A04_SOW_REVISED_19_August_2026_0001.pdf
PDF 9 MB Posted
- Attached to
- JEFF - Terrazzo Refinishing
- Solicitation number
- 140P6226Q0003
About this file
This is a Statement of Work (SOW) for the refinishing of terrazzo flooring at Gateway Arch National Park's museum and visitor center.
The project encompasses cleaning and refinishing approximately 54,000 square feet of terrazzo flooring installed in 2018. The specific work tasks include: repairing minor cracks and raised seams throughout the surfaces, machine cleaning with a green 3M pad and EZ Clean Floor Cleaner & Degreaser by Dur-A-Flex, flushing with Neutra Rinse and final mopping, and applying four coats of Plaza Plus by Diversey followed by high-speed buffing with a 3M hogs hair pad. The work must be completed in one continuous operation/phase during evening hours (5:00 pm to 1:00 am), Monday through Friday, between February 1, 2027, and March 1, 2027. Weekend and holiday work may be acceptable with 48 hours advance notice and approval by the Contracting Officer, Contracting Officer's Representative, or Park Staff. The National Park Service will remove all benches, tables, and obstacles from the work areas each night. Power and water will be provided by the government, and public restrooms are available nearby. No government-furnished equipment or materials will be provided; the contractor is responsible for all supplies and equipment. The document includes 22 exhibits showing photographic examples of damaged floor areas requiring repair, including raised seams between terrazzo sections and minor cracking, along with a composite key plan identifying damage locations throughout the museum and visitor center.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P6226Q0003_Amd_0002.pdf | ||
| B08_-_Revised_Combined_PDF_0002.pdf | ||
| Sol_140P6226Q0003_Amd_0001.pdf | ||
| B08_Site_Visit_Q_A_0001.pdf | ||
| B03_Wage_Determination.pdf | ||
| B08_-_Combined_PDF.pdf | ||
| A04_SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gateway Arch National Park
Statement of Work
Refinishing of Terrazzo Floor
140P6226Q0003
Table of Contents
1.0 Project Description / Summary
2.0 Objectives
3.0 Background
4.0 Specific Work / Tasks
5.0 Optional Work / Tasks
6.0 Government Furnished Equipment / Materials / Other
7.0 Special Conditions / Requirements
8.0 Place of Performance
9.0 Performance Period / Schedule Requirements
Statement of Work
Project Title: Refinish Visitors Center Terrazzo Floor
Park Unit: Gateway Arch National Park (JEFF)
Prepared By: Dovie Cagle
Date: 31 July 2026, revised 19 August 2026
1.0 PROJECT DESCRIPTION / SUMMARY:
This project will clean and refinish the Terrazzo Flooring in the museum and visitor center of the Gateway Arch National Park (Approx 54,000 sqft of area). The Terrazzo flooring was installed in the 2016 redesign of the museum and visitor center.
2.0 OBJECTIVES:
This project is intended to repair damaged areas and refinish the terrazzo floors in Gateway Arch National
Park Museum in keeping with the historic nature of the building. The refinished floor will enhance durability, safety and maintain aesthetic consistency.
3.0 BACKGROUND:
The Gateway Arch Terrazzo floor was installed in 2018. Since then, we have not had the floors refinished. There is approximately 54,000 Square feet throughout the museum that needs to be refinished.
Small cracks and raised seams between sections require minor repairs.
4.0 SPECIFIC WORK / TASKS:
• Repair minor cracks and raised seams throughout the surfaces to be resurfaced (see pictures).
• Machine clean terrazzo floors with a green 3M pad and EZ Clean Floor Cleaner & Degreaser by
Dur-A-Flex.
• Flush with Neutra Rinse and final mop.
• Apply four (4) coats of Plaza Plus by Diversey and then high speed buff terrazzo floors with 3M hogs hair pad.
5.0 OPTIONAL WORK / TASKS:
• N/A
6.0 GOVERNMENT FURNISHED EQUIPMENT / MATERIALS / OTHER:
a. Equipment-None
b. Materials- None
c. Power and Water can be provided. Public restrooms are in the vicinity.
