A10_-_Additional_details_Bid_Base_-_3A_0003.pdf

PDF 1 MB Posted

Attached to
BLRI REMOVAL OF VEG UNDER BRIDGES-VA
Solicitation number
140P5322R0022
Issued by

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE LIST - Base Bid

Bridge/Overpass Number - Mile Post - Name 2 - 6" dbh

Brush / Vines

N End Between

Abutments S End Acre

Total Sq Yd

Total Sq Ft

NOTES

039P - MP 124.0 - VA 615 - N&W RR - Bridge

- Heavy 1,400 3,000 1,400 0.13 644 5,800

Pull trees and shrubs off into the woods.

Remove all cleared vegetation between Rail

Road Tracks and Starlight Lane.

039P - MP 124.0 - VA 615 - Starlight Lane - Bridge

- Heavy 1,400 3,000 1,400 0.13 644 5,800 Pull trees and shrubs off into the woods.

040P - MP 124.36 - Back Creek & Merriman Road Overpass

- Medium 1,800 10,500 1,800 0.32 1,567 14,100 Pull trees and shrubs off into the woods.

041P - MP 126.02 - VA 688 - Cotton Hill Road Overpass

4-NW, 4-SE Medium 450 450 0.02 100 900 Pull trees and shrubs off into the woods.

042P - MP 127.62 - VA 691 - Dawnwood Road Overpass

- Heavy 450 450 0.02 100 900 Pull trees and shrubs off into the woods.

044P - MP 128.83 - VA602 - Poage Valley Road - Bridge

- Heavy 900 19,085 900 0.48 2,321 20,885 Pull trees and shrubs off into the woods.

047P - MP 129.6 - Ravine - Bridge 1-West Light 450 450 0.02 100 900 Keep depth of debris to a minimum of 3" deep.

045P - MP 131.0 - VA 690 - Sugar Camp Creek Road Overpass

- Light 450 450 0.02 100 900 Keep depth of debris to a minimum of 3" deep.

MP 138.4 - Sweet Annie Gap Bridge 15-East, 15- West

Medium 450 450 0.02 100 900 Pull trees and shrubs off into the woods.

052P - MP 165.27 - VA 8 - Parkway Lane South Overpass

4-SW Light 2,250 2,250 0.10 500 4,500 Cleared trees, and shrubs will be removed

055P - MP 177.46 - Meadows of Dan By-Pass - Bridge #1

4-NW, 2-NE Heavy 2,250 2,250 0.10 500 4,500 Pull trees and shrubs off into the woods.

055P - MP 177.46 - Meadows of Dan By-Pass - Bridge #2

8-SW, 10-SE Heavy 2,250 2,250 0.10 500 4,500 Pull trees and shrubs off into the woods.

055P - MP 177.7 - US 58 Bridge 2-NE, 3-SW, 2-

NW

Medium 1,300 1,300 0.06 289 2,600 Cleared trees, and shrubs will be removed

056P - MP 179.27 - Round Meadow Creek - Bridge

6-NW, 8-NE,

20-SE, 8-SW

Heavy 1,800 20,625 1,800 0.56 2,692 24,225 Cleared trees, and shrubs will be removed

063P - MP 196.6 - VA 682 - South Winchester Road - Bridge

6-NW Medium 2,250 4,400 2,250 0.20 989 8,900 Pull trees and shrubs off into the woods.

064P - MP 199.5 - US 52 - Fancy Gap Highway Overpass

1-SW, 3-NW Light 2,250 2,250 0.10 500 4,500 Cleared trees, and shrubs will be removed

MP 213.12 - Stream Before Peaks Mountain Road - south of the Blue Ridge Music Center

4-West Heavy 900 900 0.04 200 1,800 Pull trees and shrubs off into the woods. No cleared debris to be left in the stream bed.

