Attachment_1_REVISED_SOW.pdf

PDF 11 MB Posted

Attached to
REPAVE PRICE PARK CG, BLUE RIDGE PARKWAY
Solicitation number
140P5318R0009
Issued by

About this file

Attachment 1a Revised Statement of Work

View the file

Other files

File Type Posted
Sol_140P5318R0009_Amd_0002.pdf PDF
Attachment_2_REVISED_Plans.pdf PDF
Attachment_4_REVISED_Price_Schedule.pdf PDF
Sol_140P5318R0009_Amd_0001.pdf PDF
Instruction_to_Offerors_140P5318R0009.docx DOCX document
Attachment_2_PLANS.pdf PDF
Attachment_1_SOW.pdf PDF
Attachment_3_Wage_Rates.pdf PDF
Sol_140P5318R0009.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

August 06, 2018

STATEMENT OF WORK

REPAIR AND REPAVE PRICE PARK CAMPGROUND ROADS

Blue Ridge Parkway Watauga County, North Carolina

SOW Section Page

PART 1 – GENERAL

1‐1 DESCRIPTION OF WORK

1‐2 LOCATION AND ACCESS

1‐3 PROJECT PERSONNEL

1‐4 CONTRACTOR‐FURNISHED ITEMS

1‐5 WORK CONDITIONS AND LIMITATIONS

1‐6 QUALITY CONTROL

1‐7 REFERENCE STANDARDS

1‐8 SUBMITTALS AND PROCEDURES

PART 2 – WORK REQUIREMENTS

2‐1 GENERAL

2‐2 SITE SURVEYING AND CONSTRUCTION STAKING

2‐3 TRAFFIC CONTROL

2‐4 EXECUTION

2‐5 CLEAN UP

2‐6 CLOSEOUT

PART 3 – MEASUREMENT AND PAYMENT

3‐1 GENERAL

3‐2 MEASUREMENT

3‐3 PAYMENT

Statement of Work August 06, 2018 Repair and Repave Price Park Campground Roads Loops B thru F Blue Ridge Parkway

PART 1 – GENERAL

1‐1 DESCRIPTION OF WORK

A. Julian Price Campground is adjacent to Price Lake and is a top destination for boating, hiking, fishing and more. The surrounding forest offers hemlock, white pine, oak, hickory and birch trees, along with a colorful assortment of wildflowers in the spring and an array of vivid orange and red foliage displays in autumn. The Blue Ridge Parkway (Parkway) is a scenic byway that follows the high crests of the central and southern Appalachians for 469 miles from Shenandoah National Park in Virginia to the Great Smoky Mountains National Park in North Carolina.

Canoe rentals are available at Price Lake, and other types of non‐motorized boats are permitted.

Fishing is also available at the lake, with a dock provided. Price Lake Trail offers a refreshing hike around the edge of the water, and the Boone Fork, Green Knob and Tanawha Trails are just a few of the trails that are conveniently accessed through the campground. Wildlife viewing is also popular as campers have a good chance of spotting bears, grouse, turkeys, owls, hawks and more. Julian Price Campground combines the traditional great outdoors experience with the modern conveniences of flush toilets and drinking water. Both RV and tent sites are available and provided picnic areas are perfect for barbecues or late‐night marshmallow roasting. Blowing Rock, North Carolina, located just 20 minutes away on the Blue Ridge Parkway, offers fine dining, shopping and more.

B. This Statement of Work (SOW) consists of repairing and repaving asphalt pavement roads, replacing pipe culverts with associated features, asphalt pavement widening, deep asphalt patching and installing paved waterways in Julian Price Campground Loops B through F (MP 297.0) of the Blue Ridge Parkway. Campground lane width is typically 11 feet +/‐.

C. Refer to Bid Sheet for required work items.

D. All, some, or none of the optional work may be included in the project as authorized by the CO.

Refer to Bid Sheet for optional work items.

E. Attachments:

1. CM‐16 Transmittals Form (Submittals)

2. BLUE RIDGE PARKWAY BROADCAST SEEDING and HYDROSEEDING SPECIFICATIONS

3. BLUE RIDGE PARKWAY LOAD LIMITS

4. Existing Condition Photos

1‐2 LOCATION AND ACCESS

A. Job Site: The work shall be performed on the Blue Ridge Parkway near Milepost 297.0 in Watauga County, North Carolina.

B. Staging: Staging and parking for vehicles, equipment and materials shall be confined to paved areas and parking areas specifically designated by the COR. For other areas, provide written request to the COR three days prior to occupying these other areas.

C. Access

Blue Ridge Parkway

1. Access the work site only from U.S. Highway 321 to the intersection of the Blue Ridge Parkway at milepost 291.9. From there, travel south on the Parkway to the campground at milepost 297.0.

2. The maximum permitted load limits for Parkway roads accessing the work site are described in attachment BLUE RIDGE PARKWAY LOAD LIMITS.

3. Special consideration may be made by the Contracting Officer in consultation with the park engineer for overweight and oversize loads. Special permits, times and traffic control may be required for heavy/wide loads.

4. All damage shall be repaired to the Government’s specification by those who cause it and at no cost to the Government. Return the area to the condition existing prior to any work.

1‐3 PROJECT PERSONNEL

A. Government

1. The Contracting Officer (CO) is the only person with authority to enter into, administer, modify and/or terminate the contract.

