This document provides clarifications and answers to questions for a solicitation to perform maintenance on four restrooms and a law enforcement dispatch space in Everglades National Park. The work includes relocating the dispatch center temporarily during renovations, with the contractor to provide the exact start date. A mobile air-conditioned restroom trailer with separate men's and women's facilities must be located in the parking lot and available before existing restrooms are closed. All work at the Coe Visitor Center restroom is to occur through the rear exit to minimize disruptions. The electrical chase will be reduced from six to four inches to allow for a hallway expansion, requiring an eight hour power outage to the entire visitor center during normal work hours and its closure for the day. A bulkhead must be left where a wall is relocated. The ceiling at the Coe restroom will be solid drywall rather than dropped.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5422R0020_Amd_0002.pdf | ||
| A04_PI_Restrooms_HQ_VC_SOW_0001.pdf | ||
| A06_PI_Restrooms_HQ_VC_09_CD_220111_Final_Issue_0001.pdf | ||
| Sol_140P5422R0020_Amd_0001.pdf | ||
| B09_QUESTIONNAIRE.pdf | ||
| Sol_140P5422R0020.pdf | ||
| B03_SOL_WAGE_RATES.pdf | ||
| A04_PI_Restrooms_HQ_VC_P_Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clarifications for Bidders
1. Each bidder shall provide a detailed description on how they will approach the renovation work in the Dispatch Center and a precise schedule for that work. The
Dispatch Center is a 24/7 emergency operation center that will be relocated temporarily during the work. Once the Contract is awarded the Contractor shall also provide an exact start date for the Dispatch Center work so that law enforcement can plan on their temporary relocation.
2. Temporary employee restrooms shall be provided by the Contractor during the work. The restrooms shall be a mobile air-conditioned trailer with 2-4 men and women's rooms and be located in the parking lot at the rear of the headquarters building. The Contractor shall provide a line item cost for this trailer, and shall have the trailer on site prior to the cut off of the restrooms to be renovated.
3. All work activities at the Coe Visitor Center restroom will be through the exit at the rear of the building at the employee restroom area to minimize disruption to the visitor center operations.
4. The 6" electrical chase at the Coe Visitor Center restroom area shall be changed to a 4" chase to allow for the 36" ABA hallway expansion. This work will cut off power to the entire visitor center and is expected to take eight hours. Work will take place during normal working hours. The Visitor Center shall be closed the day of the work. The
Contractor shall provide adequate notice to the Park on when they will schedule this work.
5. The ceiling conditions are different on each side of the wall that will be relocated in the hallway adjacent to the restrooms. The Contractor shall leave a bulkhead at that location to provide a transition between the two ceiling types.
6. The ceiling at the Coe VC restroom shall be a solid drywall ceiling not a dropped ceiling.
Questions/ Answers
1) Where will the Temporary Bathrooms be Located on Site , and how many people does it need to support ?
At the parking lot at the rear of the building. We should plan on 4 people minimum.
2) Where will the Temporary Dispatch Trailer be located and likewise how many people will work from this trailer ?
Dispatch will move to another area of the building. The Contractor will not need to provide this service.
3) Where will the Water source and Electric power source be for these two Trailers ?
The headquarters building.
4) Is the paint that is called out in the plans available from a local distributor ?
Unknown.
5) Is the Flooring called out in the plans available locally as well ?
Unknown.