Att 01a REVISED_Schedule of Values_0001.pdf
PDF 936 KB Posted
- Attached to
- Improve drainfield at Fort Sumter, SC Federal contract opportunity
- Solicitation number
- 140P5521R0009
About this file
This document is a schedule of values for a federal construction project to improve the drainfield and sewer system at Fort Sumter National Monument in South Carolina. The project will involve a topographic survey, soil analysis, mobilization and demobilization, installation of riprap armoring along the west and east sides of the drainfield totaling over 5,000 tons, backfilling behind armor walls totaling over 2,000 tons, installing geotextile fabric covering 6,250 square feet, and reinstalling 110 linear feet of utility pipes. The total estimated cost of the project is provided in words and numbers. The solicitation was issued by the National Park Service Southeast Region within the Department of the Interior to improve the drainfield infrastructure at Fort Sumter National Monument.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre Bid Site Visit Sign In_0001.pdf | ||
| Question_Answers P5521R0009_0001.pdf | ||
| Sol_140P5521R0009_Amd_0001.pdf | ||
| Attachment 2 Wage Determination SC20210023.pdf | ||
| Attachment 1 Statement of Work_Photos_SOV.pdf | ||
| Read This First.docx | DOCX document | |
| Attachment 3 Past Performance Questionaire.docx | DOCX document | |
| UCF Clauses and Provisions.pdf | ||
| Sol_140P5521R0009.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item Item Description UNIT QTY UNIT PRICE TOTAL PRICE
1 Topographic Survey - Field Quantities LS 1 $ $
2 Native Soil Analysis (on-site soils for matching a source) LS 1 $ $
3 Mobilization/Demobilization LS 1 $ $
4 Rip-rap armoring along west sides of the drainfield (installed)* TN 4650 $ $
5 Rip-rap armoring along east fillet adjascent to fort wall (installed)* TN 500 $ $
6 Backfill behind southwest armor wall (installed) TN 250 $ $
7 Backfill behind nothwest armor wall (installed) TN 900 $ $
8 Backfill pipe and along east fillet adjascent to fort wall (installed) TN 225 $ $
9 Install Class 2 Unprotected Geotextile Fabric SF 6250 $ $
10 Utility Pipe Installations (water and sewer pipe re-installed) LF 110 $ $
11 Riprap Armor Finishing along southeast armor wall (installed) TN 120 $ $
Total Project Cost (words and number)
* Rip-rap Armor quantities are a combination of both Class C and Class E RipRap; Split to be determined after topo survey.
= changes per 04/22/2021 Site Summary/amendment
Fort Sumter - Drainfield Repair and Armoring Project FOSU 251133 - Schedule of Values Form stidwell Text Box Attachment C: Schedule of Values Form