These construction documents are for replacing a wastewater treatment plant at Fort Jefferson on Garden Key in Dry Tortugas National Park, Florida. The project involves demolishing the existing wastewater treatment plant and installing a new Orenco AX-20 treatment system with associated infrastructure improvements including new lift stations, forcemains, electrical panels, and a wooden platform structure.
The scope includes civil work such as wastewater collection system modifications, new gravity sewer lines, and treatment plant layout with a 2,000-gallon settling basin and 1,000-gallon recirculation tank. Architectural work encompasses demolition of existing equipment, installation of new built-in casework, shelving units, countertops, and weatherproof electrical enclosures. The electrical scope covers new transformers, load centers, control panels for the treatment system, and alarm panels for lift stations. The project is being managed under PMIS number DRTO 196743B with contract number 140P2019D0008, with Croft & Associates as the prime architect and Hale Innovation, LLC providing civil engineering services. The drawings are dated July 2025 and represent construction documents for this historic fort location requiring coordination with National Park Service preservation standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS PROJECT
LARGE DETACHED
MAGAZINE
OFFICERS QUARTERS
FOUNDATION RUINS
ENGINEERING OFFICERS
QUARTER'S RUINS
SMALL DETACHED
MAGAZINE
TORTUGAS
HARBOR LIGHT
B A
R R
A C
K S
F O
U N
D A
T
IO
N R
U
IN
S
FORT JEFFERSON,
GARDEN KEY
RESIDENCE QUARTERS
ENGINEERING OFFICERS
QUARTER'S RESIDENCE
CISTERN
MAIN DOCK
COAL SHED RUINS
C O
A L
S H
E D
R U
IN
S
MOAT
MOAT
ENTRANCE BRIDGE
GULF OF MEXICO
ATLANTIC OCEAN
SEAPLANE BEACH
NORTH SWIM BEACH
SOUTH SWIM BEACH
TO BUSH KEY
ATLANTIC
OCEAN
GARDEN KEY, FLORIDA
SOUTHEAST
KEY WEST
SITE LOCATION
DRY TORTUGAS NATIONAL PARK
GARDEN KEY, FLORIDA
70 MILES
GULF OF
MEXICO
FLORIDA
LOGGERHEAD KEY
SITE LOCATION
DRY TORTUGAS NATIONAL PARK
FORT JEFFERSON, GARDEN KEY
NOT TO SCALE
Project Manager Date
QUALITY DESIGN CERTIFICATION
OR
OR
Development (Title I)
Prepared in Accordance with Design by Design Development (Title I)
Construction Drawing Not Preceded
Approved by Superintendent on
Variance from Design Development (Title I)
Drawing No.
Date
STATEREGION COUNTY
NAME OF PARK
TITLE OF PROJECTCROFT & ASSOCIATES -
PRIME / ARCH / MEP:
CROFT & ASSOCIATES
KENNESAW, GEORGIA
SheetMark REVISION Date Initial
LOCATION WITHIN PARK
NATIONAL PARK SERVICE
UNITED STATES
DEPARTMENT OF THE INTERIOR
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
CONSTRUCTION DOCUMENTS
PMIS/PKG NO.
/2
/2
:4
:0
P M
REPLACE WASTEWATER TREATMENT
PLANT
FORT JEFFERSON AT GARDEN KEY
DRY TORTUGAS NATIONAL PARK
SOUTHEAST MONROE FLORIDA
1 15
XX
XXXXXX
DRTO 196743B
DRY TORTUGAS NATIONAL PARK
140P2019D0008
CIVIL:
HALE INNOVATION, LLC
MAITLAND, FLORIDA
REGION 2
DRTO 196743B
140P2019D0008
MATCH LINE MARK
DETAIL NUMBER
ELEVATION NUMBER
DRAWING NUMBER
SHEET NO. (WHERE SHOWN)
ELEVATION MARKS
X
XXXX
X
XXXX
LEGENDS & SYMBOLS:
SECTION NUMBER
XXXX
X
BUILDING SECTION
DETAIL
EXTERIOR ELEVATION
TITLES
SHEET NO. (WHERE SHOWN)
SHEET NO. (WHERE SHOWN)
SHEET NO. (WHERE SHOWN)
SECTION NUMBER
XXXX
X
WALL SECTION
SHEET NO. (WHERE SHOWN)
XXXX
X
CENTER LINE
GENERAL NOTES:
1. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE
SUPERVISION AND COORDINATION OF ALL
CONSTRUCTION PROCEDURES.
2. THESE PLANS SHOULD BE STUDIED AND USED IN THEIR
ENTIRETY AS INFORMATION VITAL TO EACH STAGE OF
CONSTRUCTION.
3. ALL WORK SHALL BE PERFORMED IN STRICT
ACCORDANCE WITH THE APPLICABLE CODES AND
ORDINANCES IN EFFECT AT THE TIME OF PERMIT. IN THE
EVENT OF A CONFLICT, THE MORE STRINGENT
REQUIREMENT SHALL GOVERN AND BE MET.
4. ALL DIMENSIONS SHALL BE VERIFIED BY THE
CONTRACTOR AND THE CONTRACTING OFFICER MUST
BE NOTIFIED OF ANY DISCREPANCIES BEFORE
PROCEEDING WITH THE WORK.
5. WHERE A DETAIL IS SHOWN FOR ONE CONDITION, IT
SHALL APPLY TO ALL LIKE OR SIMILAR CONDITIONS,
EVEN THOUGH NOT SPECIFICALLY MARKED ON THE
DRAWINGS.
6. THE GENERAL CONTRACTOR SHALL ENSURE THAT
CONSTRUCTION ENVIRONMENT IS MAINTAINED IN SUCH
A WAY TO INHIBIT MOLD AND MILDEW GROWTH.
7. THE GENERAL CONTRACTOR SHALL REMOVE PROMPTLY
AND LEGALLY ALL ACCUMULATED DEBRIS, PROTECT ALL
EXPOSED PORTIONS OF WORK FROM ELEMENTS, AVOID
OVER- LOADING STRUCTURE, AND SECURELY STORE
ALL ITEMS TO BE USED FOR CONSTRUCTION.
8. THE GENERAL CONTRACTOR SHALL VERIFY LOCATION
OF ALL EXISTING UNDERGROUND UTILITIES PRIOR TO
EXCAVATION.
9. THE GENERAL CONTRACTOR SHALL TAKE ALL
NECESSARY PRECAUTIONARY MEASURES TO PROTECT
THE PUBLIC AND ADJACENT PROPERTIES FROM
DAMAGE THROUGHOUT CONSTRUCTION.
10. ANY EXISTING UTILITIES TO BE ABANDONED SHALL BE
PROPERLY DISCONNECTED, PLUGGED OR CAPPED, AS
REQUIRED BY CODE OR SOUND CONSTRUCTION
PRACTICE.
11. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL
BE MADE FROM THE DRAWINGS OR SPECIFICATIONS
WITHOUT FIRST SECURING WRITTEN PERMISSION FROM
THE CONTRACTING OFFICER.
