B11_LIBO_Gale_House_Sewer_Project_Site_Visit_Signin___Questions_18_Aug_25__0002.pdf

PDF 576 KB Posted

Attached to
Lincoln Boyhood NM - Septic System Replacement
Solicitation number
140P6225B0003
Issued by

About this file

This document is a Site Visit Sign-In Sheet for the Gale House Septic Replacement project at Lincoln Boyhood National Monument, issued by the United States Department of the Interior National Park Service. The site visit occurred on August 18, 2025, at 1:00 PM, with representatives from multiple companies present, including NPS, Premium Mechanical, Joe Crober Jr. Const., and other local contractors.

The document includes a detailed questions section covering project specifics such as septic tank replacement, boring requirements, archaeological compliance, project timeline, and contractor responsibilities. Key details include: the project must be completed outside of Bat Season (after October 1st and before April 14th), all spoilage will be removed by the contractor, utility locates are the contractor's responsibility, and a Shade Fescue seed mix is required for reseeding disturbed lawns. Storage and laydown areas will be determined during a pre-construction meeting, and no archaeological work is currently needed as compliance has been completed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .