Questions_and_Answers_0001.pdf
PDF 74 KB Posted
- Attached to
- Octagon Shelter Repairs
- Solicitation number
- 140P6421R0021
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P6421R0021_Amd_0001.pdf | ||
| Bid Schedule - Octagon Shelter.pdf | ||
| Wage Determination - Summit County OH.pdf | ||
| COVID-19 Mask Policy.pdf | ||
| Past Performance Questionnaire.pdf | ||
| Technical Questionnaire.docx | DOCX document | |
| Sol_140P6421R0021.pdf | ||
| Specifications - Octagon Shelter.pdf | ||
| Technical Questionnaire.pdf | ||
| Past Performance Questionnaire.docx | DOCX document | |
| Bid Schedule - Octagon Shelter.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Octagon Shelter Repairs Project – CUVA Questions and Answers listed below:
QUESTIONS:
Question # Question Answer/Response 1.
For painting purposes do the electrical panels need to be removed and reinstalled after the painting is done and if so, do the leads on the outside need to be removed as well?
No the electric panels do not have to be removed to paint and therefore the leads on the outside do not have to be removed or reinstalled