12. WHERE LACK OF INFORMATION, OR ANY DISCREPANCY
SHOULD APPEAR IN THE DRAWINGS OR
SPECIFICATIONS, REQUEST WRITTEN INTERPRETATION
FROM THE CONTRACTING OFFICER BEFORE
PROCEEDING WITH THAT PORTION OF THE WORK.
13. WHEN A SYSTEM OR ASSEMBLY IS SPECIFIED, ALL
NECESSARY PARTS AND MATERIALS REQUIRED FOR A
COMPLETE INSTALLATION/SYSTEM SHALL BE INSTALLED
ACCORDING TO THE MANUFACTURERS INSTRUCTIONS.
14. COORDINATE WITH ALL TRADES THE LOCATIONS OF
SLEEVES OR OTHER PRESET ACCESSORIES INVOLVING
OTHER TRADES.
15. THE GENERAL CONTRACTOR WILL BE HELD SOLELY
RESPONSIBLE FOR THE COMPLETION OF ALL WORK
SHOWN OR REASONABLY IMPLIED BY THESE DRAWINGS
AND/OR SPECIFICATIONS. THE GENERAL CONTRACTOR
SHALL CONFIRM ALL DIMENSIONS AND CONDITIONS AT
THE SITE AND SHALL IMMEDIATELY NOTIFY THE
CONTRACTING OFFICER IN WRITING OF ANY
DISCREPANCIES.
16. DETAILS TAKE PRECEDENCE OVER PLANS AND
ELEVATIONS - LARGER SCALE DRAWINGS TAKE
PRECEDENCE OVER SMALLER SCALE DRAWINGS.
17. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE
FOR OBTAINING ALL REQUIRED BUILDING PERMIT
APPROVALS PRIOR TO THE COMMENCEMENT OF ANY
WORK.
18. THE GENERAL CONTRACTOR SHALL FURNISH COPIES OF
PERMITS, INSPECTIONS, AND CERTIFICATES TO THE
CONTRACTING OFFICER AS REQUESTED ALONG WITH
FIRST APPLICATION FOR PAYMENT.
19. THE GENERAL CONTRACTOR SHALL PROVIDE ALL
CERTIFICATES OF OCCUPANCY, PERMITS AND CLOSE
OUT DOCUMENTS TO CONTRACTING OFFICER UPON
COMPLETION OF PROJECT.
20. THE DESIGN OF THIS PROJECT IS BASED UPON
INFORMATION PROVIDED BY NATIONAL PARK SERVICE
THROUGH EXISTING DRAWINGS AND ON-SITE
OBSERVATION. VERIFY ALL EXISTING DIMENSIONS AND
CONDITIONS PRIOR TO COMMENCING WORK. IF
EXISTING CONDITIONS ARE NOT AS DEPICTED OR
ANTICIPATED, NOTIFY THE CONTRACTING OFFICER
IMMEDIATELY UPON DISCOVERY AND DO NOT PROCEED
WITHOUT APPROVAL. IF CONTRACTOR PROCEEDS
WITHOUT APPROVAL, THE CONTRACTOR ACCEPTS FULL
LIABILITY FOR THAT PORTION OF CONSTRUCTION.
A
A/E ARCHITECT/ENGINEER
ABV ABOVE
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
ARCH ARCHITECT (URAL)
AUTO AUTOMATIC
AVG AVERAGE
& AND
@ AT
B
BLDG BUILDING
BD BOARD
B.O. BOTTOM OF
C
CJ CONTROL JOINT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS(ATION)
D
DBL DOUBLE
DEPT DEPARTMENT
Ø, DIA DIAMETER
DIFF DIFFUSER
DIM DIMENSION
DIV DIVISION
DN DOWN
DSC DENVER SERVICE CENTER
DTL DETAIL
DWG DRAWING
E
EA EACH
ELEC ELECTRICAL
ELEV ELEVATION
ENTR ENTRANCE
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXP JT EXPANSION JOINT
EXPS EXPOSE(D)
EXT EXTERIOR
F
FAB FABRICATION
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISHED FLOOR
ELEVATION
FFL FINISHED FLOOR LINE
FIN FINISH
FLR FLOOR(ING)
FRP FIBER REINFORCED PANEL
FRT FIRE RETARDANT TREATED
FT FOOT/FEET
G
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERAL
GPM GALLONS PER MINUTE
H
H HIGH
HDPE HIGH DENSITY
POLYETHLYENE
HDWR HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HORSEPOWER
HT HEIGHT
HVAC HEATING, VENTILATION AND
AIR CONDITIONING
I
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
J
JT JOINT
L
L LONG
M
MAINT MAINTENANCE
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MISC MISCELLANEOUS
MIN MINIMUM
MO MASONRY OPENING
MOD MODIFICATION
MTD MOUNTED
MTL METAL
N
N/A NOT APPLICABLE
NIC NOT IN CONTRACT
NPS NATIONAL PARK SERVICE
NTS NOT TO SCALE
O
OC ON CENTER
OPNG OPENING(S)
OPP OPPOSITE
OVHD OVERHEAD
P
PL PLATE
PLBG PLUMBING
PLYWD PLYWOOD
PMIS PROJECT MANAGEMENT
INFORMATION SYSTEM
PMIS NO PROJECT PMIS NUMBER
PNL PANEL
PREFAB PREFABRICATED
PREFIN PREFINISHED
PT PRESSURE TREATED
Q
QTY QUANTITY
R
R, RAD RADIUS
REINF REINFORCE (D) (ING)
REQD REQUIRED
REV REVISION
RM ROOM
RO ROUGH OPENING
RTU ROOF TOP UNIT
S
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STRUCT STRUCTURAL
STL STEEL
STO STORAGE
SUSP SUSPENDED
T
TBD TO BE DETERMINED
TEMP TEMPERED
TDH TOTAL DYNAMIC HEAD
THK THICK
T.O. TOP OF
TYP TYPICAL
U
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
V
VAR VARIES
VERT VERTICAL
VIF VERIFY IN FIELD
W
W/ WITH
W WIDTH
WC WATER CLOSET
WD WOOD
W/O WITHOUT
WTRPRF WATERPROOFING
ABBREVIATIONS:
DEFINITIONS:
A. "ALIGN" MEANS (I.E.) TO ACCURATELY LOCATE FINISH
FACES IN LINE OR SO AS TO BE PARALLEL.
B. DIMENSIONS NOTED AS "CLEAR" SHALL BE FROM
FINISHED FACE TO FINISHED FACE.
C. "TYPICAL" MEANS TYPICAL FOR ALL SIMILAR
CONDITIONS, UNO.
D. WHEREVER THE TERM "OR EQUAL" IS USED, IT SHALL
MEAN EQUAL OR BETTER PRODUCT AS APPROVED BY
THE CONTRACTING OFFICER.
