Q&A 140P5322R0022
1. Is it permissible to chip brush and disperse the wood chips on site?
YES, it is permissible to chip smaller brush and trees under 3-inch DBH. All piles of chips will be less than 2-inches in depth. All piles of chips will be spread by the contractor as part of the project cost.
2. Does all cut vegetation need to be removed or just the material from the listed trees? (Can small material be left on site to decompose?)
As part of question #1, all vegetation DOES NOT need to be removed, but can be chipped.
Yes, all trees larger than 3-inch DBH will need to be removed.