070P - MP 215.85 - VA 89 - Skyline Highway - Overpass

6-SW, 1-NE, 6-

SE

Heavy 3200 3,200 0.09 440 3,960 Cleared trees, and shrubs will be removed

MP 216 RT 89 south end on Parkway Right north and south end Parkway left - Overpass

- Light 1000 1,000 0.05 222 2,000 Cleared trees, and shrubs will be removed

Estimated Tree Count and Brush density

Est Cutting Areas, Sq Ft Total Sq Ft

PLATEAU DISTRICT - VIRGINIA

BRIDGE LIST - Bid Option 1

Bridge/Underpass/Overpass Number - Mile Post - Name

2 - 6" dbh

Brush / Vines

N End Between

Abutments S End Acre

Total Sq Yd

Total Sq Ft

NOTES

022P - MP 105.80 - US 460/US-221 N Hwy - Underpass

30-NE

Heavy-

NE

4500 4500 0.03 133 1200

Cleared trees, and shrubs will be removed

023P - MP 107.40 - Webster Road & Davis Road (Glade Bridge) - Bridge, VA 738 & 636

30-NE, 10-SE Medium 1,800 23,250 1,800 0.62 2,983 26,850 Cleared trees, and shrubs will be removed 026P - MP 112.21 - VA 24 - Washington Road Overpass

- Medium 1,125 1,125 0.05 250 2,250 Keep depth of debris to a minimum of 3" deep.

027P - MP 113.55 - VA 634 - Hardy Road Overpass

- Medium 2,250 2,250 0.04 200 1,800 Keep depth of debris to a minimum of 3" deep.

028P - MP 114.67 - Roanoke River Bridge 10-W, 10-E Heavy 1,800 60,000 1,800 1.46 7,067 63,600 Pull trees and shrubs off into the woods. No cleared debris to be left in the stream bed.

199P - MP 115.22 - Br 1 on Roanoke River Pkwy Road - Bridge 14-N, 5-S Light 1,600 5,920 1,600 0.21 1,013 9,120

Pull trees and shrubs off into the woods. No cleared debris to be left in the stream bed.

200P - MP 115.22 - Br 2 on Roanoke River Pkwy Road - Bridge 20+-N, 10-S Heavy 2,400 44,400 2,400 1.13 5,467 49,200

Pull trees and shrubs off into the woods. No cleared debris to be left in the stream bed.

031P - MP 116.93 - VA 617 - Pitzer Road - Underpass 1-SW Medium 850 850 0.04 211 1,900

Pull trees and shrubs off into the woods.

032P - MP 117.66 - VA 116 - Jae Valley Road Overpass

- Medium 1,350 1,350 0.06 300 2,700 Keep depth of debris to a minimum of 3" deep.

033P - MP 118.42 - VA 666 - Bandy Road - Underpass

3-NW, 4-NE Medium 2,250 2,250 0.10 500 4,500 Pull trees and shrubs off into the woods.

034P - MP 119.24 - VA 668 - Yellow Mountain Road - Overpass

- Heavy 2,250 2,250 0.10 500 4,500 Keep depth of debris to a minimum of 3" deep.

035P - MP 120.45 - (1.7 miles on Spur Rd) - VA 672 - Mill Mountain Pkwy - Overpass 5-E, 2-W Light 900 4,400 900 0.14 689 6,200

Pull trees and shrubs off into the woods.

035P - MP 120.45 - (0.4 miles on Spur Rd) - Welcome Valley Road on Mill Mountain Pkwy - Overpass

- Light 900 2,750 900 0.10 506 4,550 Keep depth of debris to a minimum of 3" deep.

037P - MP 121.2 - VA 220 - Franklin Road - Bridge

5-NE, 1 SE, 3-

NW, 4-SW

Heavy 1,800 6,750 1,800 0.05 222 10,350 Pull trees and shrubs off into the woods.

038P - MP 122.43 - VA 679 - Buck Mountain Road Overpass

1-SW, 1-NW,

1-NE, 1-SE

Heavy 1,350 1,350 0.06 300 2,700 Pull trees and shrubs off into the woods.

Estimated Tree Count and Brush density

BRIDGE LIST - Bid Option 2

Box Culvert Number - Mile Post - Name 2 - 6" dbh

Brush / Vines

N End Between

Abutments S End Acre

Total Sq Yd

Total Sq Ft

NOTES

024P - MP 108.30 - VA 604 - Glade Creek Road - Box Culvert

- Heavy 450 450 0.02 100 900 Keep depth of debris to a minimum of 3" deep.

025P - MP 111.4 - VA 651- Mountain View Road - Box Culvert

- Heavy 450 450 0.02 100 900 Keep depth of debris to a minimum of 3" deep.

Off MP 115.22 - Box Culvert Over Trail 20-N, 8-S Low 100 100 0.0005 22 200 Keep depth of debris to a minimum of 3" deep.

029P - MP 115.32 - VA 618 Highland Road - Box Culvert

3-SW, 2-NW Light 450 450 0.02 100 900 Keep depth of debris to a minimum of 3" deep.

