B09_Solicitation_Amendment_2_Updated_Drawings_0002.pdf

PDF 3 MB Posted

Attached to
WICA VISITOR CENTER HVAC REMODEL
Solicitation number
140P6325B0007
Issued by

About this file

This document is an Addendum No. 1 for the NPS WICA HVAC project at Wind Cave National Park in Hot Springs, South Dakota, dated July 17th, 2025. The addendum provides updated mechanical and electrical drawings with specific modifications, including the demolition of VRF units in room PHONE 107, removal of existing equipment (E)XFT-102, updates to split system piping and outdoor unit locations, and additions to the Diffuser, Register and Grille schedule and Split System Air Conditioning Schedule.

Key electrical changes include the addition of SSCU-2 on Sheet E201, addition of SS-2 on Sheet E202, updates to the Equipment Schedule to include SSCU-2, and circuit breaker modifications in switchboard LGB and panel L2B. The addendum emphasizes that prior manufacturer approvals are general and for bidding purposes only, with final product approval contingent upon submittal of product data and shop drawings that meet specific design requirements and specifications. The document consists of two pages of written addendum items and ten pages of supplemental drawings.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

July 17th, 2025 Addendum No. 1 - 1 009258.005

DATE: July 17th, 2025

FROM: The Schemmer Associates

1044 North 115th Street, Suite 300 Omaha, Nebraska 68154 Phone: (402) 493-4800

TO: Prospective Bidders and Plan Holders

RE: Addendum No. 1 to the Bidding Documents for:

NPS WICA HVAC

Schemmer Project No. 009258.005

This addendum is issued by the Architect to the Contractor. This Addendum shall be made a part of the Contract Documents. Acknowledge receipt of this Addendum shall be provided on the Bid Form. Failure to do so may subject Bidder to disqualification.

Prior approval of manufacturers is a general approval only for bidding purposes. Final approval of the products is contingent upon the submittal of product data and/or shop drawings which will have to meet the specific design requirements and the specifications.

This addendum consists of two (2) pages of written addendum items and ten (10) pages of supplemental drawings.

THE SCHEMMER ASSOCIATES INC.

July 17th, 2025 Addendum No. 1 - 2 009258.005

DRAWINGS

MECHANICAL

Item No. DM-1, Sheet M002

See reissued sheet for VRF unit demolition in room PHONE 107 and removal of (E)XFT-102 from plans.

Item No. DM-2, Sheet M101

See reissued sheet for split system piping and outdoor unit location.

Item No. DM-3, Sheet M102

See reissued sheet for split system installation and removal of (E)XFT-102 from plans.

Item No. DM-4, Sheet M501

See reissued sheet for added Diffuser, Register and Grille schedule, and modified Split System Air Conditioning Schedule, as well as removal of (E)XFT-102 from control valve schedule.

ELECTRICAL

Item No. EM-1, Sheet E002

See reissued sheet for mechanical unit demolition in room PHONE 107.

Item No. EM-2, Sheet E201

See reissued sheet for addition of SSCU-2.

Item No. EM-3, Sheet E202

See reissued sheet for addition of SS-2.

Item No. EM-4, Sheet E601

See reissued sheet for addition of SSCU-2 to Equipment Schedule.

Item No. EM-5, Sheet E701

See reissued sheet for addition circuit breaker for SSCU-2 in switchboard LGB.

Item No. EM-6, Sheet E702

See reissued sheet for update to circuit breaker for SSCU-1 in panel L2B.

END OF ADDENDUM NO. 1

M

M

M M

M

M M M

M

M

M

M

M

M

M

M

T

T

T

T

T

T T

T T

T

T

T

T

T

T

(E)XFT-115

(E)XFT-114(E)XFT-113(E)XFT-111(E)XFT-110

(E)XFT-116

(E)XFT-112

(E)XFT-106(E)XFT-104

(E)XFT-103

(E)XFT-109

(E)XFT-108

(E)XFT-107

3 3

(E)XFT-118

(E)XCUH-102

HWS

HWR

HW

R

HW

S

HW

S

HW

R

1044 North 115th Street | Suite 300

Omaha, NE 68154

(402) 493-4800 www.schemmer.com

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATE

305107

80043

C U s e rs \a p o s p is il\

D o c u m e n ts

\R e v it te m p \0

-M E

C H

R a p o s p is il@ s c h e m m e r.

c o m .r v t

AJP

SXR

JEK

01/15/2025

009258.005

M002

DEMO FIRST FLOOR PLAN -

MECHANICAL

NPS WICA HVAC

009258005- 6- M002 DEMO FIRST FLOOR PLAN - MECHANICAL

WIND CAVE NATIONAL PARK

26611 US HIGHWAY 385

HOT SPRINGS, SD

REF. DEMO NOTES ( ):X

1 REMOVE EXISTING BLOWER COIL AND ASSOCIATED REFRIGERANT PIPING. ASSOCIATED

CONDENSATE PIPING TO REMAIN.

2 REMOVE EXISTING BRANCH SELECTOR BOX AND ASSOCIATED REFRIGERANT PIPING.

3 CONTRACTOR TO REMOVE EXISTING CONTROL VALVE. PREPARE FOR INSTALLATION OF NEW

CONTROL VALVE. SEE CONSTRUCTION PLANS AND SCHEDULES FOR ADDITIONAL

INFORMATION. CONTRACTOR TO FIELD VERIFY EXACT LOCATION OF CONTROL VALVES.

4 EXISTING HWS/HWR PIPING SERVING VAV SYSTEM TO REMAIN.

5 REMOVE EXISTING THERMOSTAT AND PREPARE FOR NEW THERMOSTAT INSTALLATION. IF

THERMOSTAT IS NOT INSTALLED AT 48" A.F.F. PACK WALL AND PREPARE FOR ADJACENT.

SCALE: 1/8" = 1'-0"

FIRST FLOOR PLAN - DEMO HVAC PIPING

VRF NOTE:

- CONTRACTOR TO RECORD AND DOCUMENT ALL EXISTING

VRF PIPE ROUTING PRIOR TO REMOVAL. NEW PIPING IS TO

BE INSTALLED IN SPACE OF REMOVED PIPING.

DATE INITIAL

07/17/2025

TRUE

NORTH

PLAN

NORTH

7/18/25

M

M

T

(E)VAV-101

(E)VAV-102

(E )V

AV

-2

(E)VAV-103

(E)XUH-001

(E)VAV-104

(E)VAV-105

(E)XUH-002

(E)XUH-003

(E)XUH-005

(E)XUH-004

(E)AHU-1

(E)AHU-2

CV-107CV-106

CV-105

BS-001

HRV-1

WEIGHT ROOM

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

MECH/ELEC/TELE

VRF UP

VRF UP

VRF

VRF

HWS UP TO (E)

XFT-108, 109

HWS UP TO (E)

XFT-107

HWS

HWR

HWR

HWS

BC-100A, 100B

BC-100A

BC-100B

CWS

HWR

HWS

CWR

CWS

CWR

SF-2

HWC-2

SSCU-2

VRF

RS/RL UP

RS/RL

1044 North 115th Street | Suite 300

Omaha, NE 68154

(402) 493-4800 www.schemmer.com

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATE

305107

80043

C U s e rs \a p o s p is il\

D o c u m e n ts

\R e v it te m p \0

-M E

C H

R a p o s p is il@ s c h e m m e r.

c o m .r v t

AJP

SXR

JEK

01/15/2025

009258.005

M101

SUB-GRADE FLOOR PLAN -

MECHANICAL

NPS WICA HVAC

009258005- 6- M101 SUB-GRADE FLOOR PLAN - MECHANICAL

WIND CAVE NATIONAL PARK

26611 US HIGHWAY 385

HOT SPRINGS, SD

REF. NOTES ( ):X

1 INSTALL HRV-1 ON EXISTING HOUSEKEEPING PAD.

2 PROVIDE ALUMINUM JACKETING FOR ALL VRF PIPING ON EXTERIOR OF BUILDING.

3 REPLACE SUPPLY FAN (SF-2) AND HOT WATER COIL (HWC-2) SERVING (E) AHU-2.

CONTRACTOR TO MATCH EXISTING PARAMETERS. SEE SCHEDULE FOR MORE DETAILS.

