This document is a Questions and Answers (Q&A) file for an HVAC replacement project at multiple locations within a park or facility. The key details include HVAC specifications across four different sites: East Rim FM Shop, Resource Management Facility, Tennessee Log Dormitory, and Tennessee Fire Cache. Consistent requirements across all sites include a minimum 15 SEER rating for new units and specific guidance on equipment sizing, with most sites requiring replacement of existing units with equivalent or similar tonnage systems (3.5-ton, 2-ton, 4-ton). Additional site-specific requirements involve ductwork replacement, line set installations, and concrete pad considerations, such as reusing existing pads or installing new ones. The document provides detailed clarifications on equipment replacement, emphasizing like-for-like replacements and specifying which components can be reused, cleaned, or must be replaced.

View the file

Other files

File Type Posted
Sol_140P5325R0023_Amd_0001.pdf PDF
B03_Wage_Rate_Determination.pdf PDF
Sol_140P5325R0023.pdf PDF
B04_Past_Performance_Questionnaire.pdf PDF
Construction_Contract_Administration.docx DOCX document
A04_SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

1. HVAC sizes and Seer rating on all units?

The park would like to see a minimum of 15 SEER rating for all new units

2. East Rim FM (Facility Management) Shop

The new unit at the East Rim shall be 3.5 tons.

3. RM (Resource Management)

Replace the old pad for the 4-ton unit Seal all duct seams completely on all sides to prevent rodent issues in accordance with SOW Water Treatment Area Modify returns size to a 20” return.

4. TN Fire Cache

The existing line set is run inside the exterior wall. Replacement will require an exterior line set and cover system installed. The park finds this acceptable.

5. TN Log Dorm

This site will require replacement of the existing ductwork. The park will retain filter boxes, registers, and vents. The contractor shall replace the existing main trunk and all flex lines to the registers/vents.

East Rim Shop:

SEER specification of new unit(s) – MINIMUM 15 SEER 3.5ton system currently in use, solicitation calls for a new 5 ton system to be installed. Please clarify – REPLACE IN KIND WITH 3.5 TON UNIT Can the existing concrete pad be reused? If not, please specify: concrete, fiberglass, plastic. – MAY REUSE THE PAD

Tennessee Log Dormitory:

Please specify what parts can be reused and or cleaned and what parts must be replaced on new ductwork.- CLEAN THE REGISTERS, FLOOR VENTS, RETURNS, REPLACE THE MAIN TRUNK AND FLEX.

Can the existing concrete pad be reused? If not, please specify: concrete, fiberglass, plastic. – MAY BE REUSED

SEER specifications of new unit(s) – MINIMUM 15 SEER

Resource Management Facility:

Please specify new pads to be installed: concrete, fiberglass, plastic. – REPLACE PAD

ON 4 TON UNIT WITH IN KIND CONCRETE PAD

2 ton system currently in use, solicitation calls for a 3 ton system to be installed. Please clarify – REPLACE IN KIND WITH 2 TON UNIT

SEER specifications of new unit(s) – MINIMUM 15 SEER

Tennessee Fire Cache

SEER Specifications of new unit(s) – MINIMUM 15 SEER Can existing pads be reused? If not, please specify: concrete, fiberglass, plastic. – MAT

REUSE PADS

Can new line sets be run and covered on the exterior wall? – DUE TO PREVIOUS

CONSTRUCTION NEW LINE SETS MUST BE RAN OUTSIDE EXTERIOR WALL