APPLICABLE CODES:APPLICABLE CODES:
• INTERNATIONAL BUILDING CODE (IBC) 2021, WITH APPENDICES
• INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2021
• NFPA 70 NATIONAL ELECTRIC CODE (NEC) 2020
• NATIONAL HISTORIC PRESERVATION ACT, 1966 AS AMENDED
• SECRETARY OF INTERIOR STANDARDS FOR REHABILITATION,
CODIFIED 36 CFR 67
• SECRETARY OF THE INTERIOR STANDARDS FOR THE
TREATMENT OF HISTORIC PROPERTIES
• RECOMMENDED STANDARDS FOR WASTEWATER FACILITIES -
BOARD OF STATE AND PROVINCIAL PUBLIC HEALTH AND
ENVIRONMENTAL MANAGERS (2014 EDITION - "10 STATE
STANDARDS")
• NFPA 820: STANDARD FOR FIRE PROTECTION IN WASTEWATER
TREATMENT AND COLLECTION FACILITIES (2020 EDITION)
• EPA ONSITE WASTEWATER TREATMENT SYSTEMS MANUAL
(2002 EDITION)
• FLORIDA BUILDING CODE, 2020 7TH EDITION
• FLORIDA DEPARTMENT OF HEALTH
• FLORIDA ADMINISTRATIVE CODE & REGISTER, RULE CHAPTER
64E-6: STANDARDS FOR ONSITE SEWAGE TREATMENT AND
DISPOSAL SYSTEMS
• FLORIDA ADMINISTRATIVE CODE & REGISTER, RULE CHAPTER
62-600: DOMESTIC WASTEWATER FACILITIES
• FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
• NSF CERTIFICATION
• NSF/ANSI 40 FOR RESIDENTIAL WASTEWATER TREATMENT
SYSTEMS
• NSF/ANSI 245 FOR NITROGEN REDUCTION
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:4
:0
P M
GENERAL INFORMATION AND
INDEX OF DRAWINGSG101
C.BAXTER
J.RYAN
J.MORGAN
2 15
REPLACE WASTEWATER TREATMENT PLANT XX
XXXXXX
DRTO 196743B
DRY TORTUGAS NATIONAL PARK07/23/2025
INDEX OF DRAWINGS
SHEET
SUB
SHEET TITLE OF SHEET
GENERAL
1 CS COVER SHEET
2 G101 GENERAL INFORMATION AND INDEX OF DRAWINGS
ARCHITECTURAL SITE
3 AS101 ARCHITECTURAL SITE PLAN
CIVIL
4 C1 WASTEWATER COLLECTION SYSTEM PLAN
5 C2 WASTEWATER COLLECTION DEMOLITION PLAN
6 C3 COLLECTION SYSTEM PLAN AND PROFILE
7 C4 WASTEWATER TREATMENT PLANT LAYOUT
8 C5 DETAILS
9 C6 TREATMENT PLANT FLOW DIAGRAM
ARCHITECTURAL DEMOLITION
10 AD101 DEMOLITION FLOOR PLAN
ARCHITECTURAL
11 A101 FLOOR PLAN
12 A201 ELEVATIONS
13 A351 SECTION DETAILS
ELECTRICAL
14 E101 ELECTRICAL PLAN AND RISER
15 E201 SCHEDULES AND DETAILS
Grand total: 15
A. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO EXISTING
CONDITIONS TO REMAIN. DAMAGE SHALL BE RESTORED TO MATCH
EXISTING OR BETTER.
B. CONTRACTOR IS RESPONSIBLE FOR REPAIRING DAMAGE TO
EXISTING LANDSCAPING ONCE PROJECT IS COMPLETE.
COORDINATE WITH PARK TO IDENTIFY LANDSCAPE CONDITIONS TO
BE RESTORED.
C. ANY POTENTIAL MATERIAL LAYDOWN AREAS TO BE COORDINATED
WITH THE CONTRACTING OFFICER AND THE PARK.
D. SEE CIVIL DRAWINGS FOR ADDITIONAL INFORMATION.
E. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
GENERAL SITE NOTES:
WASTE WATER
TREATMENT PLANT,
SEE A101
EXISTING RESIDENCE QUARTERS
EXISTING CISTERN
EXISTING SMALL DETACHED MAGAZINE
MAGAZINE
MOAT
MOAT
EXISTING ENGINEERING OFFICERS
QUARTER'S RESIDENCE
EXISTING TREE LINE (TYP)
MAIN DOCK
COUNTERSCARP (MOAT WALL)
CAMPING AREA AND MAIN BEACH
ENTRANCE BRIDGE
BRICK DEBRIS
MOAT MOAT
DOCK HOUSE
SEAPLANE BEACH
OFFICERS QUARTERS
FOUNDATION RUINS
LIGHTHOUSE
TOWER ABOVE
PROTECT
EXISTING BRICK
WALKWAY
SHOT
FURNACE
LARGE
MAGAZINE
ENGINEERING OFFICERS
QUARTER'S RUINS
B A
R R
A C
K S
F O
U N
D A
T
IO
N R
U
IN
S
LIFT STATION 1 (EXISTING)
LIFT STATION 2 (EXISTING) SEE C5 FOR NEW COVER
OVER THIS LIFT STATION. EXISTING LIFT STATION
COVER TO BE CAREFULLY DEMOLISHED AND
REMOVED FROM NPS PROPERTY FOR
APPROPRIATE DISPOSAL.
NEW E/ONE SENTRY ALARM PANEL FOR LIFT
STATION 1. MOUNT ON STAINLESS STEEL
UNISTRUT 12" ABOVE FINISHED GRADE.
ROUT CONDUIT A MINIMUM
OF 18" BELOW GRADE
NEW E/ONE SENTRY ALARM PANEL FOR LIFT STATION 2.
MOUNT OUTSIDE OF LIFT STATION COVER ON STAINLESS
STEEL UNISTRUT 12" ABOVE FINISHED GRADE.
DOSING TANK (EXISTING)
EXISTING LAUNDRY
ROOM. VERIFY IN FIELD
FOR EXACT LOCATION.
EXISTING WATER LAB.
VERIFY IN FIELD FOR
EXACT LOCATION.
EFFLUENT DRAIN FIELD
(EXISTING) SEE CIVIL DRAWINGS.
MOAT
MOAT
MOAT
LIMITS OF CONSTRUCTION WORK
PROPOSED MAIN CONSTRUCTION
STAGING AREA. CONFIRM SIZE /
LOCATION WITH THE PARK PRIOR TO
BEGINNING CONSTRUCTION.
COAL SHED RUINS
NORTH SWIM BEACH
PROPOSED SECONDARY
CONSTRUCTION STAGING AREA FOR
DOCK HOUSE SEPTIC TANK REMOVAL
ONLY. CONFIRM SIZE / LOCATION WITH
THE PARK PRIOR TO BEGINNING
CONSTRUCTION.
PROPOSED SAND BORROW AREA FOR
DOCK HOUSE SEPTIC TANK REMOVAL ONLY.
