Sol_140P6219Q0020.pdf

PDF 328 KB Posted

Attached to
Repointing of visitors center limestone walls at L Federal contract opportunity
Solicitation number
140P6219Q0020
Issued by
Department of the Interior National Park Service

About this file

140P6219Q0020

View the file

Other files for this federal contract opportunity

Other files attached to Repointing of visitors center limestone walls at L, newest first.
File Type Posted
B08_Solicitation_Attachment_1_Statement_of_Work.pdf PDF
B08_Solicitation_Attachment_5_Instructions_for_Submission_of_Quotation.pdf PDF
B08_Solicitation_Attachment_3_Tech_&_Fin_Capability.pdf PDF
B08_Solicitation_Attachment_4_Past_Performance.pdf PDF
B08_Solicitation_Attachment_2_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

NPS, MWR - Missouri MABO

11 North 4th Street

St Louis MO 63102

PMM

Matthew Frank (314) 655-1661

106/28/2019

140P6219Q0020

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

VISITOR CENTER LIMESTONE REPOINTING, LINCOLN BOYHOOD NATIONAL MEMORIAL, LINCOLN

CITY, IN.

The National Park Service (NPS), Midwest Region, Missouri Major Acquisition Buying

Office, is issuing this Request for Quotation (RFQ) 140P6219Q0020 to solicit quotations for repointing of the Lincoln Boyhood National Memorial visitor center¿s limestone walls located at 3027 E. South Street, Lincoln City, Indiana.

1. Work will consist of removing loose and damaged exterior mortar joints and repointing the limestone and sandstone block mortar joints with new mortar on approximately 1,600 square feet of the interior and exterior of the historic building. Where applicable, the block faces will be cleaned to remove discoloration.

Discoloration affects approximately 100 square feet of the wall¿s surface.

2. The Contractor is to limit on-site work hours between the hours of 6:30 a.m. to

5:00 p.m. central standard time, Monday through Friday; unless otherwise agreed to in advance by the Government. No work will be allowed on weekends and

Continued ...

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 90 calendar days and complete it within ________________ ________________ calendar days after receiving

07/19/2019

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

NPS, MWR - Missouri MABO 11 North 4th Street

St Louis MO 63102

PMM

Kathryn Logsdon

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 32

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140P6219Q0020 federally-recognized holidays without prior approval from the Contracting Officer¿s

Representative (COR).

3. The building will be occupied and inhabited by Park staff, visitors, and guests throughout contract performance; therefore, Contractor is expected to coordinate with the Park's

Representative and conduct the work so as to minimize disruption to Park operations to the extent practical.

4. All work required by the project documents, which will be posted with the solicitation, will be accomplished by the Contractor even though minor items/services required may not be specifically mentioned.

TYPE OF CONTRACT: This will be a single firm-fixed price construction contract and expected to be awarded in late-July, early-August

2019 timeframe. Award will be made to only one successful quoter. Davis Bacon Prevailing Wages will apply.

PERIOD OF PERFORMANCE: The period of performance will be ninety (90) calendar days from the date the Notice to Proceed is issued by the

Contracting Officer and received by the

Contractor. The period of performance also includes final government inspection, completion of punch list items, and final cleanup by

Contractor of the contract site.

MAGNITUDE OF PROJECT: Between $25,000 and

$100,000.

NAICS CODE: The North American Industry

Classification System (NAICS) Code assigned to this solicitation / procurement is 238140, Masonry Contractors.

SMALL BUSINESS SIZE STANDARD: $15.0 million.

SET ASIDE: This opportunity is set aside for

Small Business concerns.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

4 32

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140P6219Q0020

ALTERNATE PAYMENT PROTECTION: Within ten (10) calendar days from the date of contract award, the Contractor will be required to provide to the

Contracting Officer, alternate payment protection in the form of a payment bond or an irrevocable letter of credit. The protection amount shall be for 100% of the contract price.

