REPAVE PRICE PARK CG, BLUE RIDGE PARKWAY
Solicitation number
140P5318R0009
Issued by

About this file

140P5318R0009

View the file

Other files

File Type Posted
Sol_140P5318R0009_Amd_0002.pdf PDF
Attachment_2_REVISED_Plans.pdf PDF
Attachment_1_REVISED_SOW.pdf PDF
Attachment_4_REVISED_Price_Schedule.pdf PDF
Instruction_to_Offerors_140P5318R0009.docx DOCX document
Attachment_2_PLANS.pdf PDF
Attachment_1_SOW.pdf PDF
Attachment_3_Wage_Rates.pdf PDF
Sol_140P5318R0009.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P5318R0009 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

SN2

Asheville NC 28803 199 Hemphill Knob Road DOI, NPS, SER - BLRI Admin. Office

PSN

Gatlinburg TN 37738 107 Park Headquarters Road NPS, SER - North MABO

06/13/20180001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/13/2018

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of amendment #001 to solicitation 140P5318R0009 to repair and repave the Julian

Price Park Campground Loops B thru F at the Blue Ridge Parkway, North Carolina is to provide responses to Questions received.

OFFERS DUE: Monday July 23, 2018 NLT 4:00 pm EDT to Lara_Wood@nps.gov

1) QUESTION: Will the government be removing any vegetation?

ANSWER: No. Contractor will be responsible for any vegetation removal. Any vegetation needing to removed shall be marked and approved by the COR prior to removal.

2) QUESTION: Does the government have as-built drawings of the new construction around the

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Lara Wood

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P5318R0009/0001 restroom in Loop D and the area around where boulder placement will occur; showing utilities?

ANSWER: Yes. The government can provide as-builts as well as construction photos of the work in that area.

3) QUESTION: What dates will the campground be open? Closed?

ANSWER: The campground season is typically mid-May to the end of October. See SOW Section

1-5 A.2 for other work conditions and limitations. The intent was for this project to be performed from November to mid-May with temperature sensitive work being left for March to mid-May. Smaller, temperature sensitive work such as stone masonry headwalls can be covered with insulated blankets to protect from freezing.

These types of work could be performed in winter.

4) QUESTION: Can equipment/materials be left on-site over weekends?

ANSWER: While the campground is closed to visitors or while loops are closed to visitors, equipment and material can be stored over weekends. See SOW Section 1-5 A.2 for more information. All campground roads need to remain open to traffic at all times for emergency personnel. When the campground is open to visitors, the contractor will need to ensure equipment and material is not impact vehicular traffic and will be required to coordinate with the COR and consolidate equipment and material storage.

5) QUESTION: Is there a location within the campground where we can unload larger equipment & store any hauling equipment i.e. trailer or low-boy?

ANSWER: When the campground is closed to visitors, hauling equipment can be stored in the area of the dump station but keeping one lane completely passable. When the campground is open, hauling equipment will need to be stored in an area designated by the COR within Picnic Area which is less than 2 miles north on the Parkway.

6) QUESTION: Callout Number 1 calls for Loop B to receive full depth reclamation with cement prior to replacing cement. Per the typical section detail on sheet D2 the FDR with Cement

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P5318R0009/0001 shall be 6 inches. This process is typically used on large scale paving projects requiring special heavy equipment to perform this process as well as a large laydown area for staging and vehicles.

Would it be acceptable to stabilize the base an alternative way for loop B? We would like to propose removing the existing asphalt and sub-base, compacting the bedding, installing 6 or

8 inches of compacted crush and run, then installed the asphalt as noted in the initial scope.

ANSWER: The intent for the road work in Loop B is to recycle the existing material to re-stabilize the road base. This will greatly reduce the hauling of material on and off the Parkway. The anticipated side benefits are reducing the project schedule and project cost. Full depth reclamation is typically done on larger scale project e.g. most of the road projects on the mainline Parkway entail FDR. However, FDR is used in similar instances as called for on this project. Bidders shall expect to perform full depth reclamation as called for in the project documents.

7) QUESTION: When excavating for the widening and waterway scope tree roots will likely be damaged or required to be removed. Are they any special precautions that we will need to follow when a tree root is damaged or must be removed?

ANSWER: There are no special precautions. There are a few trees marked on the plans which are in proximity to excavation work. It is advised for the Contractor to evaluate the work areas and consult with the COR for other potential issues with large trees. Tree removal is not intended for this project. The plan would be to get NPS staff involved to perform this task. If significant roots are disturbed, the NPS will monitor the trees health.

This Acquisition is 100% set-aside for small business

All other terms and conditions remain unchanged

Period of Performance: 09/30/2018 to 04/30/2019