CONFIRM SIZE / LOCATION WITH THE PARK
PRIOR TO BEGINNING CONSTRUCTION.
PROPOSED SAND BORROW AREA FOR
DOCK HOUSE SEPTIC TANK REMOVAL ONLY.
CONFIRM SIZE / LOCATION WITH THE PARK
PRIOR TO BEGINNING CONSTRUCTION.
RESIDENCE 5
SITE PLAN LEGEND:
LIMITS OF
CONSTRUCTION
WORK
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:5
:2
A
M
ARCHITECTURAL SITE PLAN
AS101
C.BAXTER
J.RYAN
J.MORGAN
3 15
REPLACE WASTEWATER TREATMENT PLANT XX
XXXXXX
DRTO 196743B
DRY TORTUGAS NATIONAL PARK07/23/2025
SCALE OF FEET
50050
AS101
1 ARCHITECTURAL SITE PLAN
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
07/23/2025
J. DOWNEY
B.HALE
L.HALE
DRTO 196743B
XXXXXX
XX
DRY TORTUGAS NATIONAL PARK
SYSTEM PLAN
WASTEWATER COLLECTION
REPLACE WASTEWATER TREATMENT PLANT
C1
SITE PLAN - GARDEN KEY (FORT JEFFERSON)1
C1
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
07/23/2025
J. DOWNEY
B.HALE
L.HALE
DRTO 196743B
XXXXXX
XX
DRY TORTUGAS NATIONAL PARK
DEMOLITION PLAN
WASTEWATER COLLECTION
REPLACE WASTEWATER TREATMENT PLANT
C2
SITE PLAN - GARDEN KEY (FORT JEFFERSON)1
C2
SANITARY SEWER ALIGNMENT PLAN
SCALE 1"=50'
C3
SANITARY SEWER PROFILE
HORIZONTAL SCALE: 1"=50'
VERTICAL SCALE: 1"=4'
C3
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
07/23/2025
J. DOWNEY
B.HALE
L.HALE
DRTO 196743B
XXXXXX
XX
DRY TORTUGAS NATIONAL PARK
PLAN & PROFILE
COLLECTION SYSTEM
REPLACE WASTEWATER TREATMENT PLANT
C3
TREATMENT PLANT LAYOUT1
C4
TREATMENT PLANT SECTION2
C4
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
07/23/2025
J. DOWNEY
B.HALE
L.HALE
DRTO 196743B
XXXXXX
XX
DRY TORTUGAS NATIONAL PARK
PLANT LAYOUT
WASTEWATER TREATMENT
REPLACE WASTEWATER TREATMENT PLANT
C4
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
07/23/2025
J. DOWNEY
B.HALE
L.HALE
DRTO 196743B
XXXXXX
XX
DRY TORTUGAS NATIONAL PARK
DETAILS
REPLACE WASTEWATER TREATMENT PLANT
C5
LIFT STATION 1 PLAN AND SECTION1
C5
LIFT STATION 2 PLAN AND SECTION2
C5
PIPE TRENCH REQUIREMENTS3
C5
NOT TO SCALE NOT TO SCALE
NOT TO SCALE
SECTION VIEW
PLAN
ID TAG
S.C.E.S.D.
WATER
PVC
LOCATOR WIRE ACCESS4
C5 NOT TO SCALE
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
07/23/2025
J. DOWNEY
B.HALE
L.HALE
DRTO 196743B
XXXXXX
XX
DRY TORTUGAS NATIONAL PARK
FLOW DIAGRAM
TREATMENT PLANT
REPLACE WASTEWATER TREATMENT PLANT
C6
LIFT STATION 2 LIFT STATION 1
FORCEMAIN
FORCEMAIN
PRIMARY TREATMENT TANK
2,000 GALLON SETTLING
BASIN COMPARTMENT
1,000 GALLON
RECIRCULATION TANK
COMPARTMENT
E-ONE PUMP
E-ONE PUMP
ORENCO
RECIRCULATION
PUMP
ORENCO AX-20 UNIT
ORENCO AX-20 UNIT
FLOW SPLIT ALTERNATES
PER ORENCO CONTROLS
ORENCO SUPPLIED
TREATMENT
PIPING
ORENCO SUPPLIED
TREATMENT
PIPING
FLOW SPLITS PER ORENCO
CONTROLS
DOSING TANK
(EXISTING) TO DRAIN FIELD
WASTEWATER TREATMENT PLANT FLOW DIAGRAM 1
C6
NOTES:
1. ORENCO SUPPLIED SYSTEM BEGINS AT INFLUENT DUMPING INTO SETTLING BASIN COMPARTMENT AND ENDS AFTER THE FLOW SPLIT IMMEDIATELY
BEFORE THE DOSING TANK.
2. ARROWS ALONG SINGLE LINES DENOTE FLOW DIRECTION.
3. SYSTEM NOT SHOWN TO SCALE AND ONLY SHOWN FOR PROCESS CLARITY.
4. SYSTEM PERFORMANCE DEPENDS ON INFLUENT CONCENTRATION. HISTORICAL DATA DEMONSTRATES THE FOLLOWING DISCHARGE PERFORMANCE:
4.1. cBOD5 < 5 MG/L
4.2. TOTAL SUSPENDED SOLIDS , 5 MG/L
4.3. NITROGEN REDUCTION = 64%
4.4. PHOSPHORUS REDUCTION = 33%
4.5. DATA TAKEN FROM TESTING CONDUCTED IN ACCORDANCE WITH NSF/ANSI 40 TESTING REQUIREMENTS PERFORMED BY A THIRD PARTY.
REMOVE EXISTING WASTEWATER
TREATMENT PLANT AND WOODEN
PLATFORM IN ITS ENTIRETY. WASTEWATER
TREATMENT CONTROL PANEL CABINET TO
REMAIN FOR REPLACEMENT OF INTERIOR
COMPONENTS. SEE CIVIL DRAWINGS FOR
ADDITIONAL NOTES AND INFORMATION.
REMOVE EXISTING WOOD
STEPS AND GUARDRAIL
REMOVE EXISTING BUILT-IN
COUNTERTOP AND
DECORATIVE OPENING
PANELING
REMOVE BASE CABINETS,
COUNTERTOP, AND SINK. CAP
EXISTING PLUMBING UNTIL
NEW SINK INSTALLATION.
DISCONNECT EXISTING POWER TO WATER
TREATMENT EQUIPMENT. REMOVE
EXISTING ELECTRICAL PANEL AND PREP
FOR NEW ELECTRICAL PANEL. SEE
ELECTRICAL DRAWINGS.
EXISTING DRAIN FIELD DOSING TANK
PUMPS PANEL TO BE REMOVED AND
PREP FOR NEW BOX / PANEL.
EXISTING BOX TO BE REMOVED AND PREP
FOR NEW BOX. ITEMS INSIDE FOR
WASTEWATER TREATMENT PLANT TO BE
REMOVED. PREP FOR NEW SYSTEM. SEE
ELECTRICAL DRAWINGS.
