Atch_1_to_Amd_1_140P5422R0008_0001.pdf

PDF 157 KB Posted

Attached to
Resurface Asphalt Parking Lot-CASA
Solicitation number
140P5422R0008
Issued by

View the file

Other files

File Type Posted
Atch_1_to_Amd_2-Updated_SOW_0002.pdf PDF
Sol_140P5422R0008_Amd_0002.pdf PDF
Sol_140P5422R0008_Amd_0001.pdf PDF
Entire_RFP_w_Atchs-140P5422R0008.pdf PDF
Atch_3-Site_Visit_Info.pdf PDF
Sol_140P5422R0008.pdf PDF
Atch_4-Perf_Questionnaire.pdf PDF
Atch_5-Drawings.pdf PDF
Atch_2-St_John_DBA_WD.pdf PDF
Atch_1-SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P5422R0008 Amendment 1 Attachment 1

Page 1 of 2 Pages

Question #1: Attachment 1, SOW Item 1-7 Reference Standards, D states that contractors are to use Temporary Traffic Control Devices (TTC) in accordance with the Manual on Uniform Traffic Control Devices (MUTCD). During the site investigation, it was noted that the Castillo de San Marcos National Monument Administration and Facility Operations Building would most likely be fully operational during the demolition and the resurfacing operations, requiring the contractor to split their work into multiple phases. Will a required percentage of the parking lot, and/or specific amount of parking spaces, be required to remain open at all times during this project? If so, what percentage?

Answer: Requesting (2) spaces available for deliveries.

Question #2: Attachment 1, SOW Item #10 states that the new striping for both the parking and handicap spaces is to be consistent with the existing and follow ABA Section 208 standards. Will the new striping also be required to have reflective material?

Answer: Yes

Question #3: Are the existing painted curbs to be prepped and be repainted?

Answer: Yes

Question #4: Are there any other curbs or ramps in the maintenance area which are not currently painted/marked, but will require marking paint and striping as part of this contract? If so what specific area?

Answer: Rear Parking Areas

Question # 5: Markings are shown on the provided drawings but were not visible on the parking lot during our recent site visit. Besides the ADA Marking Symbols and Accessibility Parking Space Symbol, will there be any Directional or Word Marking Symbols required?

Answer: No other symbols required. Just one ADA Marking Symbol

Question #6: Currently, tree roots and landscaping growth are preventing proper drainage, and causing current ponding issues, in many areas of the parking lot. Under this contract, is the offeror responsible for storm water runoff /drainage in the parking lot area that is currently pitched in the direction of the fort?

Answer: The two spaces that are mentioned, pitch needs to be slightly sloped towards the grass area.

Question #7: The 1442 lists Line Item 00010 as “Resurface Parking Lot per attached,” and Line Item 00020 as “Additive: Resurface Employee Lot, Rte. 0904 OPTIONAL.” Solicitation page 6 of 31, Section B – Supplies or Services and Price Cost, lists Line Item 0010 as “Replace Floating Dock,” and Line Item 0020 as “Resurface Employee Lot. Rte. 0904 (Optional).” If the offeror is to use Section B to list our prices, please confirm; also please confirm that the line items are as listed on the 1442.

Answer: That is a typo. That should have read as shown below. Simply put your pricing on the SF 1442

140P5422R0008 Amendment 1 Attachment 1

Page 2 of 2 Pages

Question #8: Is there more than the one area requiring installation of a Detectable Warning Surface?

Answer: No. Just at entrance as stated.

Question #9: Will the existing maintenance material, equipment storage racks, vehicles etc. be removed and replaced by others?

Answer: Vehicles, material, etc will be removed prior to project commencement.

Question # 10: There is existing overgrowth on the edges of all the South-Southeast perimeters wherever curbs are absent. Will the overgrowth be removed by others prior to the work under this contract, or should the offeror include this activity in our pricing?

Answer: We will remove the overgrowth due to monitoring grounds removal.

Question #11: Please clarify the exact delineation or termination point of the property line located at the rear exit gate. Will this be clearly marked by the National Park Service or by others, prior to the contractor starting their work?

Answer: Please see photo below. We will mark the line as well.