4 INSTALL NEW OA MOTORIZED DAMPER SERVING INLET OF (E) AHU-2. CONTRACTOR TO

MATCH EXISTING SIZE AND VOLTAGE. UNIT IS TO HAVE FAIL-CLOSED OPERATION AND BE

CONNECTED TO EXISTING BAS SYSTEM.

5 CONTRACTOR TO INSTALL SSCU-2 ON HOUSEKEEPING PAD. PROVIDE ALUMINUM JACKETING

FOR ALL RS/RL PIPING ON EXTERIOR OF BUILDING.

6 SIZE AND INSTALL REFRIGERANT PIPING PER MANUFACTURER'S REQUIREMENTS AND THE

SPECIFICATIONS. COORDINATE RS/RL PIPE ROUTING IN ROOM WITH EXISTING EQUIPMENT

AND STORAGE ITEMS.

SCALE: 1/8" = 1'-0"

SUB-GRADE PLAN - HVAC PIPING

VRF NOTE:

- VRF SYSTEM IS SHOWN AS A SCHEMATIC LAYOUT.

- VRF SYSTEM IS TO BE THREE-PIPE REFRIGERANT FLOW SYSTEM.

- CONTRACTOR IS TO SIZE AND INSTALL VRF PIPING PER MANUFACTURER'S REQUIREMENTS.

- CONTRACTOR IS TO ROUTE PIPING IN THE SAME SPACE PREVIOUSLY USED FOR VFR WHEN POSSIBLE.

DATE INITIAL

07/17/2025

TRUE

NORTH

PLAN

NORTH

M

M

M

M

M

M

M

M

MMM

M

M M

M

T

T

T

T

T

T

T

T

T

T

T

T T

T

T BC-105

BC-111

BC-106 BC-107

BC-110

BC-108

BC-112

BC-109

BC-102

BC-103

BC-104

(E)P-3

(E)P-4

BC-101

(E)ET

(E)XCUH-101

(E)XFT-106

(E)XFT-112

(E)XFT-116

(E)XFT-115

(E)XFT-114(E)XFT-113(E)XFT-111(E)XFT-110

(E)XCUH-102

(E)XFT-109

(E)XFT-108

(E)XFT-118

(E)XFT-107

(E)XFT-104

(E)XFT-103

(E)XFT-117

LIBRARY

OFFICE

DRAFTING

STOR

OFFICE

OFFICE

WOMEN

MEN

HALL

BOILER ROOM

READY ROOM

ADMIN. STOR

PHONE

EVIDENCE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CV-209

HWR

HWS

CV-201

CV-101

CV-204

CV-205

CV-202

CV-203

CV-102

(E)XFT-105

CV-104

CV-112

CV-211

CV-212

CV-110CV-109

CV-210

ELEV

MEN

WOMEN

OFFICE

OFFICE

STORAGE

DECK

MAINTENANCE

CV-207

CV-108 IN

CABINET

CV-111

CV-103 IN

CABINET

1 VR

F

VRF DN

VRF DN

VRF

VRF

BC-104

BC-103

BC-101

BC-102

BC-111

BC-105

BC-106

BC-107

BC-108

BC-112

BC-110

BC-109

CD

HWR

HW

S

HW

R

HWS

HWR

HW

S

HW

R

HWS

HWR HWR

HWS

HW

S

HW

R

HWS

HW

R

HWR

HWS

(E)BP-1

SS-22

3/4" CD

6x6 R-1

RS/RL

RS/RL DN

1044 North 115th Street | Suite 300

Omaha, NE 68154

(402) 493-4800 www.schemmer.com

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATE

305107

80043

C U s e rs \a p o s p is il\

D o c u m e n ts

\R e v it te m p \0

-M E

C H

R a p o s p is il@ s c h e m m e r.

c o m .r v t

AJP

SXR

JEK

01/15/2025

009258.005

M102

FIRST FLOOR PLAN -

MECHANICAL

NPS WICA HVAC

009258005- 6- M102 FIRST FLOOR PLAN - MECHANICAL

WIND CAVE NATIONAL PARK

26611 US HIGHWAY 385

HOT SPRINGS, SD

REF. NOTES ( ):X

1 NEW BLOWER COIL TO BE INSTALLED IN EXISTING BLOWER COIL LOCATION. EXISTING

CONDENSATE LINE TO BE CONNECTED TO NEW BLOWER COIL.

2 CONTRACTOR TO FIELD VERIFY EXACT LOCATION OF SS-2 IN PHONE 107. COORDINATE

INSTALLATION WITH EXISTING ROOM CONDITIONS.

3 CONTRACTOR TO CONNECT 3/4" CD TO EXISTING CONDENSATE LINE FROM UNIT THAT WAS

REMOVED IN PHONE 107.

4 PROVIDE TRANSFER GRILLE IN WALL. COORDINATE EXACT SIZE WITH PARK STAFF.

5 SIZE AND INSTALL REFRIGERANT PIPING PER MANUFACTURER'S REQUIREMENTS AND THE

SPECIFICATIONS. PIPE ROUTING IS TO BE IN SAME LOCATION THAT WAS PREVIOUSLY USED

FOR REFRIGERANT PIPING SERVING THE FAN COIL REMOVED IN PHONE 107 UNLESS NOTED

ON DRAWINGS.

SCALE: 1/8" = 1'-0"

FIRST FLOOR PLAN - HVAC PIPING

VRF NOTE:

- VRF SYSTEM IS SHOWN AS A SCHEMATIC LAYOUT.

- VRF SYSTEM IS TO BE THREE-PIPE REFRIGERANT FLOW SYSTEM.

- CONTRACTOR IS TO SIZE AND INSTALL VRF PIPING PER MANUFACTURER'S REQUIREMENTS.

- CONTRACTOR IS TO ROUTE PIPING IN THE SAME SPACE PREVIOUSLY USED FOR VFR WHEN POSSIBLE.

DATE INITIAL

07/17/2025

TRUE

NORTH

PLAN

NORTH

1044 North 115th Street | Suite 300

Omaha, NE 68154

(402) 493-4800 www.schemmer.com

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATE

305107

80043

C U s e rs \a p o s p is il\

D o c u m e n ts

\R e v it te m p \0

-M E

C H

R a p o s p is il@ s c h e m m e r.

c o m .r v t

AJP

SXR

JEK

01/15/2025

009258.005

M501

SCHEDULE - MECHANICAL

NPS WICA HVAC

009258005- 6- M501 SCHEDULE - MECHANICAL

WIND CAVE NATIONAL PARK

26611 US HIGHWAY 385

HOT SPRINGS, SD

2. VRF SYSTEM IS TO BE INTEGRATED INTO EXISTING JOHNSON CONTROLS BAS SYSTEM.

NOTES: 1. FIELD COORDINATE EXACT SYSTEM PIPING ARRANGEMENT.

