B09_Solicitation_Amendments_-_updated_drawings_0001.pdf
PDF 7 MB Posted
- Attached to
- GRPO - Mile Creek Stone Trail Bridge
- Solicitation number
- 140P6026B0005
About this file
This document is a set of construction drawings for trail improvements at the Mile Creek Stone Bridge area within Grand Portage National Monument in Minnesota, prepared by the National Park Service, Department of Interior, Midwest Regional Office.
The project encompasses multiple improvement areas including protection and removal plans, asphalt pavement layout and marking, surface restoration and erosion control measures, and general site conditions with contractor staging areas. Key construction elements specified include protection of existing stone bridge members (identified as P1-P12), removal of existing asphalt, stone walls, pavement, and other structures (identified as R1-R12), and construction of new asphalt pavement surfaces with associated drainage and accessibility features. The drawings detail silt fence installations, erosion control blanket systems, permanent pavement marking specifications with dimensional requirements, accessible sign and bollard details, and surface restoration with topical requirements. Contractor staging areas are designated with specific notations regarding equipment storage, material placement, parking restrictions, and environmental protection measures. The plans specify protection of existing Grand Portage Bay views, management of storm water drainage, and compliance with park access requirements. Drawing sheets include general conditions and contractor staging maps (CO.1), protection and removal plans (CO.1-CO.3), pavement layout and marking details (C1.1-C1.3), and surface restoration and erosion control plans (C2.1-C2.3), with all drawings dated April 23, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P6026B0005_Amd_0003.pdf | ||
| Sol_140P6026B0005_Amd_0002.pdf | ||
| B12_MISC_Clarifications_0002.docx | DOCX document | |
| Sol_140P6026B0005_Amd_0001.pdf | ||
| B08_Solicitation_-_Att_1_-_Specifications.pdf | ||
| B08_Solicitation_-_Att_4_-_Wage_Determination.pdf | ||
| B08_Solicitation_-_Att_3_-_Submittal_List.xls | XLS spreadsheet | |
| Sol_140P6026B0005.pdf | ||
| B08_Solicitation_-_Att_2_-_Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NATIONAL
PARK
SERVICE
TRAIL IMPROVEMENTS
MILE CREEK STONE BRIDGE
GRAND PORTAGE NATIONAL MONUMENT
REGIONAL LOCATION MAP
GRAND PORTAGE
NATIONAL MONUMENT
(SEE PARK LOCATION MAP)
MILE CREEK STONE BRIDGE - TRAIL IMPROVEMENTS
GRAND PORTAGE NATIONAL MONUMENT
NOT TO SCALE
PARK LOCATION MAP
NOT TO SCALE
PROJECT LOCATION MAP
NOT TO SCALE
MILE CREEK STONE BRIDGE
(SEE PROJECT LOCATION MAP)
PROJECT
LOCATION
NORTH NORTH NORTH
X 398 / 80035
NORTH
0 50' 100' 150'
SCALE: 1" = 50'
0 20' 40' 60'
SCALE: 1" = 20'
NORTH
SCALE: 1" = 20'
SCALE: 1" = 20'
NORTH
0 10' 20' 30'
SCALE: 1" = 10'
SCALE: 1" = 20'
NORTH
SCALE: 1" = 20'
| Sheets and Views |
| C0.1 |
| 2026-05-28T09:47:36-0500 | |
| Michael R Sharp |
File details come from the government source that posted it. Updated .