Specifications_revised_0001.pdf

PDF 138 KB Posted

Attached to
POLYURETHANE FOAM FOR MINE CLOSURES Federal contract opportunity
Solicitation number
140P6423Q0027
Issued by
Department of the Interior National Park Service Midwest Region

View the file

Other files for this federal contract opportunity

Other files attached to POLYURETHANE FOAM FOR MINE CLOSURES, newest first.
File Type Posted
Questions_and_Answers_0001.pdf PDF
Sol_140P6423Q0027_Amd_0001.pdf PDF
Specifications.pdf PDF
Sol_140P6423Q0027.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Isle Royale National Park

Houghton, Michigan

Specifications:

Polyurethane Foam Purchase for

Abandoned Mineral Land Closures

DATED: April 3, 2023

NATIONAL PARK SERVICE

INTERIOR REGIONS 3, 4 & 5

OHIO MAJOR ACQUISITION BUYING OFFICE

PROJECT:

Polyurethane Foam Purchase

Isle Royale National Park

Confidentiality

The information developed under this Contract is the property of the U.S. government and shall be kept in strict confidence.

Introduction

The National Park Service (NPS) Geological Resources Division will mitigate Abandoned

Mineral Land (AML) features at Isle Royale National Park (ISRO) over the course of the next several years. Due to the Park’s designated wilderness status and remoteness of several AML features, the preferred mitigation option is to plug hazardous AML with backpackable/equipment less Polyurethane Foam.

Scope

Fabrication, and delivery of up to:

- One hundred forty (130) cubic yards of Polyurethane Foam (PUF).

The contractor shall read and understand all notes and requirements from this SOW provided by

ISRO prior to production.

As part of the response to the request for quotes, the contractor must:

- Provide a copy of the MSDS for the PUF.

- Provide a copy of the technical specification of products to be supplied.

Technical Specifications

PUF fabricated by the contractor must have a consistent density at all elevations, must be inert

(only effected by exposure to UV light), must be non-shrinking in dry and/or wet environments, and meet or exceed the following specifications. These specifications are based off of the

Equipment-less Foam Sealant (EFS) brand and will be a brand name or equal requirement.

- The PUF must be a 100 percent water blown system that contains no Hydrofluorocarbons

(HFCs), Chlorofluorocarbons (CFCs), or Hydrochlorofluorocarbons (HCFCs) and have a

Global Warming Potential (GWP) rating no higher than 1.

- The technical specifications are based off the Equipment-less Foam Sealant (EFS) brand.

The typical physical properties of the brand (or equal) include: Core Density (ASTM D-

1622) of 2.6 pcf.; Compressive Strength (ASTM D-1621) of 35 psi.; Tensile Strength

(ASTM D-1623) of 45 psi.; and Shear Strength (ASTM C-273) of 43 psi.

- PUF can be placed directly on standing water.

- Product does not bioaccumulate.

- Product must remain stable provided that it is not exposed to UV light and is stored in a dry environment while shipping/staging.

- Foam must be pourable in 16- to 18-inch-thick layers (i.e., lifts) and not create excessive amounts of heat that would jeopardize the integrity of the PUF plug.

- Product has a melting point/freezing point of 3 degrees C., boiling point/boiling range >

300 degrees C., and a flash point of > 250 degrees C.

- Product has a vapor pressure < 0.00016 mmHG.

Packaging and Shipping Requirements

The contractor must follow the listed packaging and shipping requirements when delivering PUF to ISRO:

- PUF must be backpackable and packaged in self-contained two-part bags that average 1/3 of a cubic yard of foam and weigh between 24 - 27 pounds per bag.

- Bags should be made of thick polyethylene, double sealed, and packed in a protective shipping bag. The product should then be placed in a shipping carton with a 265-to-285-pound crush strength rating that meets or exceeds National Motor Freight Corporation

(NMFC) regulations.

- PUF must be mixable within the bag and pourable from the bag once it is opened.

- Pallet bundles must be covered with plastic wrap to protect cardboard boxes from inclement weather.

Acceptance Criteria

ISRO shall inspect all incoming PUF shipments for proper packaging and signs of damage.

ISRO shall not accept product improperly packaged or damaged.

Project Schedule

The project schedule and deadlines for this contract are provided below (Table 1). Alternative schedules or deadlines will not be accepted. All deliveries will be made to the following address during normal business hours. The phrase “AML Project” must be included on all shipping labels/containers.

Delivery POC: Seth DePasqual

Isle Royale National Park

Attn: AML Project

800 East Lakeshore Drive

Houghton, MI 49931

Table 1: PUF Purchase and Delivery Schedule for FY2023

Item Description Quantity Deadline

Contract Award Project Start - TBD*

Initial Project

Meeting Discuss project, shipping plan - 2 Weeks After Award

Delivery Deadline Delivery of PUF to Houghton, MI 130 cubic yards May 18, 2023

*To Be Determined (TBD)