BS-001 SEE PLANS 16 419 208 1 60 1.6 20 TRANE TCMBM1016KA11N4 1,2

MAX CAP TOTAL MBH VOLTS PH HZ MCA MOPMARK LOCATION NO. OF PORTS

COOLING ELECTRICAL

MANUFACTURER AND MODEL NUMBER REMARKS

BRANCH SELECTOR SCHEDULE

4. CONTROL VALVE LISTED AS SUPPLEMENTARY SHALL BE CONTROLLED BY AN AUXILLARY HEATING RELAY FROM THE THERMOSTAT SERVING PRIMARY HEATING...

3. CONTROL VALVE LISTED AS PRIMARY HEATING FUNCTION SHALL BE CONTROLLED BY IT'S OWN THERMOSTAT.

2. VALVE IS TO BE TWO-WAY VALVE WITH BRONZE BODY AND FLOATING POINT CONTROL. VALVE IS TO BE FAIL-OPEN TYPE.

NOTES: 1. VALVE IS TO BE CONNECTED TO BACNET BAS.

CV-212 2-WAY XFT-219 PRIMARY N/A 0.5 1 1,2,4

CV-211 2-WAY XFT-220 PRIMARY N/A 0.75 1 1,2,3

CV-210 2-WAY XFT-214,215,216,217 SUPPLEMENTARY (E) VAV-206 8 1-1/4 1,2,4

CV-209 2-WAY XFT-213,218 PRIMARY N/A 1 1-1/4 1,2,3

CV-208 2-WAY XFT-211,212 SUPPLEMENTARY (E) VAV-205 4 1-1/4 1,2,4

CV-207 2-WAY XFT-209,210 SUPPLEMENTARY (E) VAV-204 4 1-1/4 1,2,4

CV-206 2-WAY XFT-208 SUPPLEMENTARY (E) VAV-203 4 1-1/4 1,2,4

CV-205 2-WAY XFT-207 PRIMARY N/A 0.5 1 1,2,3

CV-204 2-WAY XFT-205 PRIMARY N/A 0.5 1-1/4 1,2,3

CV-203 2-WAY XFT-206 PRIMARY N/A 0.5 1 1,2,3

CV-202 2-WAY XFT-203,204 SUPPLEMENTARY BC-203 2 1 1,2,4

CV-201 2-WAY XFT-201,202 SUPPLEMENTARY BC-201 2 1 1,2,4

CV-113 2-WAY XFT-106 SUPPLEMENTARY BC-110 0.75 1 1,2,4

CV-112 2-WAY XFT-112 SUPPLEMENTARY BC-111 0.5 1 1,2,4

CV-111 2-WAY XFT-116 SUPPLEMENTARY BC-109 1.5 1-1/4 1,2,4

CV-110 2-WAY XFT-113,114,115 SUPPLEMENTARY BC-112 2 1-1/4 1,2,4

CV-109 2-WAY XFT-111 SUPPLEMENTARY BC-108 0.5 1-1/4 1,2,4

CV-108 2-WAY XFT-110 SUPPLEMENTARY BC-107 0.5 1-1/4 1,2,4

CV-107 2-WAY XFT-108,109 SUPPLEMENTARY BC-103 3.75 1-1/4 1,2,4

CV-106 2-WAY XFT-107 SUPPLEMENTARY BC-104 1.25 1-1/4 1,2,4

CV-105 2-WAY XFT-118 PRIMARY N/A 1.25 1 1,2,3

CV-104 2-WAY XFT-105 SUPPLEMENTARY BC-101 0.5 1 1,2,4

CV-103 2-WAY XFT-117 SUPPLEMENTARY BC-102 1.5 1 1,2,4

CV-102 2-WAY XFT-104 PRIMARY N/A 0.5 1 1,2,3

CV-101 2-WAY XFT-101,103 PRIMARY N/A 2.25 1-1/4 1,2,3

MARK TYPE SERVES HEATING FUNCTION PRIMARY HEATING DEVICE FLOW GPM

EXISTING LINE

SIZE (IN.) REMARKS

CONTROL VALVE SCHEDULE

4. PROVIDE UNIT WITH SCR CONTROL.

3. PROVIDE UNIT FACTORY DISCONNECT SWITCH.

2. UNIT IS TO BE CONTROLLED BY SPLIT SYSTEM DEHUMIDICATION SEQUENCE.

NOTES: 1. UNIT IS TO BE CONNECTED TO EXISTING BACNET BAS SYSTEM.

EDH-1 SS-1 320 1.5 208 3 60 GREENHECK IDHB 1,2

KW VOLTS PH HZMARK SERVES

AIRFLOW

(CFM)

HEATER ELECTRICAL DATA

MANUFACTURER AND MODEL

NUMBER REMARKS

ELECTRIC DUCT HEATER SCHEDULE

NOTES: 1. CONTRACTOR TO PROVIDE AND INSTALL DIRECT REPLACEMENT OF EXISTING AHU-2 SUPPLY FAN. CONTRACTOR TO VERIFY AND MATCH ALL EXISTING FAN PARAMETERS PRIOR TO ORDERING.

SF-2 MECH RM. AHU-2 HORIZONTAL DRAW THRU 675 1.0 1.93 2142 1750 1 208 3 SEE NOTE 1 1

TYPE CFM EXT SP... TOTAL SP... RPM RPM HP VOLTS PH

MARK LOCATION SERVES

FAN DATA ELECTRICAL DATA (60 HZ AC)

BASIS OF DESIGN NOTES

FAN SCHEDULE

5. UNIT IS TO HAVE INTEGRAL DISCONNECT.

4. UNIT IS TO HAVE INTEGRAL CONDENSATE PUMP.

3. PROVIDE UNIT WITH REMOTE WALL MOUNTED THERMOSTAT. INSTALL AT 48" A.F.F.

2. VRF SYSTEM IS TO BE INTEGRATED INTO EXISTING JOHNSON CONTROLS BAS SYSTEM.

NOTES: 1. SCHEDULED CAPACITIES ARE BASED ON 80/67 RA AND 95/75 AMBIENT OA CONDITIONS FOR COOLING, 70/60 RA AND 50/45 AMBIENT OA CONDITIONS FOR HEATING.