030P - MP 116.33 - Rutrough Road - Box Culvert

- Heavy 450 450 0.02 100 900 Keep depth of debris to a minimum of 3" deep.

MP 136.0 Clover Hill Road - Box Culvert 2-SW, 1-NE Heavy 500 500 0.02 111 1,000 Keep depth of debris to a minimum of 3" deep.

MP 183.98 - Box Culvert - Low 100 100 0.0005 22 200 Keep depth of debris to a minimum of 3" deep.

059P - MP 185.02 - VA 638 - Bell Spur Road - Box Culvert

- Low 450 450 0.02 100 900 Keep depth of debris to a minimum of 3" deep.

060P - MP 188.25 - Pilot View Drive #1 - Box Culvert

- Low 450 450 0.02 100 900 Keep depth of debris to a minimum of 3" deep.

060P - MP 188.95 - Renfro Ridge - Box Culvert - Low 450 450 0.02 100 900 Keep depth of debris to a minimum of 3" deep.

062P - MP 195.3 - VA 608 - Lightning Ridge Road - Box Culvert

1-SE Medium 450 450 0.02 100 900 Keep depth of debris to a minimum of 3" deep.

MP 206.1 Pipers Gap Rd (Lambsburg Road) - Box Culvert

- Light 900 900 0.04 200 1,800 Keep depth of debris to a minimum of 3" deep.

MP 212.1 north of the Blue Ridge Music Center - Box Culvert

4-West Heavy 900 900 0.04 200 1,800 Keep depth of debris to a minimum of 3" deep.

Estimated Tree Count and Brush density

BRIDGE LIST - Bid Option 3

Culvert Number - Mile Post - Name 2 - 6" dbh

Brush / Vines

N End Between

Abutments S End Acre

Total Sq Yd

Total Sq Ft

NOTES

022P - MP 105.80 - Culvert 3-W, 4-W Medium 350 250 0.02 67 600 Keep depth of debris to a minimum of 3" deep.

048P - MP 150.56 - Paynes Creek Culvert Medium 540 540 0.02 120 1,080 Keep depth of debris to a minimum of 3" deep.

049P - MP 155.90 - Meadow Creek Culvert 2-SE, 1-NE Medium 800 800 0.40 178 1,600 Keep depth of debris to a minimum of 3" deep.

MP 159.70 - Culvert - Medium 800 800 0.40 178 1,600 Keep depth of debris to a minimum of 3" deep.

MP 163.70 - Culvert - Medium 100 100 0.0005 22 200 Keep depth of debris to a minimum of 3" deep.

MP 164.0 - Culvert - Light 60 60 0.0002 13 120 Keep depth of debris to a minimum of 3" deep.

054P - MP 174.28 - Laural Fork Culvert 2-NW Light 600 600 0.03 133 1,200 Keep depth of debris to a minimum of 3" deep.

MP 175.8 - Culvert 4-West Heavy 300 300 0.01 67 600 Keep depth of debris to a minimum of 3" deep.

MP 179.2 - Culvert - Heavy 100 100 0.0005 22 200 Keep depth of debris to a minimum of 3" deep.

057P - MP 180.7 - Mabry Creek Culvert 3-West, 2- East

Heavy 450 450 0.02 100 900 Keep depth of debris to a minimum of 3" deep.

MP 187.55 - Culvert - Low 100 100 0.0005 22 200 Keep depth of debris to a minimum of 3" deep.

MP 209.78 Culvert - Medium 100 100 0.0005 22 200 Keep depth of debris to a minimum of 3" deep.

MP 211.50 Culvert 1-NE Medium 650 650 0.02 144 1,300 Keep depth of debris to a minimum of 3" deep.

MP 215.32 Culvert - Medium 400 400 0.02 89 800 Keep depth of debris to a minimum of 3" deep.

MP 216.11 Culvert 1-SW Heavy 800 800 0.40 178 1,600 Keep depth of debris to a minimum of 3" deep.

MP 216.22 Culvert 1-SE Medium 800 800 0.40 178 1,600 Keep depth of debris to a minimum of 3" deep.

MP 216.4 Retaining Wall - Medium 3200 0 0.07 356 3,200 Keep depth of debris to a minimum of 3" deep.

Estimated Tree Count and Brush density

Bridge Matrix_Base-Bid A Options
Bridge Matrix_Bid Option 1A
Bridge Matrix_Bid Option 2A
Bridge Matrix_Bid Option 3A

File details come from the government source that posted it. Updated .