7.0 SPECIAL CONDITIONS / REQUIREMENTS:
1. NPS will remove all benches, tables and or objects in way of area being worked each night.
2. All work to be performed evening working hours, after 5:00pm, Monday through Friday, in one continuous operation/phase.
8.0 PLACE OF PERFORMANCE:
• Gateway Arch National Park
9.0 PERFORMANCE PERIOD / SCHEDULE REQUIREMENTS:
• All on-site work must be completed between 1 Febuary 2027 and 1 March 2027.
• General work hours shall be 5:00 pm to 1 am.
• Weekend and holiday work may be acceptable with 48 hours notice and approval by the CO, COR, or Park Staff.
10.0 PHOTOS OF DAMAGED AREAS REQUIRING REPAIR:
• Photos are provided as examples of the scope of repairs required and are not to be considered an exhaustive list.
• Exhibit 1
• Exhibit 2
• Exhibit 3
• Exhibit 4
• Exhibit 5
• Exhibit 6
• Exhibit 7
• Exhibit 8
• Exhibit 9
• Exhibit 10
• Exhibit 11
• Exhibit 12
• Exhibit 13
• Exhibit 14
• Exhibit 15
• Exhibit 16
• Exhibit 17
• Exhibit 18
• Exhibit 19
• Exhibit 20
• Exhibit 21
• Exhibit 22
10111213
Exhibit numbers in red
AutoCAD SHX Text S
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text X
AutoCAD SHX Text W
AutoCAD SHX Text V
AutoCAD SHX Text U
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text Q
AutoCAD SHX Text P
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text M
AutoCAD SHX Text L
AutoCAD SHX Text K
AutoCAD SHX Text J
AutoCAD SHX Text N
AutoCAD SHX Text M
AutoCAD SHX Text L
AutoCAD SHX Text K
AutoCAD SHX Text J
AutoCAD SHX Text X
AutoCAD SHX Text W
AutoCAD SHX Text V
AutoCAD SHX Text U
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text Q
AutoCAD SHX Text P
AutoCAD SHX Text O
AutoCAD SHX Text
FOOD
AutoCAD SHX Text
AutoCAD SHX Text
SERVICE
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text E1
AutoCAD SHX Text C1
AutoCAD SHX Text H1
AutoCAD SHX Text D1
AutoCAD SHX Text
CHEM
AutoCAD SHX Text
RA
AutoCAD SHX Text E2
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text 199869
AutoCAD SHX Text
VOL. 2 OF 3
AutoCAD SHX Text
MUSEUM
AutoCAD SHX Text
EXPANSION
AutoCAD SHX Text
CENTER & ASSOCIATED GROUNDS
AutoCAD SHX Text
CITYARCHRIVER 2015 MUSEUM/VISITOR
AutoCAD SHX Text 1/31/19
AutoCAD SHX Text 120017B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
COMPOSITE KEY PLAN
AutoCAD SHX Text
COMPOSITE KEY PLAN
AutoCAD SHX Text
AutoCAD SHX Text A-117
AutoCAD SHX Text A-117
AutoCAD SHX Text
AREA 1.1
AutoCAD SHX Text
AREA 1.2
AutoCAD SHX Text
AREA 1.3
AutoCAD SHX Text
AREA 1.4
AutoCAD SHX Text
AREA 3.1
AutoCAD SHX Text
AREA 4.1
AutoCAD SHX Text
AREA 2.1
AutoCAD SHX Text
AREA 3.2
AutoCAD SHX Text
AREA 4.2
AutoCAD SHX Text
AREA 3.4
AutoCAD SHX Text
AREA 3.3
AutoCAD SHX Text
AREA 4.3
AutoCAD SHX Text
AREA 4.4
AutoCAD SHX Text
SCALE OF FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1" = 40'
AutoCAD SHX Text
AREA 2.2
AutoCAD SHX Text
Matthew Frank Highlight
Matthew Frank Highlight
File details come from the government source that posted it. Updated .