This document is a Site Visit Sign-in and Questions and Answers form for solicitation 140P5325Q0029, which involves replacing septic systems at Cape Hatteras National Seashore. The document records a site visit by Doug Tillet from Coastal Septic Company LLC, representing prime contractor VORTEX, and includes two key clarifications from the site visit. The first clarification confirms that the park wants septic pipe, not septic chambers, and the second confirms that new sod (approximately 500 sqft) will be required in disturbed areas after work completion.
The document emphasizes that the project site is sensitive and requires 48-hour advance approval for site visits, and is not open to the public. These procedural details align with the broader solicitation requirements for this small business set-aside construction project involving replacement of septic systems at four housing units and the Double Keepers Quarters in Buxton, NC, with a period of performance from August 1, 2025 to December 1, 2025.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site visit Sign-in and Questions and Answers
140P5325Q0029
CAHA - Replace Septic at 326, 390, 391 and Replace DKQ Septic
Site visit attendance:
DOUG TILLET - Coastal Septic Company LLC - Representing a prime contractor - VORTEX - 252- 207-1785
This project is in a sensitive location and all site visits must be organized and approved with 48 hour’s notice, do not go on-site without approval. This site is NOT open to the public.
1. Question: Does the park want pipe or chambers? Both types are mentioned in unison.
A. Answer: The park wants septic pipe, (See section 4 Item 12) Septic chambers were accidentally mentioned only one time in the required submittals section.
2. Question: Does the park want new sod after the work is complete? The existing grass is recently established.
A. Answer: Yes, new sod will be needed to the disturbed areas - approximately 500 sqft as per the Scope of Work. (Section 4 Item 13)