BC-203 WALL MOUNT BS-001 270 R-410A 11.6 13.1 208 1 60 0.24 15 TRANE TPKFYP012LM140B 1,2,3,4,5

BC-202 WALL MOUNT BS-001 270 R-410A 11.6 13.1 208 1 60 0.24 15 TRANE TPKFYP012LM140B 1,2,3,4,5

BC-201 WALL MOUNT BS-001 174 R-410A 5.8 6.5 208 1 60 0.24 15 TRANE TPKFYP006LM140B 1,2,3,4,5

BC-112 WALL MOUNT BS-001 321 R-410A 14.6 16.5 208 1 60 0.24 15 TRANE TPKFYP015LM140B 1,2,3,4,5

BC-111 WALL MOUNT BS-001 174 R-410A 5.8 6.5 208 1 60 0.24 15 TRANE TPKFYP006LM140B 1,2,3,4,5

BC-110 WALL MOUNT BS-001 270 R-410A 11.6 13.1 208 1 60 0.24 15 TRANE TPKFYP012LM140B 1,2,3,4,5

BC-109 WALL MOUNT BS-001 174 R-410A 5.8 6.5 208 1 60 0.24 15 TRANE TPKFYP006LM140B 1,2,3,4,5

BC-108 WALL MOUNT BS-001 216 R-410A 7.8 8.7 208 1 60 0.24 15 TRANE TPKFYP008LM140B 1,2,3,4,5

BC-107 WALL MOUNT BS-001 174 R-410A 5.8 6.5 208 1 60 0.24 15 TRANE TPKFYP006LM140B 1,2,3,4,5

BC-106 WALL MOUNT BS-001 174 R-410A 5.8 6.5 208 1 60 0.24 15 TRANE TPKFYP006LM140B 1,2,3,4,5

BC-105 WALL MOUNT BS-001 174 R-410A 5.8 6.5 208 1 60 0.24 15 TRANE TPKFYP006LM140B 1,2,3,4,5

BC-104 WALL MOUNT BS-001 174 R-410A 5.8 6.5 208 1 60 0.24 15 TRANE TPKFYP006LM140B 1,2,3,4,5

BC-103 WALL MOUNT BS-001 399 R-410A 17.5 19.4 208 1 60 0.24 15 TRANE TPKFYP018LM140B 1,2,3,4,5

BC-102 WALL MOUNT BS-001 216 R-410A 7.8 8.7 208 1 60 0.24 15 TRANE TPKFYP008LM140B 1,2,3,4,5

BC-101 WALL MOUNT BS-001 270 R-410A 11.6 13.1 208 1 60 0.24 15 TRANE TPKFYP012LM140B 1,2,3,4,5

BC-100B WALL MOUNT BS-001 216 R-410A 7.8 8.7 208 1 60 0.24 15 TRANE TPKFYP008LM140B 1,2,3,4,5

BC-100A WALL MOUNT BS-001 216 R-410A 7.8 8.7 208 1 60 0.24 15 TRANE TPKFYP008LM140B 1,2,3,4,5

RATED CAP TOTAL

MBH

RATED CAP TOTAL

MBH VOLTS PH HZ MCA MOPMARK TYPE

BRANCH SELECTOR

BOX

NOMINAL

CFM REFRIGERANT

COOLING HEATING ELECTRICAL

MANUFACTURER AND MODEL NUMBER REMARKS

VRF BLOWER COIL SCHEDULE

NOTES: 1. CONTRACTOR TO PROVIDE DIRECT REPLACEMENT OF EXISTING COIL. CONTRACTOR TO FIELD VERIFY COIL SIZE AND CONNECTION DIMENSIONS PRIOR TO ORDERING.

HWC-2 MECH. RM AHU-2 675 0.05 331 1 14 x 21 12 -10 68 58.3 200 180.3 6.3 6.8 DAIKIN 1

EAT DB (°F) LAT DB (°F) EWT (°F) LWT (°F)

FLOW

(GPM) WPD FTMARK LOCATION SERVES CFM

APD

(IN WG)

MAX FV

(FPM) MIN ROWS SIZE H x W (IN) FPI

AIRSIDE DATA

MIN CAP MBH

WATERSIDE DATA

MANUFACTURER AND

MODEL NUMBER REMARKS

HOT WATER HEATING COIL SCHEDULE

5. PROVIDE UNIT WITH PANEL HEATER AND LOW AMBIENT KIT.

4. PROVIDE UNIT WITH SNOW/HAIL GUARDS.

3. VRF SYSTEM IS TO BE INTEGRATED INTO EXISTING JOHNSON CONTROLS BAS SYSTEM.

2. FIELD COORDINATE EXACT SYSTEM PIPING ARRANGEMENT IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS.

NOTES: 1. PROVIDE UNIT WITH 24" MANUFACTURER STAND. ANCHOR UNIT TO CONCRETE HOUSEKEEPING PAD WITH VIBRATION ISOLATORS.

HRV-1 SEE PLANS BS-001 R-410A 155.2 172.7 126 -18 66/64 110/100 208 3 60 TRANE TURYP1683N40A 1,2,3,4,5

MCA MOP VOLT PH HZMARK LOCATION SERVES REF TYPE

NOMINAL

CAP CLG (MBH)

NOMINAL CAP

HTG (MBH)

COOLING

AMBIENT TEMP

(°F)

HEATING

AMBIENT TEMP

(°F)

ELECTRICAL DATA

MANUFACTURER AND MODEL NUMBER REMARKS

HEAT RECOVERY UNIT SCHEDULE

8. INSTALL UNIT ON CONCRETE HOUSEKEEPING PAD.

7. PROVIDE UNIT WITH CONTROLLER FOR DEHUMIDIFICATION MODE. UNIT IS TO BE CONNECTED TO EDH-1.

6. PROVIDE UNIT WITH BACNET CONTROLLER. UNIT IS TO BE INTEGRATED INTO JOHNSON CONTROLS SYSTEM.

5. PROVIDE UNIT WITH MICROBLUE CONDENSATE PUMP IF UNIT DOES NOT HAVE INTEGRAL CONDENSATE LIFT MECHANISM.

4. PROVIDE UNIT WITH HEAT PUMP WIND BAFFLES.

3. PROVIDE UNIT WITH 12" PATE ROOF CURB OR EQUAL.

2. PROVIDE WITH HARD WIRED, WALL MOUNTED THERMOSTAT.

NOTES: 1. PROVIDE WITH FACTORY INSULATED REFRIGERANT LINESETS SIZED PER MANUFACTURER REQUIREMENTS.

SS-2 PHONE 107 810 80 67 23.3 22.8 27.2 9.8 - MITSUBISHI PLA-AE24NL SSCU-2 GRADE 95 R454B MITSUBISHI PUZ-AK24NLHZ 24 39 208 1 60 1,2,4,5,6,8

SS-1 MUSEUM STORAGE 321 80 67 11.6 21.8 17.5 9.8 - MITSUBISHI PEAD-AA12NL SSCU-1 ROOF 95 R454B MITSUBISHI PUZ-AK12NL 16 27 208 1 60 1-7

DB WB

AIRSIDE DATA EAT (°F)

RATED CAP (MBH)

EFFICIENCY

(SEER)

RATED CAP @ 47°F

(MBH)

EFFICIENCY

(HSPF)

ELEC HEAT

(KW) MCA MOCP VOLTS PH HZLOCATION

SUPPLY

AIR

CFM

COOLING COIL DATA HEATING DATA

MANUFACTURER AND MODEL

NUMBER MARK LOCATION

AMB TEMP

(°F) REFER TYPE

MANUFACTURER AND MODEL

NUMBERMARK

INDOOR UNIT DATA OUTDOOR UNIT DATA

ELECTRICAL DATA

REMARKS

SPLIT SYSTEM AIR CONDITIONING SCHEDULE

GENERAL EQUIPMENT NOTE:

-AIRFLOWS AND CAPACITIES ARE SCHEDULED FOR OPERATION AT 4100.0 FEET ABOVE SEA LEVEL.

DATE INITIAL

07/17/2025

2. SINGLE DEFLECTION GRILLE, WITH 3/4" BLADE SPACING.

NOTES: 1. FACE SIZE TO BE NECK SIZE + ADDITIONAL LENGTH FROM MOUNTING FRAME.

