This document contains questions and answers from a contractor regarding a federal contract opportunity to rehabilitate quarters 3 at a National Park Service site in the Midwest Region. The contractor inquires about removing and replacing ductwork and sprinkler systems, confirming that ductwork and sprinkler pipe will be reinstalled in the same locations, and whether drywall ceilings need fully removed or can be cut in areas of new installation. The National Park Service responses indicate all ductwork and sprinkler systems should be replaced with new, ductwork and sprinkler pipe will be reinstalled in the original locations, and drywall ceilings can be cut in installation areas and matched to the existing ceiling. Clarification is also provided that details on drawing M102 pertain to wall installations rather than ceilings.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor’s Questions – NPS Response
1. Is it the Owner’s intent to remove the old duct work and sprinkler system if it appears to be in usable condition and replace with new?
NPS Response: Replace all with new pipe.
2. It appears on the drawing that the duct work and sprinkler pipe is going back in the exact locations, correct?
NPS Response: Yes
3. Is it the Owner’s intent to remove all of the drywall on the ceilings or can it be cut in the areas where new ducting and sprinkler pipe is going?
NPS Response: cut in the ceilings and match existing ceilings.
4. On drawing M102, sheet 13 of 29, detail 1 shows 2-ea 10x6 R-1/250. Are those to be installed in the ceiling or wall?
NPS Response: In the Wall