LIFT STATION PUMP CONTROL PANELS TO
BE REMOVED. EXISTING STAINLESS STEEL
UNISTRUT TO REMAIN AND BE REUSED.
REMOVE BUILT-IN
SHELVING UNIT AND PREP
FOR NEW
EXISTING STORAGE CABINETS.
COORDINATE WITH PARK FOR
STORAGE AND FOR
REINSTALLATION OR REMOVAL.
EXISTING STORAGE CABINETS.
COORDINATE WITH PARK FOR STORAGE
AND FOR REINSTALLATION OR REMOVAL.
REMOVE LOWER WOODEN PLATFORM.
REMOVE LOWER WOODEN
PLATFORM.
LINE FOR ROOF ELEVATION
CHANGE ABOVE
GENERAL DEMOLITION NOTES:
A. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR USING
TEMPORARY PROTECTION THROUGHOUT THE PROJECT TO
SAFEGUARD THE SURFACE QUALITY OF FINISHES TO REMAIN.
B. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK,
BRING ANY DISCREPANCIES FROM THE DRAWINGS AND NOTES TO
THE CO IMMEDIATELY. MINOR CHANGES IN THE SCOPE OF THE
DEMOLITION WORK SHALL NOT JUSTIFY ANY ADDITIONAL COST.
C. ANY EXISTING ITEM TO REMAIN THAT IS DEMOLISHED OR DAMAGED
BY DEMOLITION SHALL BE REPLACED WITH AN EQUAL ITEM OR
BETTER AS APPROVED BY THE CONTRACTING OFFICER AT NO COST
TO THE GOVERNMENT.
D. FURNISH, INSTALL, AND MAINTAIN IN SAFE CONDITIONS AT ALL
TIMES TEMPORARY PROTECTION REQUIRED TO ENSURE SAFETY
FOR PERSONS AND PROPERTY DURING DEMOLITION AND REMOVAL
WORK.
E. FURNISH, INSTALL, AND MAINTAIN DUST COVERINGS TO PREVENT
THE SPREAD OF DUST BEYOND THE IMMEDIATE AREA WHERE
DEMOLITION IS BEING PERFORMED.
F. ALL WORK MUST BE COORDINATED AND SCHEDULED WITH THE
PARK AND OCCUPANTS OF THIS BUILDING SO AS TO PROVIDE THE
LEAST AMOUNT OF DISRUPTION OF THE BUILDING ACTIVITIES AS
POSSIBLE.
G. CLEAN JOB SITE DAILY BY REMOVING SCRAPS, DEBRIS, AND WASTE
MATERIALS OUTSIDE OF PARK BOUNDARIES.
H. SEE CIVIL FOR ADDITIONAL DEMOLITION.
I. SEE SPECIFICATIONS FOR ADDITIONAL DEMOLITION.
DEMOLITION PLAN LEGEND:
EXISTING TO
REMAIN (SOLID
GRAY LINES)
EXISTING TO
BE DEMOED
(DASHED LINES)
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:4
:0
P M
DEMOLITION FLOOR PLANAD101
C.BAXTER
J.RYAN
J.MORGAN
10 15
REPLACE WASTEWATER TREATMENT PLANT XX
XXXXXX
DRTO 196743B
DRY TORTUGAS NATIONAL PARK07/23/2025
AD101
1 DEMOLITION FLOOR PLAN
SCALE OF FEET
2 0 2 4
B L D
G
UP
NEW STAINLESS STEEL ELECTRICAL
PANEL (INSIDE A NEW
POLYCARBONATE WEATHERPROOF
BOX). SEE ELECTRICAL DRAWINGS.
E X
IS
T
IN
G
R O
V
IF
EXISTING RO (VIF)
3' - 3"
E X
IS
T
IN
G
R O
V
IF
EXISTING RO (VIF)
3' - 3"
A201
A101
NEW BUILT-IN SHELVING UNIT
INSIDE EXISTING OPENING.
SEE DETAIL 3/A351.
WASTEWATER
TREATMENT PLANT.
SEE CIVIL DRAWINGS.
INSTALL CABINET
PROVIDED BY THE PARK.
COORDINATE WITH PARK.
NEW DRAIN FIELD DOSING TANK
PUMPS PANEL (INSIDE A NEW
POLYCARBONATE WEATHERPROOF
BOX). SEE ELECTRICAL DRAWINGS.
EQ
PER MANUF REQUIREMENTS
10' - 0" EQ
T O
P L A
T F
O R
M
O R
E Q
O R
E Q
V
IF
E Q
E Q
E Q
A351
2' - 1"
A351
LINE FOR ROOF ELEVATION
CHANGE ABOVE
NEW BUILT-IN COUNTERTOP
INSIDE EXISTING OPENING.
SEE DETAIL 4/A351.
T
R E
A D
S
E A
C H
V
IF
V E
R
IF
Y W
IT
H
G R
A D
E
3' - 0"
CLEAR
1' - 11 1/2"
NEW CONTROL PANEL (INSIDE A
NEW POLYCARBONATE
WEATHERPROOF BOX) FOR
WASTEWATER TREATMENT PLANT.
SEE ELECTRICAL DRAWINGS.
NEW STAINLESS STEEL ELECTRICAL
PANELS (INSIDE A POLYCARBONATE
WEATHERPROOF BOX). SEE
ELECTRICAL DRAWINGS.
A351
A351
LINE FOR PLATFORM
(V
IF
A351
A351
NEW CONTROL PANEL (INSIDE A
POLYCARBONATE WEATHERPROOF
BOX) FOR NEW SYSTEM. SEE
ELECTRICAL DRAWINGS.
NEW CONTROL PANEL (INSIDE A
POLYCARBONATE WEATHERPROOF
BOX). SEE ELECTRICAL DRAWINGS.
A. DO NOT SCALE DRAWINGS. USE DIMENSIONS ONLY.
B. DIMENSIONS ARE TO FACE OF STUD OR MASONRY U.N.O.
C. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS
AND NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF
DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
D. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL BE MADE
FROM THE DRAWINGS WITHOUT FIRST SECURING WRITTEN
PERMISSION FROM THE CONTRACTING OFFICER.
E. REQUEST WRITTEN INTERPRETATION FROM THE CONTRACTING
OFFICER FOR ANY LACK OF OR AMBIGUITY OF INFORMATION IN THE
DRAWINGS PRIOR TO PROCEEDING WITH THAT PORTION OF THE
WORK.
F. GENERAL CONTRACTOR TO COORDINATE WITH PARK AND THE CO
ON FINAL MATERIAL FINISHES PRIOR TO ORDERING.
G. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
GENERAL NOTES:
1X COMPOSITE DECKING
ON PLATFORM
6X6 PRESSURE TREATED
TIMBER POST (TYP)
PRESSURE TREATED
(2)-2X10 WOOD BEAM WITH
(2)-5/8" DIA. THRU-BOLTS AT
EACH END OF BEAM (TYP)
PRESSURE TREATED 2X8 WOOD
JOIST @ 24" O.C.. CONNECT TO
WOOD BEAM WITH SIMPSON LUS28
STAINLESS STEEL HANGER (TYP)
PRESSURE TREATED 2X10 ON
EACH SIDE OF POST BASE (IN BOTH
DIRECTIONS). CONNECT TO POST
(2)-5/8" DIA. THRU BOLTS
NOTE: PLATFORM DESIGNED FOR MAINTENANCE
WORK LOADING (25 PSF LIVE LOAD)
P E
R M
A N
U F
R E
Q U
IR
E
M E
N T
S
PER MANUF REQUIREMENTS
10' - 0"
A201
A201
A201
A201
PRESSURE TREATED
(2)-2X10 WOOD BEAM WITH
(2)-5/8" DIA. THRU-BOLTS AT
EACH END OF BEAM (TYP)
PRESSURE TREATED 2X10 ON
EACH SIDE OF POST BASE (IN BOTH
DIRECTIONS). CONNECT TO POST
(2)-5/8" DIA. THRU BOLTS
PRESSURE TREATED 2X6 WOOD
JOIST @ 16" O.C.. CONNECT TO
WOOD BEAM WITH SIMPSON LUS28
STAINLESS STEEL HANGER (TYP)
PRESSURE TREATED 2X10 ON
EACH SIDE OF STAIR. CONNECT TO
POST (2)-5/8" DIA. THRU BOLTS
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:4
:0
P M
FLOOR PLANA101
C.BAXTER
J.RYAN
J.MORGAN
11 15
REPLACE WASTEWATER TREATMENT PLANT XX
XXXXXX
DRTO 196743B
DRY TORTUGAS NATIONAL PARK07/23/2025
A101
1 FLOOR PLAN
SCALE OF FEET
2 0 2 4
B L D
G
A101
2 PLATFORM FRAMING PLAN
NEW FREE STANDING STORAGE
SHELVING UNIT INSIDE EXISTING
MASONRY OPENING. PROTECT EXISTING
MASONRY WALLS. SEE DETAILS ON A351.
EXISTING MASONRY WALLS
NEW SINK TO BE
CONNECTED TO
EXISTING PLUMBING.
LINE FOR CASEWORK
BEHIND COLUMN
E X
IS
T
IN
G
T O
P R
O
V
IF
E X
IS
T
IN
G
B O
T T
O M
R O
V
IF
A351
A351
E Q
E Q
E X
IS
T
IN
G
B O
T T
O M
R O
V
IF
(V
IF
OR EQ
2' - 6" 3' - 0"
OR EQ
2' - 6"
EQ EQ EQ
VIF
8' - 0"
LINE FOR CASEWORK
BEHIND COLUMN
INSTALL CABINET
PROVIDED BY THE PARK
NEW BUILT-IN COUNTERTOP
INSIDE EXISTING OPENING.
SEE DETAIL 4/A351.
EXISTING RO (VIF)
12' - 3"
EXISTING RO (VIF)
4' - 0"
(V
IF
E X
IS
T
IN
G
B O
T T
O M
R O
V
IF
E X
IS
T
IN
G
T O
P R
O
V
IF
E X
IS
T
IN
G
T O
P R
O
V
IF
"1
A351
A351
A. DO NOT SCALE DRAWINGS. USE DIMENSIONS ONLY.
B. DIMENSIONS ARE TO FACE OF STUD OR MASONRY U.N.O.
C. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS
AND NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF
DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
D. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL BE MADE
FROM THE DRAWINGS WITHOUT FIRST SECURING WRITTEN
PERMISSION FROM THE CONTRACTING OFFICER.
E. REQUEST WRITTEN INTERPRETATION FROM THE CONTRACTING
OFFICER FOR ANY LACK OF OR AMBIGUITY OF INFORMATION IN THE
DRAWINGS PRIOR TO PROCEEDING WITH THAT PORTION OF THE
WORK.
F. GENERAL CONTRACTOR TO COORDINATE WITH PARK AND THE CO
ON FINAL MATERIAL FINISHES PRIOR TO ORDERING.
G. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
GENERAL NOTES:
NOTE: PLATFORM DESIGNED FOR MAINTENANCE
WORK LOADING (25 PSF LIVE LOAD)
6X6 PRESSURE TREATED
TIMBER POST (TYP)
PRESSURE TREATED (2)-2X10 WOOD
BEAM WITH (2)-5/8" DIA. THRU-BOLTS
AT EACH END OF BEAM (TYP)
PRESSURE TREATED WOOD JOIST.
SEE 2/A101 FRAMING PLAN (TYP)
PRESSURE TREATED 2X10 ON
EACH SIDE OF POST BASE (IN BOTH
DIRECTIONS). CONNECT TO POST
(2)-5/8" DIA. THRU BOLTS
1X COMPOSITE DECKING
ON PLATFORM
WASTEWATER
TREATMENT PLANT.
SEE CIVIL DRAWINGS.
WASTEWATER
TREATMENT PLANT.
SEE CIVIL DRAWINGS.
8 TREADS @ 11" EACH
7' - 4" 13' - 2" 10' - 0" 4' - 2"
A351
A351
E
Q U
A L R
IS
E
R S
M
IN
/7 "M
A X
V E
R
IF
Y W
G
R A
D E
T Y
P
A201
E X
IS
T
IN
G
B O
T T
O M
R O
V
IF
E X
IS
T
IN
G
T O
P R
O
V
IF
A351
NOTE: PLATFORM DESIGNED FOR MAINTENANCE
WORK LOADING (25 PSF LIVE LOAD)
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:4
:0
P M
ELEVATIONSA201
C.BAXTER
J.RYAN
J.MORGAN
12 15
REPLACE WASTEWATER TREATMENT PLANT XX
XXXXXX
DRTO 196743B
DRY TORTUGAS NATIONAL PARK07/23/2025
SCALE OF FEET
2 0 2 4
A201
1 ELEVATION OF CASEWORK
A201
2 SECTION DETAIL - PLATFORM AND STAIRS
A201
3 PLATFORM SECTION
A. DO NOT SCALE DRAWINGS. USE DIMENSIONS ONLY.
B. DIMENSIONS ARE TO FACE OF STUD OR MASONRY U.N.O.
C. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS
AND NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF
DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
D. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL BE MADE
FROM THE DRAWINGS WITHOUT FIRST SECURING WRITTEN
PERMISSION FROM THE CONTRACTING OFFICER.
E. REQUEST WRITTEN INTERPRETATION FROM THE CONTRACTING
OFFICER FOR ANY LACK OF OR AMBIGUITY OF INFORMATION IN THE
DRAWINGS PRIOR TO PROCEEDING WITH THAT PORTION OF THE
WORK.
F. GENERAL CONTRACTOR TO COORDINATE WITH PARK AND THE CO
ON FINAL MATERIAL FINISHES PRIOR TO ORDERING.
G. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
GENERAL NOTES:
1"
1' - 9" 3"
2' - 0"
SPLASH
CAULK
QUARTZ COUNTERTOP
OVER 3/4" MARINE GRADE
PLYWOOD TOP, WRAP
ALONG FRONT EDGE
HARDWARE
EXISTING SLAB
WOOD VENEER BASE
CONCEALED HINGE,TYP.
PVC CABINET BOX
3/4" COMPOSITE DOOR
PRESSURE TREATED 2x4
SINK AND FAUCET. CONNECT
TO EXISTING PLUMBING
HARDWARE
DRAWER
EXISTING SLAB
WOOD VENEER BASE
ADJUSTABLE SHELF
1"
1' - 8"
1' - 9" 3"
2' - 0"
CONCEALED HINGE,TYP.
PVC CABINET BOX
3/4" COMPOSITE DOOR
SPLASH
CAULK
QUARTZ COUNTERTOP
OVER 3/4" MARINE GRADE
PLYWOOD TOP, WRAP
ALONG FRONT EDGE
PRESSURE TREATED 2x4
E X
IS
T
IN
G
R O
V
IF
E Q
E Q
3/4" OSB (FULL SHEET)
EXISTING BRICK MASONRY
PRESSURE TREATED 2X4
FRAMING (TYP)
3/4" OSB (FULL SHEET)
PRESSURE TREATED 2X4
WOOD POST WITH 2X4
SISTERED IN FRAMING
USING 2-1/2" WOOD
SCREWS (TYP)
EXISTING BRICK MASONRY
PRESSURE TREATED 2X4
FRAMING (TYP)
3/4" OSB (FULL SHEET)
PRESSURE TREATED 2X4
WOOD POST WITH 2X4
SISTERED IN FRAMING
USING 2-1/2" WOOD
SCREWS (TYP)
3/4" PRESSURE TREATED
WOOD PANELING TO BE CUT
TO FIT EXISTING OPENING.
TO MATCH EXISTING.
7'-9"
T/O OPENING
/2
2 1/4"
ONLY AT
STAIRS
/2
1.5" O.D. HANDRAIL,
STAINLESS STEEL
2X6 COMPOSITE CAP
2X4 PT RAIL
2X4 PT RAIL
2X2 PT PICKET @ 5
1/2" O.C. MAX.
(MAX. 4" GAP)
4X4 PT POST @ 48"
O.C. MAX.
2-8D NAILS
2-8D NAILS
5/8" DIA.
THRU-BOLTS
1X COMPOSITE DECKING
2X PT DECK
FRAMING
1"
PT TIMBER POST
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:4
:0
P M
SECTION DETAILSA351
C.BAXTER
J.RYAN
J.MORGAN
13 15
REPLACE WASTEWATER TREATMENT PLANT XX
XXXXXX
DRTO 196743B
DRY TORTUGAS NATIONAL PARK07/23/2025
SCALE
1 0 1 2
SCALE OF FEET
A
SCALE AA351
1 SINK MILLWORK SECTION
SCALE AA351
2 TYPICAL MILLWORK SECTION
SCALE BA351
3 BUILT-IN SHELVING DETAIL
SCALE BA351
4 BUILT-IN COUNTER DETAIL SCALE
SCALE OF FEET
2 0 2 4 B
NOT TO SCALEA351
5 RAILING DETAIL
NEW 120/208 STAINLESS STEEL PANEL
"W" INSIDE A NEW POLYCARBONATE
WEATHERPROOF BOX.
NEW WASTE WATER TREATMENT
CONTROL PANEL (INSIDE A NEW
POLYCARBONATE
WEATHERPROOF BOX).
NEW 15 KVA TRANSFORMER "TW-1"
NEW 100A LOAD CENTER "W-1"
STAINLESS STEEL PANEL INSIDE A
POLYCARBONATE WEATHERPROOF
BOX. SEE E201 FOR MORE DETAILS.
NEW DOSING CONTROL PANEL INSIDE
A NEW POLYCARBONATE
WEATHERPROOF BOX. REPLACE ONE
FOR ONE WITH NEW CONTROL PANEL.
ORENCO TANK PUMPS.
SEE CIVIL DRAWINGS.
WASTEWATER
TREATMENT PLANT.
SEE CIVIL DRAWINGS.
NEW PLATFORM. SEE
ARCH DRAWINGS.
NEW WASTE WATER TREATMENT
CONTROL PANEL INSIDE A NEW
POLYCARBONATE
WEATHERPROOF BOX.3
A. DO NOT SCALE DRAWINGS. USE DIMENSIONS ONLY.
B. DIMENSIONS ARE TO FACE OF STUD OR MASONRY U.N.O.
C. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS
AND NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF
DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
D. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL BE MADE
FROM THE DRAWINGS WITHOUT FIRST SECURING WRITTEN
PERMISSION FROM THE CONTRACTING OFFICER.
E. REQUEST WRITTEN INTERPRETATION FROM THE CONTRACTING
OFFICER FOR ANY LACK OF OR AMBIGUITY OF INFORMATION IN THE
DRAWINGS PRIOR TO PROCEEDING WITH THAT PORTION OF THE
WORK.
F. GENERAL CONTRACTOR TO COORDINATE WITH PARK AND THE CO
ON FINAL MATERIAL FINISHES PRIOR TO ORDERING.
G. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
GENERAL NOTES:
WASTE WATER
TREATMENT
CONTROL
PANEL
NEW
DOSING
TANK
PUMPS
CONTROL
FROM EXISTING ELECTRICAL INFRASTRUCTURE.
WASTE WATER TREATMENT AREA
LIFT STATION 1 E/ONE SENTRY ALARM PANEL MOUNTED ON
STAINLESS STEEL UNISTRUT 12" ABOVE FINISHED GRADE.
LIFT STATION 2 E/ONE SENTRY
ALARM PANEL. MOUNTED ON
STAINLESS STEEL UNISTRUT
12" ABOVE FINISHED GRADE.
PROVIDE AND INSTALL NEW NEMA 3R JUNCTION
BOX MOUNTED ON STAINLESS STEEL UNISTRUT 12"
ABOVE FINISHED GRADE FOR DOSING TANK PUMPS.
20-3
20-2
20-2
EXIST
1. REFER TO ARCHITECTURAL SITE PLAN ON AS101 FOR EXACT
LOCATIONS OF LIFT STATIONS 1, 2, AND DOSING TANK.
2. REFER TO ELECTRICAL SCHEDULES AND DETAILS ON E201
FOR LIFT STATION ALARM PANEL WIRING DIAGRAM.
3. DASHED LINES INDICATE CONDUIT TO BE ROUTED
UNDERGROUND. UNDERGROUND CONDUIT TO BE ROUTED A
MINIMUM OF 18" BELOW GRADE.