R-1 SURFACE NOTE 1 SEE PLANS 35 NONE STEEL / WHITE 0.1 25 KRUEGER S80 1,2

MARK

MOUNTING

TYPE FACE SIZE (IN.) NECK SIZE (IN.) BLADE ANGLE VOLUME CONTROL MATERIAL / FINISH MAX PD (IN WG)

MAX NC AT PD

SHOWN BASIS OF DESIGN REMARKS

DIFFUSER, REGISTER AND GRILLE SCHEDULE

7/21/25

EXTG PANEL 'L1B'

EXTG PANEL 'L1A'

D1

D1

D2

OFFICE

OFFICE

DRAFTING

STOR

LIBRARY

OFFICE

READY ROOM

BOILER ROOM

ADMIN. STOR

HALL

WOMEN

MEN

PHONE

BREAK ROOM

OFFICE

OFFICE

OFFICE

EVIDENCE

EVIDENCE

129 OFFICE

OFFICE

OFFICE

128 OFFICE

OFFICE

OFFICE

OFFICE

STORAGE

WOMEN

MEN

ELEV

FOYER

ELEV. EQUIP.

MAINTENANCE

(E)BS-103

(E)BS-104

(E)BC-107

D2

(E)BS-105

(E)BS-106

(E)BS-107

(E)BC-102

D2

BC-101

D1

(E)BS-101

D1

(E)BS-102 (E)BC-106

D2

(E)BC-108

D2

(E)BC-110

D2

(E)BC-112

D2

(E)BC-109

D2

(E)BC-105

D2

(E)BC-111

D2

(E)BC-103

D2

(E)BC-104

D2

D1

1044 North 115th Street | Suite 300

Omaha, NE 68154

(402) 493-4800 www.schemmer.com

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATE

305107

80043

C U s e rs \j b in g e \D o c u m e n ts \R e v it te m p

\0

-E L

E C

R jb in g e .r v t

DJL

DJL

JCB

01/15/2025

009258.005

E002

FIRST FLOOR PLAN -

DEMOLITION

NPS WICA HVAC

009258005- 7- E002 FIRST FLOOR PLAN - DEMOLITION

WIND CAVE NATIONAL PARK

26611 US HIGHWAY 385

HOT SPRINGS, SD

REF. DEMO NOTES ( ):DX

D1 MECHANICAL EQUIPMENT TO BE REMOVED. DEMOLISH ALL ASSOCIATED

CONDUIT, CONDUCTORS, AND CONTROL WIRING.

D2 MECHANICAL EQUIPMENT TO BE REMOVED AND REPLACED IN-PLACE.

MAINTAIN ALL ASSOCIATED CONDUIT AND CONDUCTORS FOR NEW

EQUIPMENT CONNECTION.

SCALE: 1/8" = 1'-0"

FIRST FLOOR PLAN - ELECTRICAL DEMOLITION

DATE INITIAL

07/17/2025

PLAN

NORTH

TRUE

07/18/2025

SWBD 'LGB'

EXTG PANEL 'EM'

EXTG PANEL 'LGA'

SWBD 'MDC'

LGA - 15,17

BS-001

LGA - 10,12

BC-100A

LGA - 10,12

BC-100B

LGB - 4

HRV-1

MECH/ELEC/TELE

WEIGHT ROOM

XFMR 'UTILITY'

(E)AHU-2

WP, G

LGB - 1

SSCU-2

1044 North 115th Street | Suite 300

Omaha, NE 68154

(402) 493-4800 www.schemmer.com

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATE

305107

80043

C U s e rs \j b in g e \D o c u m e n ts \R e v it te m p

\0

-E L

E C

R jb in g e .r v t

DJL

DJL

JCB

01/15/2025

009258.005

E201

SUB-GRADE FLOOR PLAN -

POWER

NPS WICA HVAC

009258005- 7- E201 SUB-GRADE FLOOR PLAN - POWER

WIND CAVE NATIONAL PARK

26611 US HIGHWAY 385

HOT SPRINGS, SD

REF. NOTES ( ):X

2 ASSOCIATED UNIT SUPPLY FAN AND HEATING COIL TO BE REPLACED

IN-KIND. COORDINATE WITH MECH FOR RECONNECTION OF POWER.

RECONNECT DEVICES TO EXISTING CIRCUIT/CONDUCTORS.

SCALE: 1/8" = 1'-0"

SUB-GRADE FLOOR PLAN - POWER & AUXILIARY SYSTEMS

DATE INITIAL

07/17/2025

PLAN

NORTH

TRUE

EXTG PANEL 'L1A'

EXTG PANEL 'L1B'

L1A - 7,9

BC-101

OFFICE

OFFICE

DRAFTING

STOR

LIBRARY

OFFICE

READY ROOM

BOILER ROOM

ADMIN. STOR

HALL

WOMEN

MEN

PHONE

BREAK ROOM

OFFICE

OFFICE

OFFICE

EVIDENCE

EVIDENCE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

STORAGE

WOMEN

MEN

ELEV

FOYER

ELEV. EQUIP.

MAINTENANCE

L1A - 7,9

BC-102

L1A - 7,9

BC-111

L1A - 7,9

BC-105

L1A - 7,9

BC-110

L1A - 7,9

BC-106

L1A - 7,9

BC-107

L1A - 7,9

BC-108

L1A - 7,9

BC-112

L1A - 7,9

BC-109

L1A - 7,9

BC-103

L1A - 7,9

BC-104

SS-2

1044 North 115th Street | Suite 300

Omaha, NE 68154

(402) 493-4800 www.schemmer.com

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATE

305107

80043

C U s e rs \j b in g e \D o c u m e n ts \R e v it te m p

\0

-E L

E C

R jb in g e .r v t

DJL

DJL

JCB

01/15/2025

009258.005

E202

FIRST FLOOR PLAN -

POWER

NPS WICA HVAC

009258005- 7- E202 FIRST FLOOR PLAN - POWER

WIND CAVE NATIONAL PARK

26611 US HIGHWAY 385

HOT SPRINGS, SD

REF. NOTES ( ):X

1 CONNECT MECHANICAL EQUIPMENT TO EXISTING CIRCUIT/CONDUCTORS

AT THIS LOCATION.

SCALE: 1/8" = 1'-0"

FIRST FLOOR PLAN - POWER & AUXILIARY SYSTEMS

DATE INITIAL

07/17/2025

PLAN

NORTH

TRUE

GENERAL EQUIPMENT SCHEDULE NOTES:

A. THIS SCHEDULE DISPLAYS SIZING INFORMATION THAT IS GENERIC IN

NATURE. SCHEDULE DOES NOT ITEMIZE ALL INSTANCES OF

EQUIPMENT. CONTRACTOR SHALL REFER TO THE PLANS FOR FINAL

QUANTITIES AND LOCATIONS.

B. MOUNT ALL DISCONNECTS AND STARTERS ON ASSOCIATED

EQUIPMENT UNLESS SHOWN OTHERWISE. MAINTAIN WORKING

CLEARANCES PER NEC; COORDINATE WITH MECHANICAL

CONTRACTOR.

C. BCU = BOX COVER UNIT (COOPER #SSY / #STY OR EQUAL) WITH FUSE.

D. NFD OR FD = NON-FUSED OR FUSED DISCONNECT SWITCH.

E. CS/NFD, FD = COMBINATION STARTER/ NON OR FUSED DISCONNECT

SWITCH.

