Q_A_-_UPDATED_0002.pdf
PDF 92 KB Posted
- Attached to
- CUVA Road & Parking Lot Improvement Federal contract opportunity
- Solicitation number
- 140P6424B0009
About this file
This document is a set of Questions and Answers related to a Solicitation for a Road & Parking Lot Improvement project at Cuyahoga Valley National Park in Ohio. The Solicitation Number is 140P6424B0009 and the project is expected to be valued between $250,000 and $500,000. The work will involve patching, a 2-inch asphalt overlay of approximately 112,400 SF of road and parking lot, repainting of markings, and refurbishment of culvert and drainage systems. The contract will be a firm-fixed price award to a small business, with performance required to be completed within 120 days of the Notice to Proceed. The Questions and Answers address items such as work hours, anticipated award timeline, construction drawings, pavement markings, and the extent of milling/grinding required. An organized site visit is scheduled for July 31, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6424B0009_Amd_0002.pdf | ||
| Q_A_0001.pdf | ||
| Sol_140P6424B0009_Amd_0001.pdf | ||
| REVISED_Project_Specifications_0001.pdf | ||
| Construction_Contract_Administration.pdf | ||
| WD_-_Cuyahoga_County__OH.pdf | ||
| Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| Submittal_List.pdf | ||
| Bid_Schedule.xlsx | XLSX spreadsheet | |
| Sol_140P6424B0009.pdf | ||
| Project_Specifications.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Road & Parking Lot Improvement
Cuyahoga Valley National Park
Solicitation #140P6424B0009
Questions & Answers
Question #1 – Is it possible to start earlier than the 8-5 time?
Answer – Contractors may work on weekends, holidays, or outside normal “8 to 5” hours so long as they request and receive permission from the COR/CO and coordinate it with them.
Question #2 – Do you anticipate this project being awarded and the NTP issued this fall, or will the NTP likely be issued next spring?
Answer – We anticipate the NTP being issued this year. Based on our current estimated timelines of the contract award process, we anticipate the NTP being issued in early September, which we believe would allow for work to be completed within the 120 day period of performance.
Question #3 – Will NPS be issuing construction drawings for this project?
Answer – We do not have any construction drawings for this project, all available images and other reference materials are provided in the Project Specifications.
Question #4 – Does the NPS want to include a center line running from Riverview to the railroad in the pavement marking scope?
Answer – Yes, one yellow line down the center will work. All pavement markings should be installed like they are currently now.
Question #5 – Projection Specifications, Page 4, D. a. ii.
states “grind entrance drive and both sides of railroad crossing to march roadway for new asphalt…” My interpretation is that we are grinding the entire entrance drive from Riverview Rd. to just past the railroad tracks. Is this correct, or are you only looking for transitional milling at Riverview Rd. and the railroads tracks?
Answer – What we are looking for is transitional milling so the new asphalt will match the other surfaces. We are not looking to have the entire roadway be milled from Riverview Rd. to past the railroad tracks. There is some spot milling on the roadway for some repairs that have asphalt damage before the new asphalt is installed.