TRANSFORMER
"TW-1"
208V - 240/120V 1Ø, 3W 15 kVA
EXISTING
PANEL
"W"
200A MCB
208/120V 1Ø, 3W
NEW
PANEL
"W-1"
80A MCB
208/120V 1Ø, 3W
TO WASTE WATER
TREATMENT PUMPS.
GENERAL RISER NOTES:
CONNECT TO EXISTING
GROUNDING SYSTEM.20-3
PROVIDE EXTRA 3/4" CONDUIT WITH PULL STRING
FOR DOSING TANK PUMPS CONTROL WIRE.
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:4
:0
P M
ELECTRICAL PLAN AND
RISERE101
J.SERRADAS
T.PAYNE
R.RAHN
14 15
REPLACE WASTEWATER TREATMENT PLANT XX
XXXXXX
DRTO 196743B
DRY TORTUGAS NATIONAL PARK07/23/2025
SCALE OF FEET
2 0 2 4
B L D
G
E101
1 ELECTRICAL PLAN
ELECTRICAL PLAN SHEET NOTES
TAG # TAG DESCRIPTION
1 MOUNT TRANSFORMER "TW-1" ONTO NEW STAINLESS STEEL
UNISTRUT ON BRICK WALL.
2 MOUNT LOADCENTER "W-1" ONTO EXISTING STAINLESS STEEL
UNISTRUT.
3 NEW WASTE WATER TREATMENT CONTROL PANEL. TO BE
INSTALLED INSIDE POLY NEMA 3R ENCLOSURE.
4 REPLACE DOSING CONTROL PANEL ONE FOR ONE WITH NEW
CONTROL PANEL.
CONDUCTOR SCHEDULE
MARK CAPACITY SETS PHASE/WIRE WIRE EQUIP GND CONDUIT
20-2 20 AMP 2 1 PHASE/2 WIRE (2)#12 (1)#12 3/4"
20-3 20 AMP 2 1 PHASE/3 WIRE (3)#12 (1)#12 3/4"
30 30 AMP 1 1 PHASE/3 WIRE (3)#10 (1)#10 3/4"
80 80 AMP 1 1 PHASE/3 WIRE (3)#3 (1)#8 1-1/4"
100 100 AMP 1 1 PHASE/3 WIRE (3)#1 (1)#8 1-1/4"
EXIST EXISTING - 1 PHASE/3 WIRE EXISTING EXISTING EXISTING
NOT TO SCALEE101
2 ELECTRICAL RISER
07/23/2025
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
TITLE OF PROJECT
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:4
:0
P M
SCHEDULES AND DETAILSE201
J.SERRADAS
T.PAYNE
R.RAHN
15 15
REPLACE WASTEWATER TREATMENT PLANT XX
XXXXXX
DRTO 196743B
DRY TORTUGAS NATIONAL PARK07/23/2025
VOLTAGE: 208/120 1 Ph 3 Wire MAIN: MCB MOUNTING: REMARKS:
BUS SIZE: TOTAL LOAD: KVA FAULT DUTY: Existing Loads are Estimations
DESCRIPTION
LTG REC MTR A/C HTG MISC KIT A B KIT MISC HTG A/C MTR REC LTG
DESCRIPTION
1 UNKNOWN (NOTE 5) 0.7 1.4 20/1 0.7 UNKNOWN (NOTE 5) 2
3 " 0.7 0.7 SPARE (NEW) 4
5 MAIN BLOWER 2.9 2.9 " 6
7 " 2.9 4.3 1.4 EXHAUST FAN 8
9 SPARE 20/1 1.4 1.4 " 10
11 SPARE 20/1 0.0 20/1 SPARE 12
13 FIRE/STAT LTG 0.4 0.4 20/1 2.2 20/1 1.4 AN MIXER 14
15 TESTING BLOCK 1.8 1.8 20/1 SPARE 16
17 " 1.8 1.8 20/1 SPARE 18
19 CHARG STATION #1 1.8 30/1 3.6 30/1 1.8 CHARG STATION #2 20
21 HIGH SPD BLOWER 2.2 2.2 SPACE 22
23 " 2.2 2.2 SPACE 24
25 SPACE 0.0 SPACE 26
27 SPACE 0.0 SPACE 28
29 SPACE 0.0 SPACE 30
31 SPACE 0.0 SPACE 32
33 SPACE 0.0 SPACE 34
35 SPACE 0.0 SPACE 36
37 SPACE 0.0 SPACE 38
39 SPACE 7.8 7.8 PANEL W-1 (NEW) 40
41 SPACE 7.8 7.8 " 42
TOTAL KVA 0.4 0.0 10.2 0.0 0.0 7.2 0.0 11.9 12.6 0.0 18.1 0.0 0.0 4.2 0.0 0.0 TOTAL KVA
AMPERES/PHASE 57.1 60.7 AMPERES/PHASE
T Lighting: 0.4
O Receptacles: 0.0 1)
T Motors: 14.4 2)
A Largest Motor: 0.0 3)
L A/C: 0.0 4)
S Heating: 0.0 5)
Miscellaneous: 25.3 6)
Kitchen: 0.0 7)
Not Used. -- 8)
Not Used. -- 9)
TOTAL KVA 40.1 CODE KVA 10)
TOTAL AMPS 192.8 CODE AMPS 11)
20/2
40/2
30/2
30/2
20/2
20/2
PANELBOARD "W" SCHEDULE (NEW)
200 A SURFACE
40.1 UNKNOWN
CKT
NO
LOAD (kVA)
BKR
PHASE
BKR
LOAD (kVA)
225 A
CKT
NO
X 125%= 0.5 NOTES:
NEC220.44
100/2
0.0 Circuit breaker to have lockable device.
NEC220.18(A) 14.4 Circuit breaker to be "HACR" type.
NEC430.24 0.0 Circuit breaker to be shunt trip.
X 100%= 0.0 Circuit breaker shall be a GFI type.
X 100%= 0.0 Existing circuit to be fed from new panel (unknown what is fed). Field verify load source to document on final panel schedule.
X 100%= 25.3 Not used.
NEC220.56 0.0 Not Used
Not Used. -- Not Used
Not Used. -- Not Used
40.2 Not Used
193.3 Not Used
07/23/2025
| DRTO 196743B CS - COVER SHEET |
| G101 - GENERAL INFORMATION AND INDEX OF DRAWINGS |
| AS101 - ARCHITECTURAL SITE PLAN |
| C1 - SYSTEM PLAN WASTEWATER COLLECTION |
| C2 - DEMOLITION PLAN WASTEWATER COLLECTION |
| C3 - PLAN & PROFILE COLLECTION SYSTEM |
| C4 - PLANT LAYOUT WASTEWATER TREATMENT |
| C5 - DETAILS |
| C6 - FLOW DIAGRAM TREATMENT PLANT |
| AD101 - DEMOLITION FLOOR PLAN |
| A101 - FLOOR PLAN |
| A201 - ELEVATIONS |
| A351 - SECTION DETAILS |
| E101 - ELECTRICAL PLAN AND RISER |
| E201 - SCHEDULES AND DETAILS |