F. INT = INTEGRAL DISCONNECT FURNISHED WITH EQUIPMENT.

G. FHPMC = FRACTIONAL HORSEPOWER MANUAL CONTROLLER.

H. IHPMC = INTEGRAL HORSEPOWER MANUAL CONTROLLER.

I. STE = THERMAL ELEMENT SWITCH. PROVIDE THERMAL UNIT.

J. EXP = DEVICE TO BE EXPLOSION-PROOF.

K. ALL SWITCHES, DISCONNECTS, ETC SHALL BE LOCKABLE.

L. ALL SWITCHES, DISCONNECTS, ETC SHALL BE NEMA 3R WHERE

REQUIRED.

M. PROVIDE FUSES AS SHOWN; REVISE SIZES PER ACTUAL NAMEPLATE

DATA.

N. STARTER ACCESSORIES:STARTER ACCESSORIES:

1. CONTROL TRANSFORMER

2. H-O-A SWITCH

3. RED RUN LIGHT

4. 2 NO CONTACTS; 2 NC CONTACTS

O. PROVIDE DUCT DETECTOR, SHUTDOWN RELAY, AND ACCESSORIES

AS REQUIRED TO SHUTDOWN HVAC EQUIPMENT 2000 CFM OR HIGHER

PER NFPA AND AHJ.

EQUIPMENT SCHEDULE NOTES:

1. PROVIDES POWER TO INTERIOR UNIT 'SS-1'.

2. UNIT CONTROLLED VIA EXISTING JOHNSON CONTROL SYSTEM. SEE

MECH FOR ADDITIONAL INFORMATION.

3. UNIT CONTROLLED VIA THERMOSTAT. SEE MECH FOR ADDITIONAL

INFORMATION.

4. UNIT CONTROLLED VIA SCR CONTROL. SEE MECH FOR ADDITIONAL

INFORMATION.

1044 North 115th Street | Suite 300

Omaha, NE 68154

(402) 493-4800 www.schemmer.com

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATE

305107

80043

C U s e rs \j b in g e \D o c u m e n ts \R e v it te m p

\0

-E L

E C

R jb in g e .r v t

DJL

DJL

JCB

01/15/2025

009258.005

E601

EQUIPMENT SCHEDULE

NPS WICA HVAC

009258005- 7- E601 EQUIPMENT SCHEDULE

WIND CAVE NATIONAL PARK

26611 US HIGHWAY 385

HOT SPRINGS, SD

EQUIPMENT SCHEDULE

DEVICE DEVICE DESCRIPTION VOLTAGE PH KW FLA HP

STARTER / DISCONNECT

PLUG CONFIG

RECEPT

CONFIG FEEDER SIZE NOTES TYPE SIZE FUSE

BC-100A BLOWER COIL 208 V 1 - 0.3 - INT - - - - 2#12, 1#12G - 3/4"C 2,3

BC-100B BLOWER COIL 208 V 1 - 0.3 - INT - - - - 2#12, 1#12G - 3/4"C 2,3

BC-101 BLOWER COIL 208 V 1 - 0.4 - INT - - - - 2#12, 1#12G - 3/4"C 2,3

BC-102 BLOWER COIL 208 V 1 - 0.3 - INT - - - - 2#12, 1#12G - 3/4"C 2,3

BC-103 BLOWER COIL 208 V 1 - 0.5 - INT - - - - 2#12, 1#12G - 3/4"C 2,3

BC-104 BLOWER COIL 208 V 1 - 0.2 - INT - - - - 2#12, 1#12G - 3/4"C 2,3

BC-105 BLOWER COIL 208 V 1 - 0.2 - INT - - - - 2#12, 1#12G - 3/4"C 2,3

BC-106 BLOWER COIL 208 V 1 - 0.2 - INT - - - - 2#12, 1#12G - 3/4"C 2,3

BC-107 BLOWER COIL 208 V 1 - 0.2 - INT - - - - 2#12, 1#12G - 3/4"C 2,3

BC-108 BLOWER COIL 208 V 1 - 0.3 - INT - - - - 2#12, 1#12G - 3/4"C 2,3

BC-109 BLOWER COIL 208 V 1 - 0.2 - INT - - - - 2#12, 1#12G - 3/4"C 2,3

BC-110 BLOWER COIL 208 V 1 - 0.4 - INT - - - - 2#12, 1#12G - 3/4"C 2,3

BC-111 BLOWER COIL 208 V 1 - 0.2 - INT - - - - 2#12, 1#12G - 3/4"C 2,3

BC-112 BLOWER COIL 208 V 1 - 0.4 - INT - - - - 2#12, 1#12G - 3/4"C 2,3

BC-201 BLOWER COIL 208 V 1 - 0.2 - INT - - - - 2#12, 1#12G - 3/4"C 2,3

BC-202 BLOWER COIL 208 V 1 - 0.4 - INT - - - - 2#12, 1#12G - 3/4"C 2,3

BC-203 BLOWER COIL 208 V 1 - 0.4 - INT - - - - 2#12, 1#12G - 3/4"C 2,3

BS-001 BRANCH SELECTOR BOX 208 V 1 1.17 - - NFD 30A/2P - - - 2#12, 1#12G - 3/4"C 2

EDH-1 ELECTRIC DUCT HEATER 208 V 3 1.5 - - INT - - - - 3#12, 1#12G - 3/4"C 4

HRV-1 HEAT RECOVERY UNIT 208 V 3 - 48.2 - FD 100A/3P 70A - - 3#4, 1#8G - 1-1/4"C 2

SSCU-1 SPLIT SYSTEM - OUTDOOR 208 V 1 - 7.5 - NFD 30A/2P - - - 2#12, 1#12G - 3/4"C 1

SSCU-2 SPLIT SYSTEM - OUTDOOR 208 V 1 - 18 - NFD 30A/2P - - - 2#10, 1#10G - 3/4"C 1

DATE INITIAL

07/17/2025

(402) 493-4800 www.schemmer.com

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATE

305107

80043

C U s e rs \j b in g e \D o c u m e n ts \R e v it te m p

\0

-E L

E C

R jb in g e .r v t

DJL

DJL

JCB

01/15/2025

009258.005

E701

ELECTRICAL PANEL

SCHEDULES

NPS WICA HVAC

009258005- 7- E701 ELECTRICAL PANEL SCHEDULES

WIND CAVE NATIONAL PARK

26611 US HIGHWAY 385

HOT SPRINGS, SD

MCB: Main Circuit Breaker

LOCK: Lockable Circuit Breaker EXTG: Existing Circuit Breaker

GFI: GFCI Circuit Breaker MLO: Main Lug Only

FCB: Feeder Circuit Breaker MCCB: Molded Case Circuit Breaker

Legend: Notes:

Total Est. Demand Current (80% Rated): 87 A

Continuous Current @ 125%: 87 A

Non-Cont. Current @ 100%: 0 A

EQP_CONT 25049 VA 100.00% 25049 VA Total Est. Demand Current (100% Rated): 70 A

REC 180 VA 100.00% 180 VA Total Est. Demand: 25229 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

