuring continuous power during potential outages and supporting emergency evacuations.

The National Park Service seeks a certified, qualified, and licensed contractor to perform comprehensive inspections, including visual assessments, internal and external operating parameter checks, environmental evaluations, battery cabinet inspections, and monitoring system reviews. The work will be performed at 11 North 4th Street, St. Louis, with inspections scheduled between 6:00 a.m. and 2:30 p.m., Monday through Friday, excluding weekends and federal holidays. The contractor will coordinate inspection times with the Contracting Officer's Representative (COR) and provide a written report detailing inspection results and recommendations for future maintenance or upgrades.

View the file

Other files for this federal contract opportunity

Other files attached to FIRE SYSTEM UPS INSPECTIONS IAW SOW, newest first.
File Type Posted
Service_ComboSynop_0001.pdf PDF
Questions_and_Answers-JEFF_0001.pdf PDF
Sol_140P6425Q0111_Amd_0001.pdf PDF
Sol_140P6425Q0111.pdf PDF
B08_Solicitation-Price_Schedule.xlsx XLSX spreadsheet
B03_DOL_Wage_Determination.pdf PDF
B08_Solicitation-_SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gateway Arch UPS inspections

Statement of Work: Fire System Uninterrupted Power Supplies

Annual Inspection at the Gateway Arch National Park – JEFF

11 N 4th Street, St. Louis, MO 63102

Prepared by Lance Ott

04/03/2025

Table of Contents

1.0 Project Description / Summary:

2.0 Objectives:

3.0 Background:

4.0 Specific Work / Tasks:

5.0 Special Conditions / Requirements:

6.0 Place Of Performance:

7.1 Performance Period / Schedule Requirements:

8.0 Warranty:

9.0 Attachments:

I. 1.0 Project Description / Summary:

This project will consist of a base year with two optional years to perform an annual inspect & test eight (8) Uninterrupted Power Supply (UPS) Units, six (6) Eaton FE1.8KVA UPSs and two (2) Eaton 93PM-100-2 UPSs with (2) Eaton 93PM IBC- S Integrated Battery Cabinets, which are part of the Fire Suppression System. The

UPSs ensure that power is continuous and uninterrupted in the event of a power outage, safeguarding the proper operation of the fire suppression system during normal operations and emergency evacuations of the Arch visitors and staff at the

Gateway Arch National Park.

I. 2.0 Objectives:

The National Park Service is looking for a certified, qualified, & licensed contractor to perform the tasks required in section 5.0 to complete this project in a timely manner.

II. 3.0 Background:

The UPSs were installed in 2018 with the structural renovations at the Gateway Arch

National Park Visitor Center. The Arch is currently open to the public 362 days a year and the UPSs are necessary to ensure the safety of the visitor and employees at the park.

4.0 Specific Work / Tasks:

a. Contractor will provide a scheduled of the Preventative Maintenance

(PM) Inspect/diagnosis with the park representative or the Contractor

Officer Representative (COR).

b. Contractor will perform the following maintenance tasks on the UPSs:

I. Visual Inspection

a. Initial consultation to review the scope of work, assessing the feasibility testing, and considering any potential negative impacts of Maintenance inspections on unit/facility operations.

b. Inspect all printed circuit boards connections for cleanliness, swab contacts if necessary.

c. Inspect all power connections for signs of overheating.

d. Inspect all subassemblies, bridges and legs for signs of component defects or stress.

e. Inspect all DC capacitors for signs of leakage and swelling.

f. Inspect all AC capacitors for signs of leakage and swelling.

g. Inspect and inventory all customer owned spare parts.

II. Internal Operating Parameters

a. Inverter leg input and output current (if applicable)

b. Output filter current average phase balance (if applicable)

c. AC Protection settings and operation (if applicable)

d. DC Protection settings and operation (if applicable)

e. Input and Output Frequency settings.

f. Verify DC filter capacitance.

g. Verify AC tank and trap filter capacitance.

III. External Operating Parameters

a. Record System Input Voltages(all phases)

b. Record System Input Currents(all phases)

c. Record DC Charging Voltage (float and equalize)

d. Rectifier phase on and walk up

e. Inverter phase on and walk up

f. Adjust all panel meters to measured values

g. System Bypass Voltages (all phases)

h. Manual and UV Transfer Testing, verify uninterrupted transfer.

i. Conduct a power outage simulation, closely monitoring and metering the batteries throughout the process.

j. Generator Testing to be completed in conjunction with customer, if requested.

IV. Environmental Parameters

a. UPS area ambient temperature and condition of ventilating equipment.

b. General Cleanliness of UPS internals

c. General Cleanliness of the area surrounding the UPS unit.

d. Replace all air filters.

e. Clean control panel/CRT screen.

V. Battery Cabinet Checks

a. General appearance of Battery System (all types)

b. General cleanliness of Battery System area. (all types)

c. Battery System area ambient temperature and condition of ventilating equipment.

VI. Monitoring System Parameters

a. Alarm archive review

b. Alarm lamp test - local and remote

c. Replace all open monitor bulbs

d. Download and review alarm history

VII. General

a. Customer Consultation

b. Verbal Recommendations

c. General Observations

d. Following the Major PM inspection, a written report will be provided detailing the results of the inspection, and making specific recommendations toward future remedial action, upgrades, or sparing.

c. Contractor will perform an operational test in presence with the COR, after all inspections/adjustment have been completed to ensure the operation of the doors are working properly.

d. Contractor is responsible to clean their work area each day and at the end of the job.

5.0 Special Conditions / Requirements:

a. All work including work practices is subject to inspection and approval by the

Contracting Officer’s Representative (COR). Work or work practices are subject to inspection by regulatory personnel.

b. Contractor shall be responsible to repair any utilities, equipment supports, piping, conduits or wiring damaged during contract activities/construction and shall make all necessary repairs at Contractor expense.

6.0 Place of Performance:

a. Gateway Arch National Park

I. 11 North Fourth Street, II. St Louis, Missouri 63102-1880

7.0 Performance Period / Schedule Requirements:

a. All work must be for base year and each option year beginning 1 September will be scheduled with COR (Contracting Officer’s Representative) within 30 days after award.

b. Work hours will be scheduled between 6:00 a.m. and 2:30 p.m. Monday through

Friday. No Weekends or Federal Holidays.

c. Contractor will coordinate inspection times and dates with the COR.

d. Base year plus up to two option years

I. Base Year: 9/1/25 - 8/31/26

II. Option year one: 9/1/26 - 8/31/27

III. Option Year two: 9/1/27 - 8/31/28

Warranty:

a. N/A

9.0 Attachments: Below: FE1.8KVA Eaton UPS Serial Numbers and Data Plates

Attachments: Below: 93PM-100-2 Eaton UPS Serial Numbers and Data Plates 9.1

File details come from the government source that posted it. Updated .