This document appears to be a set of Questions and Answers related to Solicitation 140P6224Q0010 for the WICR VC ROOF REPLACEMENT project. The solicitation is issued by the Department of the Interior National Park Service Midwest Region.
The key details from the Q&A document are:
- The thickness of the existing roof system is unknown, but pictures are provided showing the current materials.
- The correct Period of Performance for the project is 90 days, not 175 days as was mistakenly included in the solicitation.
- The solicitation requires sealing all exterior exposed concrete walls of the Library and Visitor Center, approximately 9,483 square feet, with a water-based penetrating sealer.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08_Solicitation_(Attach_7_Site_Visit_Sign_in_Roster)_0001.pdf | ||
| Sol_140P6224Q0010_Amd_0001.pdf | ||
| B08_Solicitation_(Attach_5_Price_Schedule).xlsx | XLSX spreadsheet | |
| B08_Solicitation_(Attach_2_Wage_Det_(MO20240075_Rev_1)).pdf | ||
| B08_Solicitation_(Attach_6_Limitations_on_Subcontracting_Report).xlsx | XLSX spreadsheet | |
| Sol_140P6224Q0010.pdf | ||
| B08_Solicitation_(Attach_4_PPQ).doc | DOC document | |
| B08_Solicitation_(Attach_1_Specifications).pdf | ||
| B08_Solicitation_(Attach_3_Technical_Questionnaire).docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WICR Q&A
140P6224Q0010
1. What is the thickness of existing roof system?
a. The thickness is unknown, but four (4) pictures of the current roof being installed are attached to this document which show the materials, etc.
2. What are the materials used for roof build up so we can infill with like materials?
a. See question #1.
3. There was two places that showed 2 different POP dates. One was 90 days and the other 175 days. Which is correct?
a. 90 days is the correct Period of Performance. 175 days was mistakenly used when creating the solicitation and has been amended.
4. Please clarify language on Page 3 of the specifications which states “After all cracks have been sealed in the exterior walls of will be sealed with a concrete sealer”
a. Please see similar description located on Page 4 which states “Finally, seal all exterior exposed concrete walls of the Library and Visitor Center. which are approximately 9483 square feet of both building’s exterior walls will be sealed with a water based penetrating sealer with low VOC and low sheen to not change the appearance of the walls.”