70 A

25229 VA

5 SPARE 3 125 A 0 VA

4 HRV-1 - EXTERIOR 3 110 A 17365 VA

3 (EXTG) PANEL 'L2B' 3 250 A 3864 VA

2 (EXTG) SPACE 3 -- --

1 EQP_CONT SSCU-2 2 30 A 4000 VA

CKT Circuit Description # of Poles Trip Rating Load Remarks

Mounting: SURFACE Wires: 4 FCB / MCB Rating: 400 A

Supply From: MDC Phases: 3 MLO / MCB: MLO

Location: MECH/ELEC/TELE 001 Volts: 208Y/120 A.I.C. Rating: 42K

Extg Switchboard: LGB

MCB: Main Circuit Breaker

LOCK: Lockable Circuit Breaker EXTG: Existing Circuit Breaker

GFI: GFCI Circuit Breaker MLO: Main Lug Only

FCB: Feeder Circuit Breaker MCCB: Molded Case Circuit Breaker

Legend: Notes:

Total Est. Demand Current (80% Rated): 4 A

Continuous Current @ 125%: 4 A

Non-Cont. Current @ 100%: 0 A

Total Est. Demand Current (100% Rated): 4 A

EQP_CONT 1295 VA 100.00% 1295 VA Total Est. Demand: 1295 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Amps: 0 A 6 A 6 A

Total Load: 0 VA 647 VA 647 VA

29 (EXTG) MAINT OFFICE 20 A 1 0 0 1 20 A (EXTG) SECURITY 30

27 (EXTG) MAINT OFFICE 20 A 1 0 0 1 20 A (EXTG) OUTSIDE PHONE BOX 28

25 (EXTG) MAINT OFFICE 20 A 1 0 0 1 20 A (EXTG) AHU-2 PREHEAT 26

23 -- -- -- 0 0 1 20 A (EXTG) STORE ROOM LIGHTS 24

21 -- -- -- 0 0 1 20 A (EXTG) SPARE 22

19 (EXTG) AHU-2 15 A 3 0 0 1 20 A (EXTG) JOHNSON CONTROL 20

17 -- -- -- 585 0 -- -- -- 18

15 BS-001 - MECH/ELEC/TELE 001 20 A 2 585 0 -- -- -- 16

13 (EXTG) RECEPTS SOUTH RM WEIGHT... 20 A 1 0 0 3 20 A (EXTG) CHILLER PUMP 14

11 (EXTG) ADDITIONAL RECEPTS RMS OFFICE 20 A 1 0 62 -- -- -- 12

9 (EXTG) FIRE ALARM COMPRESSOR CIRCUIT 20 A 1 0 62 2 15 A BC-100A/B - WEIGHT ROOM 003 10

7 (EXTG) GFI AIR HANDLER CONTROL 20 A 1 0 0 1 20 A (EXTG) MAINT OFFICE RADIO & DESK PLUGS... 8

5 (EXTG) SINK WALL MAINT. OFFICE 20 A 1 0 0 1 20 A (EXTG) JOHNSON CONTROL 6

3 (EXTG) LIGHTS & UNIT HEATER-1 002-003 20 A 1 0 0 1 20 A (EXTG) REC 4

1 (EXTG) REC LIGHTS 001 20 A 1 0 0 1 20 A (EXTG) UNIT HEATER B 2

CKT Circuit Description Trip P A B C P Trip Circuit Description CKT

Mounting: SURFACE Wires: 4 FCB / MCB Rating: 100 A

Supply From: MDC Phases: 3 MLO / MCB: MLO

Location: MECH/ELEC/TELE 001 Volts: 208Y/120 A.I.C. Rating:

Extg Branch Panel: LGA

DATE INITIAL

07/17/2025

(402) 493-4800 www.schemmer.com

REVISED TITLE OF SHEET DRAWING NO.

SHEET

PMIS / PKG. NO.

OF

SUB SHEET NO.

ARCH/ENG PROJ #

DESIGNED

DRAWN

CHECKED

PREPARED

DATE

305107

80043

C U s e rs \j b in g e \D o c u m e n ts \R e v it te m p

\0

-E L

E C

R jb in g e .r v t

DJL

DJL

JCB

01/15/2025

009258.005

E702

ELECTRICAL PANEL

SCHEDULES

NPS WICA HVAC

009258005- 7- E702 ELECTRICAL PANEL SCHEDULES

WIND CAVE NATIONAL PARK

26611 US HIGHWAY 385

HOT SPRINGS, SD

MCB: Main Circuit Breaker

LOCK: Lockable Circuit Breaker EXTG: Existing Circuit Breaker

GFI: GFCI Circuit Breaker MLO: Main Lug Only

FCB: Feeder Circuit Breaker MCCB: Molded Case Circuit Breaker

Legend: Notes:

Total Est. Demand Current (80% Rated): 3 A

Continuous Current @ 125%: 3 A

Non-Cont. Current @ 100%: 0 A

Total Est. Demand Current (100% Rated): 2 A

EQP_CONT 728 VA 100.00% 728 VA Total Est. Demand: 728 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Amps: 4 A 4 A 0 A

Total Load: 364 VA 364 VA 0 VA

71 -- -- -- 0 0 -- -- -- 72

69 -- -- -- 0 0 -- -- -- 70

67 (EXTG) BOILER PUMPS 20 A 3 0 0 3 60 A (EXTG) HOT WATER HEATER 68

65 (EXTG) PANEL OUTLET 20 A 1 0 0 1 20 A (EXTG) WOMENS OUTLET 66

63 -- -- -- 0 0 -- -- -- 64

61 (EXTG) WOMENS HAND DRYER 20 A 2 0 0 2 20 A (EXTG) WOMENS HAND DRYER 62

59 (EXTG) REC 130, EFB WATER COOLER CHB 20 A 1 0 0 1 20 A (EXTG) REC 115, 116 60

57 (EXTG) ELEVATOR LIGHTS 20 A 1 0 0 1 20 A (EXTG) REC 112, 115, 114 58

55 (EXTG) OUTSIDE LIGHTS & COMPUTER REC... 20 A 1 0 0 1 20 A (EXTG) REC 115, 116, 117, 118 56

53 (EXTG) TIME CLOCK 20 A 1 0 0 1 20 A (EXTG) REC RECIRC. PUMP 54

51 (EXTG) LIGHTS FOYER 103, 124 20 A 1 0 0 1 20 A (EXTG) LIGHTS 123, 135 52

49 (EXTG) LIGHTS 115-118 20 A 1 0 0 1 20 A (EXTG) LIGHTS 119-122 50

47 (EXTG) LIGHTS 112, 114 20 A 1 0 0 1 20 A (EXTG) SPARE 48

45 (EXTG) LIGHTS 108-106 20 A 1 0 0 1 20 A (EXTG) LIGHTS 126 46

43 (EXTG) LIGHTS 107-110 20 A 1 0 0 1 20 A (EXTG) LIGHTS 125, 134 44

41 SPACE -- 1 -- -- 1 -- SPACE 42

39 SPACE -- 1 -- -- 1 -- SPACE 40

37 SPACE -- 1 -- -- 1 -- SPACE 38

35 (EXTG) TRACK LIGHT N WALL 20 A 1 0 0 -- -- -- 36

33 -- -- -- 0 0 2 15 A (EXTG) WOMENS UPSTAIRS HAND DRYER LEFT 34

31 (EXTG) MENS UPSTAIRS HAND DRYER RIGHT 15 A 2 0 0 -- -- -- 32

29 -- -- -- 0 0 2 15 A (EXTG) MENS UPSTAIRS HAND DRYER LEFT 30

27 (EXTG) MENS DOWNSTAIRS HAND DRYER 20 A 2 0 0 1 20 A (EXTG) SPARE 28

25 (EXTG) REC 101 20 A 1 0 0 1 20 A (EXTG) JANITOR STORAGE ROOM 26

23 (EXTG) REC 101 20 A 1 0 0 1 20 A (EXTG) SPARE 24

21 (EXTG) REC 101 20 A 1 0 0 1 20 A (EXTG) TRACK LIGHT 101 22

19 (EXTG) REC 101 20 A 1 0 0 1 20 A (EXTG) TRACK LIGHT 101 20

17 -- -- -- 0 0 1 20 A (EXTG) TRACK LIGHT 101 18

15 (EXTG) TRACK LIGHTS 101 15 A 2 0 0 1 20 A (EXTG) TRACK LIGHT 101 16

13 (EXTG) TRACK LIGHTS 101 20 A 1 0 0 1 20 A (EXTG) TRACK LIGHT 101 14

11 (EXTG) HAND DRYER RIGHT 20 A 1 0 0 1 20 A (EXTG) TRACK LIGHT 101 12

9 -- -- -- 364 0 -- -- -- 10

7 BC-101 - BC-112 15 A 2 364 0 2 15 A SPARE 8

5 SPACE -- 1 -- -- 1 -- SPACE 6

3 SPACE -- 1 -- -- 1 -- SPACE 4

1 SPACE -- 1 -- -- 1 -- SPACE 2

CKT Circuit Description Trip P A B C P Trip Circuit Description CKT

Mounting: SURFACE Wires: 4 FCB / MCB Rating: 200 A

Supply From: MDC Phases: 3 MLO / MCB: MLO

Location: MAINTENANCE 119 Volts: 208Y/120 A.I.C. Rating:

Extg Branch Panel: L1A

MCB: Main Circuit Breaker

LOCK: Lockable Circuit Breaker EXTG: Existing Circuit Breaker

GFI: GFCI Circuit Breaker MLO: Main Lug Only

FCB: Feeder Circuit Breaker MCCB: Molded Case Circuit Breaker

Legend: Notes:

Total Est. Demand Current (80% Rated): 13 A

Continuous Current @ 125%: 13 A

Non-Cont. Current @ 100%: 0 A

EQP_CONT 3684 VA 100.00% 3684 VA Total Est. Demand Current (100% Rated): 11 A

REC 180 VA 100.00% 180 VA Total Est. Demand: 3864 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Amps: 7 A 14 A 13 A

Total Load: 784 VA 1592 VA 1488 VA

83 -- -- -- 0 -- 1 -- SPACE 84

81 -- -- -- 0 -- 1 -- SPACE 82

79 (EXTG) PANEL L1C 90 A 3 0 -- 1 -- SPACE 80

77 SPACE -- 1 -- -- 1 -- SPACE 78

75 (EXTG) EXHAUST FAN 220 15 A 1 0 -- 1 -- SPACE 76

73 (EXTG) SPARE 20 A 1 0 0 1 20 A (EXTG) SPARE 74

71 -- -- -- 0 0 1 20 A (EXTG) SPARE 72

69 -- -- -- 0 0 1 20 A (EXTG) SPARE 70

67 (EXTG) SPARE 50 A 3 0 0 1 20 A (EXTG) SPARE 68

65 (EXTG) EXIT LIGHT VENDING 20 A 1 0 0 1 20 A (EXTG) SPARE 66

63 (EXTG) RECEPTACLE VENDING 20 A 1 0 0 1 20 A (EXTG) SPARE 64

61 (EXTG) RECEPTACLE VENDING 20 A 1 0 0 1 30 A (EXTG) SPARE 62

59 -- -- -- 0 0 -- -- -- 60

57 (EXTG) SPARE 20 A 2 0 0 2 40 A (EXTG) SPARE 58

55 (EXTG) SPARE 20 A 1 0 0 -- -- -- 56

53 (EXTG) 222 N WALL RECEPTACLE MUSEUM... 20 A 1 0 0 2 20 A (EXTG) SPARE 54

51 (EXTG) HALL 220 RECEPTACLE MUSEUM... 20 A 1 0 0 1 20 A (EXTG) SPARE 52

49 (EXTG) RECEPTACLE BOOKSTORE 20 A 1 0 0 1 30 A (EXTG) SPARE 50

47 (EXTG) RECEPTACLE VENDING 20 A 1 0 0 1 30 A (EXTG) SPARE 48

45 (EXTG) SPARE 20 A 1 0 0 -- -- -- 46

43 (EXTG) RECEPTACLE VENDING 20 A 1 0 0 2 20 A (EXTG) SPARE 44

41 SPACE -- 1 -- -- 1 -- SPACE 42

39 SPACE -- 1 -- -- 1 -- SPACE 40

37 SPACE -- 1 -- -- 1 -- SPACE 38

35 SPACE -- 1 -- 0 -- -- -- 36

33 SPACE -- 1 -- 0 2 20 A (EXTG) SPARE 34

31 (EXTG) SPARE 20 A 1 0 0 1 20 A (EXTG) SPARE 32

29 (EXTG) UNDER COUNTER FRIDGE 20 A 1 0 0 1 20 A (EXTG) SPARE 30

27 -- -- -- 0 0 1 20 A (EXTG) SPARE 28

25 (EXTG) SPARE 30 A 2 0 500 -- -- -- 26

23 SPACE -- 1 -- 500 -- -- -- 24

21 -- -- -- 104 500 3 15 A EDH-1 - MUSEUM COLL. STORAGE 219 22

19 BC-201 - BC-203 15 A 2 104 180 1 20 A REC - ON ROOF 20

17 -- -- -- 0 988 -- -- -- 18

15 -- -- -- 0 988 2 20 A SSCU-1 - ON ROOF 16

13 (EXTG) HUMIDIFIER 20 A 3 0 0 1 20 A (EXTG) CABINET HEATER / AC 14

11 (EXTG) RECEPT E WALL VENDING RM 20 A 1 0 0 1 20 A (EXTG) 220 HALLWAY PLUG REC 214-215 12

9 (EXTG) EXHIBIT LIGHTS 20 A 1 0 0 1 20 A (EXTG) ATTIC RECEPT & EMERGENCY EXIT... 10

7 (EXTG) LIGHTS EXHIBIT 20 A 1 0 0 1 20 A (EXTG) PLUGS EXHIBIT 222, 214-215 8

5 (EXTG) LIGHTS MUSEUM STORAGE 20 A 1 0 0 1 20 A (EXTG) BREAK ROOM LIGHTS KITCHEN K... 6

3 (EXTG) LIGHTS EXHIBIT HALLWAY 20 A 1 0 0 1 20 A (EXTG) LIGHTS 214-215 4

1 (EXTG) LIGHTS 220 HALL 20 A 1 0 0 1 20 A (EXTG) LIGHTS 214-215 2

CKT Circuit Description Trip P A B C P Trip Circuit Description CKT

Mounting: RECESSED Wires: 4 FCB / MCB Rating: 200 A

Supply From: LGB Phases: 3 MLO / MCB: MLO

Location: VENDING & SEATING 218 Volts: 208Y/120 A.I.C. Rating:

Extg Branch Panel: L2B

DATE INITIAL

07/17/2025

File details come from the government source that posted it. Updated .