SITE VISIT: A scheduled site visit was conducted on 21 June 2019. Quoters are encouraged to inspect the site, make verification of field dimensions, and to satisfy themselves regarding the conditions that may affect the cost of the products and performance. In no event shall failure to inspect and verify the site constitute grounds for a claim after contract award. Quoters wanting to take advantage of a site visit should coordinate with the contract specialist via email at matthew_frank@nps.gov to schedule a time to visit the site.

PUBLICIZING: The official solicitation package

(RFQ) can be found on the Federal Business

Opportunities (FBO) website at https://www.fbo.gov, and on the FedConnect website at https://www.fedconnect.net. The keyword / solicitation / reference number for the solicitation is 140P6219Q0020. The Contracting

Officer will not provide hardcopies or email copies of the solicitation. It is the responsibility of the quoters to monitor the FBO and FedConnect websites to download the solicitation, specifications, attachments, exhibits and all amendments issued against the solicitation. All solicitation documents, along with the method and instructions for submission of quotations shall be included in the forthcoming solicitation.

RESPONSE TIME AND AWARD: Response time for submission of all quotations will be Friday, July

19, 2019 at 3:00 p.m. central time.

QUESTIONS: Questions are due to the Contracting

Officer via email at kathryn_logsdon@nps.gov no later than Tuesday, July 11 at 3:00 p.m. central time.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

5 32

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140P6219Q0020 vis

EVALUATION CRITERIA FOR AWARD: Lowest price, technically acceptable.

REGISTRATION: All quoters are to have a Unique

Entity Identifier (UEI) number (aka DUNS number), be registered and active in the System for Award

Management (SAM) at https://www.sam.gov, have completed their Representations and

Certifications (Reps & Certs) and be represented as a small business under the NAICS Code of

238140, Masonry Contractors, in order to be awarded a contract; therefore, if you are not already registered and active in SAM, or have not completed your Representations and Certifications at https://www.sam.gov, it is strongly advised that you do so at this time. Failure on the part of the successful quoter to fulfill these requirements and be active in SAM by the time the

Contracting Officer makes award may result in award of the contract being made to the next otherwise successful quoter.

If you require assistance with acquiring a UEI*

(DUNS) number, completing your SAM Registration, Representations and Certifications, adding the assigned NAICS Code to your Reps & Certs, or accessing the solicitation and its attachments, please contact the Procurement Technical

Assistance Center (PTAC) closest to you. PTAC locations can be found at http://www.aptac-us.org/new/.

POINT OF CONTACT: The point of contact for this solicitation is Matt Frank, Contract Specialist, and can be reached by phone at (314) 655-1661, or by e-mail at matthew_frank@nps.gov.

Legacy Doc #: NPS

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

RFQ 140P6219Q0020 LIBO – Visitor Center Repointing Page 6 of 33

CLAUSES AND PROVISIONS

TABLE OF CONTENTS

SECTION A – Solicitation/Contract Form 52.252-2 Clauses Incorporated by Reference (Feb 1998) 52.252-6 Authorized Deviations in Clauses (Apr 1984) 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) 52.252-5 Authorized Deviations in Provisions (Apr 1984)

SECTION B – Quoter’s Price Schedule SECTION C – Description / Specifications / Statement of Work SECTION E – Inspection and Acceptance Clauses Incorporated by Reference 13 52.246-12 Inspection of Construction (Aug 1996)

SECTION F – Deliveries or Performance Clauses Incorporated by Full Text 13 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)

SECTION G – Contract Administration Data Clauses Incorporated by Full Text 13 G-1 Contract Administration 1452.201-70 Authorities and Delegations (Sep 2011) 1452.203-70 Restrictions on Endorsements – Department of the Interior (Jul 1996) 1452.204-70 Release of Claims – Department of the Interior (Jul 1996) 1452.228-70 Liability Insurance – Department of the Interior (Jul 1996) DOI Electronic Invoicing – Electronic Invoicing and Payment Requirements – Invoice Processing Platform

(IPP) (April 2013)

SECTION I – Contract Clauses Clauses Incorporated by Reference 16 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 16 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) 52.204-13 System for Award Management Maintenance (Oct 2018) 52.204-18 Commercial and Government Entity Code Maintenance (Jul 2016) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.204-21 Basic Safeguarding of Covered Contractor Information Systems (Jun 2016) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by

Kaspersky Lab and Other Covered Entities (Jul 2018) 52.209-6 Protecting the Government Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015) 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (Nov 2015) 52.215-8 Order of Precedence – Uniform Contract Format (Oct 1997)

RFQ 140P6219Q0020 LIBO – Visitor Center Repointing Page 7 of 33

52.219-6 Notice of Total Small Business Set-Aside (Nov 2011) 52.219-28 Post Award Small Business Program Representation (Jul 2013) 52.222-3 Convict Labor (June 2003) 52.222-6 Construction Wage Rate Requirements (Aug 2018) 52.222-7 Withholding of Funds (May 2014) 52.222-8 Payrolls and Basic Records (Aug 2018) 52.222-9 Apprentices and Trainees (Jul 2005) 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) 52.222-11 Subcontracts (Labor Standards) (May 2014) 52.222-12 Contract Termination – Debarment (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-14 Disputes Concerning Labor Standards (Feb 1988) 52.222-15 Certification of Eligibility (May 2014) 52.222-21 Prohibition of Segregated Facilities (Apr 2015) 52.222-26 Equal Opportunity (Sep 2015) 52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015) 52.222-50 Combating Trafficking in Persons (Jan 2019) 52.222-55 Minimum Wages Under Executive Order 13658 (Dec 2015) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2017) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (Sep

2013) 52.223-3 Hazardous Material Identification and Material Safety Data (Jan 1997) Alternate I (Jul 1995) 52.223-5 Pollution Prevention and Right-to-Know Information (May 2011) 52.223-6 Drug Free Workplace (May 2001) 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts (Aug

2018) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) 52.225-13 Restrictions on Certain Foreign Purchases (Jun 2008) 52.227-4 Patent Indemnity – Construction Contracts (Dec 2007) 52.228-2 Additional Bond Security (Oct 1997) 52.228-5 Insurance – Work on a Government Installation (Jan 1997) 52.228-11 Pledges of Assets (Aug 2018) 52.228-12 Prospective Subcontractor Requests for Bonds (May 2014) 52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.232-5 Payments Under Fixed-Price Construction Contracts (May 2014) 52.232-18 Availability of Funds (Apr 1984) 52.232-23 Assignment of Claims (May 2014)

52.232.27 Prompt Payment for Construction Contracts (Jan 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (Oct 2018) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013)

RFQ 140P6219Q0020 LIBO – Visitor Center Repointing Page 8 of 33

52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013) 52.233-1 Disputes (May 2014) 52.233-3 Protest After Award (Aug 1996) 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) 52.236-2 Differing Site Conditions (Apr 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) 52.236-5 Material and Workmanship (Apr 1984) 52.236-6 Superintendence by the Contractor (Apr 1984) 52.236-7 Permits and Responsibilities (Nov 1991) 52.236-8 Other Contracts (Apr 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984)

52.236-10 Operations and Storage Area (Apr 1984) 52.236-11 Use and Possession Prior to Completion (Apr 1984) 52.236-12 Cleaning Up (Apr 1984) 52.236-13 Accident Prevention (Nov 1991) 52.236-14 Availability and Use of Utility Services (Apr 1984) 52.236-15 Schedules for Construction Contracts (Apr 1984) 52.236-26 Preconstruction Conference (Feb 1995) 52.242-14 Suspension of Work (Apr 1984) 52.243-5 Changes and Changed Conditions (Apr 1984) 52.244-6 Subcontracts for Commercial Items (Jan 2019) 52.246-21 Warranty of Construction (Mar 1994) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form) (Apr 1984) 52.249-10 Default (Fixed-Price Construction) (Apr 1984) 52.253-1 Computer Generated Forms (Jan 1991) Clauses Incorporated by Full Text 18 52.222-36 Equal Opportunity for Workers with Disabilities (Jul 2014) 52.225-9 Buy American – Construction Materials (May 2014) 52.228-13 Alternative Payment Protections (Jul 2000)

SECTION J – List of Documents, Exhibits and Other Attachments List of Documents, Exhibits and Other Attachments

SECTION K – Representations, Certifications and Other Statements Provisions Incorporated by Full Text 22 52.204-8 Annual Representations and Certifications (Oct 2018)

SECTION L – Instructions, Conditions, and Notices Provisions Incorporated by Reference 25 52.204-7 System for Award Management (Oct 2018) 52.204-16 Commercial and Government Entity Code Reporting (Jul 2016)

RFQ 140P6219Q0020 LIBO – Visitor Center Repointing Page 9 of 33

52.204-22 Alternative Line Item Proposal (Jan 2017) 52.211-6 Brand Name or Equal (Aug 1999) 52.215-1 Instructions to Offerors – Competitive Acquisition (Jan 2017) Provisions Incorporated by Full Text 25 52.222-5 Construction Wage Rate Requirements – Secondary Site of the Work (May 2014) 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for

Construction (Feb 1999) 52.225-10 Notice of Buy American Requirement – Construction Materials (May 2014) 52.236-27 Site Visit (Construction) (Feb 1995) Alternate I (Feb 1995) 1452.215-71 Use and Disclosure of Proposal Information – Department of the Interior (Apr 1984) 1452.233-2 Service of Protest – Department of the Interior (Jul 1996) (Deviation)

SECTION M – Evaluation Factors for Award

RFQ 140P6219Q0020 LIBO – Visitor Center Repointing Page 10 of 33

SECTION A – Solicitation/Contract Form

This solicitation/contract is prepared using the uniform contract format as explained in FAR 15.204-1.

52.252-2 Clauses Incorporated by Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far http://farsite.hill.af.mil/vmdiara.htm

(End of clause)

52.252-6 Authorized Deviations in Clauses (Apr 1984)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.

(b) The use in this solicitation or contract of any Department of the Interior Acquisition Regulation (DIAR) (48 CFR Chapter 14) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.

(End of clause)

52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far http://farsite.hill.af.mil/vmdiara.htm

(End of provision)

52.252-5 Authorized Deviations in Provisions (Apr 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the provision.

(b) The use in this solicitation of any Department of the Interior Acquisition Regulation (DIAR) (48 CFR Chapter

14) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.

(End of provision)

(End of Section A) https://www.acquisition.gov/browse/index/far http://farsite.hill.af.mil/vmdiara.htm https://www.acquisition.gov/browse/index/far http://farsite.hill.af.mil/vmdiara.htm

RFQ 140P6219Q0020 LIBO – Visitor Center Repointing Page 11 of 33

SECTION B – Quoter’s Price Schedule

(a) Preparation of Quotations: The Government will not be responsible for any costs incurred by Quoter in the research, preparation, or submission of its quote.

(b) Quoter is to submit his/her quote by entering the lump sum total in Block 17 (found on Page 2) on the Standard Form (SF) 1442, Solicitation, Offer, and Award form.

(c) Notwithstanding the Quoter’s written submission of its lump sum quote on the SF-1442, pricing details, information and clarification may be requested of the Quoter by the Contracting Officer throughout the evaluation process. The Quoter shall promptly furnish the information requested to the Contracting Officer.

(End of Section B)

SECTION C – Description / Specifications / Statement of Work

Project: LIBO – Visitor Center Retuckpointing Repairs

Location: Lincoln Boyhood National Memorial Visitor Center 3027 E. South Street Lincoln City, IN 47552

Background: The HS-01 Lincoln Boyhood National Memorial (LIBO) Visitor Center was constructed during the years 1941-43. The original structure was built using limestone for the foundation and exterior. In 1966, offices, restrooms, an auditorium, and a museum addition were added to the west (rear) side of the original structure. The addition was constructed using sandstone for the walls. Much of the stone and mortar masonry in the structure is original and has suffered cracking and spalling from severe weather and over 75 years of continuous use. The primary tuck point repairs will be to the exterior sandstone addition, with about 1/3 of the total repairs to be completed on the interior walls and the limestone finishes.

Scope of Work: The project document specifying the scope, specifications and details of the work to be performed in its entirety is listed in Section J of this solicitation and is included as Attachment 1 - LIBO Statement of Work, Visitor Center Retuckpointing Repairs. The following is a general overview only.

Overview: The Contractor is to furnish all qualified labor, supervision, equipment, tools, supplies, materials, and vehicles, along with other items and services necessary to perform the work as set forth in Attachment 1, to the Government’s satisfaction. Generally, remove all loose and hairline cracked mortar and masonry joints and repoint with historically accurate mortar mixture, and remove, or subdue if unable to completely remove, the stone block staining to a more visually attractive state.

1. Removing loose and damaged exterior mortar joints and repointing the limestone and sandstone block mortar joints with new mortar on approximately 1,600 square feet of the interior and exterior of the historic building. See Appendix 1 “Photos” which are located in Attachment 1 for examples of required repairs.

2. Low pressure or hand cleaning approximately 100 SF of interior and exterior blocks with stains.

Chemicals may be used for the removal of stains, but the product will be non-toxic and pre-approved by the Contracting Officer’s Representative (COR) or Contracting Officer (CO) prior to its use. The stain removal areas will be sections of walls and it is expected the contractor will blend the cleaned areas into the untouched areas. See Appendix 1 “Photos” which are located in Attachment 1 for examples of required repairs.

RFQ 140P6219Q0020 LIBO – Visitor Center Repointing Page 12 of 33

3. All work required by the project documents to successfully and satisfactorily complete the work in its entirety, will be performed by the Contractor, to include minor items/services that may not be specifically mentioned in the project documents.

(End of Section C)

SECTION E – Inspection and Acceptance

Clauses Incorporated by Reference

52.246-12 Inspection of Construction (Aug 1996)

(End of Section E clauses)

SECTION F – Deliveries or Performance

Clauses Incorporated by Full Text

52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)

The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than ninety (90) calendar days. The time stated for completion shall include final cleanup of the premises.

(End of clause)

(End of Section F clauses)

SECTION G – Contract Administration Data

Clauses Incorporated by Full Text

G-1 Contract Administration

Contracting Office for this procurement is:

Department of the Interior, National Park Service Midwest Region / Missouri Major Acquisition Buying Office (MABO) 11 North 4th Street St. Louis, MO 63102

Contracting Officer is: Contract Specialist:

Kathryn M. Logsdon Matthew Frank Phone: (217) 391-3225 Phone: (314) 655-1661 E-mail: kathryn_logsdon@nps.gov E-mail: matthew_frank@nps.gov

Alternate Contracting Officers in the Primary Contracting Officer’s absence:

Neal Hause Michael D. Schreiber Phone: (314) 655-1609 Phone: (314) 655-1681 E-mail: neal_hause@nps.gov E-mail: michael_d_schreiber@nps.gov mailto:kathryn_logsdon@nps.gov file:///C:/Users/mjfrank.NPS/Desktop/matthew_frank@nps.gov mailto:neal_hause@nps.gov mailto:michael_d_schreiber@nps.gov

RFQ 140P6219Q0020 LIBO – Visitor Center Repointing Page 13 of 33

1452.201-70 Authorities and Delegations (Sep 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

(End of clause)

1452.203-70 Restrictions on Endorsements – Department of the Interior (Jul 1996)

The Contractor shall not refer to contracts awarded by the Department of the Interior in commercial advertising, as defined in FAR 31.205–1, in a manner which states or implies that the product or service provided is approved or endorsed by the Government, or is considered by the Government to be superior to other products or services. This restriction is intended to avoid the appearance of preference by the Government toward any product or service. The Contractor may request the Contracting Officer to make a determination as to the propriety of promotional material.

(End of clause)

RFQ 140P6219Q0020 LIBO – Visitor Center Repointing Page 14 of 33

1452.204-70 Release of Claims – Department of the Interior (Jul 1996)

After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.

(End of clause)

1452.228-70 Liability Insurance – Department of the Interior (Jul 1996)

(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:

$250,000 each person $500,000 each occurrence $1,000,000 property damage

(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.

(End of clause)

DOI Electronic Invoicing – Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (April 2013)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP). "Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:

https://www.ipp.gov. Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

Contractor is to email Contractor’s payment application and schedule of values to the Contracting Officer for approval prior to Contractor electronically entering invoice amount in IPP.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131. If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of clause)

(End of Section G clauses) https://www.ipp.gov/

RFQ 140P6219Q0020 LIBO – Visitor Center Repointing Page 15 of 33

RFQ 140P6219Q0020 LIBO – Visitor Center Repointing Page 16 of 33

SECTION I – Contract Clauses

Clauses Incorporated by Reference

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017)

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018)

52.204-13 System for Award Management Maintenance (Oct 2018)

52.204-18 Commercial and Government Entity Code Maintenance (Jul 2016)

52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014)

52.204-21 Basic Safeguarding of Covered Contractor Information Systems (Jun 2016)

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018)

52.209-6 Protecting the Government Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015)

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (Nov 2015)

52.215-8 Order of Precedence – Uniform Contract Format (Oct 1997)

52.219-6 Notice of Total Small Business Set-Aside (Nov 2011)

52.219-28 Post Award Small Business Program Representation (Jul 2013)

52.222-3 Convict Labor (June 2003)

52.222-6 Construction Wage Rate Requirements (Aug 2018)

52.222-7 Withholding of Funds (May 2014)

52.222-8 Payrolls and Basic Records (Aug 2018)

52.222-9 Apprentices and Trainees (Jul 2005)

52.222-10 Compliance with Copeland Act Requirements (Feb 1988)

52.222-11 Subcontracts (Labor Standards) (May 2014)

52.222-12 Contract Termination – Debarment (May 2014)

52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014)

52.222-14 Disputes Concerning Labor Standards (Feb 1988)

52.222-15 Certification of Eligibility (May 2014)

52.222-21 Prohibition of Segregated Facilities (Apr 2015)

52.222-26 Equal Opportunity (Sep 2015)

RFQ 140P6219Q0020 LIBO – Visitor Center Repointing Page 17 of 33

52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015)

52.222-50 Combating Trafficking in Persons (Jan 2019)

52.222-55 Minimum Wages Under Executive Order 13658 (Dec 2015)

52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2017)

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (Sep 2013)

52.223-3 Hazardous Material Identification and Material Safety Data (Jan 1997) Alternate I (Jul 1995)

52.223-5 Pollution Prevention and Right-to-Know Information (May 2011)

52.223-6 Drug Free Workplace (May 2001)

52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts (Aug 2018)

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011)

52.225-13 Restrictions on Certain Foreign Purchases (Jun 2008)

52.227-4 Patent Indemnity – Construction Contracts (Dec 2007)

52.228-2 Additional Bond Security (Oct 1997)

52.228-5 Insurance – Work on a Government Installation (Jan 1997)

52.228-11 Pledges of Assets (Aug 2018)

52.228-12 Prospective Subcontractor Requests for Bonds (May 2014)

52.228-14 Irrevocable Letter of Credit (Nov 2014)

52.232-5 Payments Under Fixed-Price Construction Contracts (May 2014)

52.232-18 Availability of Funds (Apr 1984)

52.232-23 Assignment of Claims (May 2014)

52.232.27 Prompt Payment for Construction Contracts (Jan 2017)

52.232-33 Payment by Electronic Funds Transfer – System for Award Management (Oct 2018)

52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013)

52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013)

52.233-1 Disputes (May 2014)

52.233-3 Protest After Award (Aug 1996)

52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004)

RFQ 140P6219Q0020 LIBO – Visitor Center Repointing Page 18 of 33

52.236-2 Differing Site Conditions (Apr 1984)

52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984)

52.236-5 Material and Workmanship (Apr 1984)

52.236-6 Superintendence by the Contractor (Apr 1984)

52.236-7 Permits and Responsibilities (Nov 1991)

52.236-8 Other Contracts (Apr 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984)

52.236-10 Operations and Storage Area (Apr 1984)

52.236-11 Use and Possession Prior to Completion (Apr 1984)

52.236-12 Cleaning Up (Apr 1984)

52.236-13 Accident Prevention (Nov 1991)

52.236-14 Availability and Use of Utility Services (Apr 1984)

52.236-15 Schedules for Construction Contracts (Apr 1984)

52.236-26 Preconstruction Conference (Feb 1995)

52.242-14 Suspension of Work (Apr 1984)

52.243-5 Changes and Changed Conditions (Apr 1984)

52.244-6 Subcontracts for Commercial Items (Jan 2019)

52.246-21 Warranty of Construction (Mar 1994)

52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form) (Apr 1984)

52.249-10 Default (Fixed-Price Construction) (Apr 1984)

52.253-1 Computer Generated Forms (Jan 1991)

(End of Section I clauses incorporated by reference)

Clauses Incorporated by Full Text

52.222-36 Equal Opportunity for Workers with Disabilities (Jul 2014)

(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.

(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal

RFQ 140P6219Q0020 LIBO – Visitor Center Repointing Page 19 of 33

Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

(End of clause)

52.225-9 Buy American – Construction Materials (May 2014)

(a) Definitions. As used in this clause—

“Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means—

(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

RFQ 140P6219Q0020 LIBO – Visitor Center Repointing Page 20 of 33

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

NONE

[Contracting Officer to list applicable excepted materials or indicate “none”]

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the

RFQ 140P6219Q0020 LIBO – Visitor Center Repointing Page 21 of 33 determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction Material Description Unit of Measure Quantity Price (Dollars)*

Item 1:

Foreign construction material ____________ ____________ ____________

Domestic construction material ____________ ____________ ____________

Item 2:

Foreign construction material ____________ ____________ ____________

Domestic construction material ____________ ____________ ____________

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]

[Include other applicable supporting information.]

[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]

(End of clause)

52.228-13 Alternative Payment Protections (Jul 2000)

(a) The Contractor shall submit one of the following payment protections:

(1) Payment Bond, or

(2) Irrevocable Letter of Credit

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within ten (10) calendar days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

RFQ 140P6219Q0020 LIBO – Visitor Center Repointing Page 22 of 33

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

(End of clause)

(End of Section I clauses incorporated by full text)

(End of Section I clauses)

SECTION J – List of Documents, Exhibits and Other Attachments

List of Documents, Exhibits and Other Attachments

The Attachments identified below are hereby incorporated as Attachments 1 through 5 and made a part of this solicitation / contract.

Attachment No. Title No. of Pages

1 LIBO Statement of Work, Visitor Center Retuckpointing Repairs 42

2 DOL Wage Determination, General Decision No. IN20190012 4/12/2019 5

3 Technical & Financial Capability Statement 3

4 Past Performance 1

5 Instructions for Submission of Quotation 3

(End of documents, exhibits and other attachments)

(End of Section J)

SECTION K – Representations, Certifications and Other Statements

Provisions Incorporated by Full Text

52.204-8 Annual Representations and Certifications (Oct 2018)

(a) (1) The North American Industry Classification System (NAICS) code for this acquisition is 238140 (Masonry Contractors).

(2) The small business size standard is $15 million.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b) (1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

RFQ 140P6219Q0020 LIBO – Visitor…