This document is a technical specification section for concrete paving, specifically Section 32 12 13 in Division 32 Exterior Improvements, detailing precise requirements for concrete installation, finishing, and curing for the Minuteman Missile National Historic Site Visitor Center Sidewalk Replacement project. The specification provides comprehensive technical guidance on concrete consolidation, float finishing techniques, and surface treatments, with specific instructions including three potential concrete surface finishes: a medium-to-coarse-textured broom finish (noted as the preferred finish), and two exposed-aggregate finish methods.

Key technical requirements include concrete consolidation using mechanical vibrating equipment, specific floating and finishing procedures, and detailed curing methods such as moisture-retaining-cover curing or curing compound application. The document also specifies strict tolerances for elevation (3/4 inch), thickness (plus 3/8 inch, minus 1/4 inch), surface levelness (1/2 inch gap maximum over 10-foot length), and joint spacing (3 inches), ensuring precise and high-quality concrete paving installation for the National Park Service project at the Minuteman Missile National Historic Site.

View the file

Other files for this federal contract opportunity

Other files attached to MIMI Replace Visitor Center Sidewalk, newest first.
File Type Posted
Sol_140P6325Q0013_Amd_0002.pdf PDF
Atch_1_Site_Visit_Sign_In_Sheet__0001.pdf PDF
Atch_2_Questions_and_Answers_0001.pdf PDF
Sol_140P6325Q0013_Amd_0001.pdf PDF
Sol_140P6325Q0013.pdf PDF
Atch_2_Experience_Questionnaire.xls XLS spreadsheet
Atch_1_Specifications.pdf PDF
Atch_3_DOL_Wage_Determination_SD20250032_1_3_25.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIVISION 32 EXTERIOR IMPROVEMENTS

Section 32 12 13 Concrete Paving

Page | 26

G. Consolidate concrete according to ACI 301 by mechanical vibrating equipment supplemented by hand spading, rodding, or tamping.

1. Consolidate concrete along face of forms and adjacent to transverse joints with an internal vibrator. Keep vibrator away from joint assemblies, reinforcement, or side forms. Use only square-faced shovels for hand spreading and consolidation.

Consolidate with care to prevent dislocating joint devices.

H. Screed paving surface with a straightedge and strike off.

I. Commence initial floating using bull floats or darbies to impart an open-textured and uniform surface plane before excess moisture or bleedwater appears on the surface. Do not further disturb concrete surfaces before beginning finishing operations or spreading surface treatments.

4.8 FLOAT FINISHING

A. General: Do not add water to concrete surfaces during finishing operations.

B. Float Finish: Begin the second floating operation when bleedwater sheen has disappeared and concrete surface has stiffened sufficiently to permit operations. Float surface with power-driven floats or by hand floating if area is small or inaccessible to power units. Finish surfaces to true planes. Cut down high spots and fill low spots.

Refloat surface immediately to uniform granular texture.

1. Burlap Finish: Drag a seamless strip of damp burlap across float-finished concrete, perpendicular to line of traffic, to provide a uniform, gritty texture.

2. Medium-to-Fine-Textured Broom Finish: Draw a soft-bristle broom across float-finished concrete surface, perpendicular to line of traffic, to provide a uniform, fine-line texture.

3. Medium-to-Coarse-Textured Broom Finish: Provide a coarse finish by striating float-finished concrete surface 1/16 to 1/8 inch deep with a stiff-bristled broom, perpendicular to line of traffic.

4.9 SPECIAL FINISHES

A. Monolithic Exposed-Aggregate Finish: Expose coarse aggregate in paving surface as follows:

1. Immediately after float finishing, spray-apply chemical surface retarder to paving according to manufacturer's written instructions.

2. Cover paving surface with plastic sheeting, sealing laps with tape, and remove when ready to continue finishing operations.

3. Without dislodging aggregate, remove mortar concealing the aggregate by lightly brushing surface with a stiff, nylon-bristle broom. Do not expose more than one-third of the average diameter of the aggregate and not more than one-half of the diameter of the smallest aggregate.

4. Fine-spray surface with water and brush. Repeat cycle of water flushing and brushing until cement film is removed from aggregate surfaces to depth required.

SECTION DOES NOT APPLY TO PROJECT

THIS IS THE PREFERED FINISH FOR THE CONCRETE

DOES NOT APPLY

DOES NOT APPLY

Michael Jones Rectangle

DIVISION 32 EXTERIOR IMPROVEMENTS

Section 32 12 13 Concrete Paving

Page | 27

B. Seeded Exposed-Aggregate Finish: Immediately after initial floating, spread a single layer of aggregate uniformly on paving surface. Tamp aggregate into plastic concrete and float finish to entirely embed aggregate with mortar cover of 1/16 inch.

1. Spray-apply chemical surface retarder to paving according to manufacturer's written instructions.

2. Cover paving surface with plastic sheeting, sealing laps with tape, and remove sheeting when ready to continue finishing operations.

3. Without dislodging aggregate, remove mortar concealing the aggregate by lightly brushing surface with a stiff, nylon-bristle broom. Do not expose more than one-third of the average diameter of the aggregate and not more than one-half of the diameter of the smallest aggregate.

4. Fine-spray surface with water and brush. Repeat cycle of water flushing and brushing until cement film is removed from aggregate surfaces to depth required.

4.10 CONCRETE PROTECTION AND CURING

A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.

B. Comply with ACI 306.1 for cold-weather protection.

C. Evaporation Retarder: Apply evaporation retarder to concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing operations. Apply according to manufacturer's written instructions after placing, screeding, and bull floating or darbying concrete but before float finishing.

D. Begin curing after finishing concrete but not before free water has disappeared from concrete surface.

E. Curing Methods: Cure concrete by moisture-retaining-cover curing, curing compound or a combination of these as follows:

1. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover, placed in widest practicable width, with sides and ends lapped at least 12 inches, and sealed by waterproof tape or adhesive. Immediately repair any holes or tears occurring during installation or curing period, using cover material and waterproof tape.

2. Curing Compound: Apply uniformly in continuous operation by power spray or roller according to manufacturer's written instructions. Recoat areas subjected to heavy rainfall within three hours after initial application. Maintain continuity of coating, and repair damage during curing period.

4.11 PAVING TOLERANCES

A. Comply with tolerances in ACI 117 and as follows:

1. Elevation: 3/4 inch.

2. Thickness: Plus 3/8 inch, minus 1/4 inch.

3. Surface: Gap below 10-feet-long; unleveled straightedge not to exceed 1/2 inch.

4. Joint Spacing: 3 inches.