2. The Contracting Officer’s Representative (COR) is a program official designated by the CO to assist in administering technical aspects of the contract. The COR cannot modify the contract.

3. Other NPS personnel may be on site to assist with project inspection. These individuals cannot modify the contract. Any on site issues or concerns shall be directed to the COR.

B. Contractor

1. Assign a competent and experienced person to oversee the construction of this project with the authority to stop or correct work due to unsatisfactory materials or workmanship.

2. All personnel performing work shall be fully qualified and experienced in the type of work to be executed in this contract. When applicable, personnel shall be certified in the necessary work for which being performed by that person. The COR may at any time request copies of necessary certifications.

1‐4 CONTRACTOR‐FURNISHED ITEMS

A. All necessary supervision, personnel, equipment, tools, transportation, supplies, materials and incidentals required to perform the work of the contract in a safe, professional manner and to satisfactorily complete the work of this project.

B. All necessary traffic control and signage to alert motorists of work in progress.

C. All necessary pedestrian controls to restrict visitors from accessing the work areas.

D. Work site security measures. Nearly all Parkway land is accessible by the public 24‐hours a day throughout the year. Parkway law enforcement officers and other staff will not be designated to

Blue Ridge Parkway provide extra security to protect project sites from visitor intrusion. It is the responsibility of the Contractor to take measures to prevent vandalism, theft, or destruction of project materials and equipment. Any proposed security measures that may affect ongoing access or use of areas otherwise not already included in the construction zone (including remote security cameras or alarms) must be discussed with and approved in advance by the COR, in consultation with the resident District Ranger. Any security issues must be reported to the COR immediately upon notice. Parkway law enforcement staff may request official statements or other information from Contractor personnel needed to follow up on reported issues.

1‐5 WORK CONDITIONS AND LIMITATIONS

A. Facility Use

1. This section of Parkway motor road opens to visitors year‐round, 24‐hours a day weather permitting. Visitation is highest during summer months and especially leaf viewing season (typically October). The campground is located adjacent to a recreational lake. Expect higher visitor traffic at this location.

2. Campground loops where work is being performed will be officially closed to visitors but have trails which pass through them. The NPS will advise the public of the closures via various means and detour the trails. The Contractor may need to provide additional, physical measures to ensure the safety of the visitors and contractor personnel as well as security of contractor materials and equipment.

B. Required Performance Period

1. The period of performance for this contract is not expected to exceed 180 calendar days.

2. On‐site and off‐site work activities may not be performed until the Notice to Proceed is issued.

3. All work shall be complete, equipment demobilized, excess materials removed and the work site made safe when a campground loop is to be open for visitor use.

4. No work is permitted during the month of October unless approved by the CO no later than September 15.

5. On‐site construction activities are permitted between 9:00 a.m. and 6:00 p.m.

6. Night work will not be permitted.

7. Weekend work and work on Federal holidays within closed campground loops may be permitted. Approval must be requested of the CO 7 days prior to the requested work time.

C. Contractor’s Use Of Premises

1. Confine on‐site material storage, equipment and vehicle parking, and staging to paved parking areas within the campground, or other areas, specifically designated by the COR.

Blue Ridge Parkway

2. Keep work site clear of trash and debris. Dispose of any trash, debris and other unusable material legally at authorized facilities on non‐Federal land. Food trash and debris shall be placed in the appropriate receptacles at the end of each day.

3. Comfort stations in the campground may be closed during the performance period. The Contractor shall provide temporary restrooms for project personnel through the performance period.

D. Existing Utilities

1. The Contractor is responsible for verifying, locating and preventing damage to known utilities.

2. Coordinate with the COR for existing utility locations.

3. Damage to known utility services by the Contractor requires immediate repair at no additional cost to the Government.

4. Damage to unknown utility services, will result in an equitable adjustment in the contract price for repairs as approved by the CO in accordance with the applicable FAR clause.

5. Interruption of existing utilities service must have prior approval from the COR.

E. Field Verification

1. The measurements and quantities specified are estimated and provided for information only.

The Contractor shall verify all dimensions and conditions affecting the work.

2. The Contractor shall notify the COR of any errors or omissions as soon as realized.

F. Park‐Specific Conditions and Limitations

1. The Blue Ridge Parkway is wholly located along the ridges of the Appalachian Mountain range in parts of Virginia and North Carolina. The following conditions may be applicable to work sites inside Parkway boundaries:

a. WEATHER‐ Sudden and dramatic changes in climate conditions are common. The Contractor must be prepared to alter work plans and provide protection for workers and equipment.

b. CLOSURES‐ Parkway officials may close portions of the Parkway at any time to protect visitors from hazardous conditions or to implement official duties of the Parkway.

c. REMOTENESS‐ Many portions of the Parkway are of extreme distance to typical services available in developed areas, including cellular, food, fuel, and emergency services. The Contractor must arrange and account for appropriate precautions and plans prior to bid submission.

d. RESOURCES‐ As a unit of the National Park System, the Blue Ridge Parkway is tasked to preserve unimpaired its natural and cultural resources and values. The Contractor must make every effort to ensure no impacts are made deleterious to these resources. It is expected that the project site and access areas will be minimally impacted only as absolutely necessary for the performance of the SOW requirements. Mitigations approved by the COR will be taken to restore pre‐existing conditions.

Blue Ridge Parkway

e. ROCK‐ The presence of various forms of rock is ubiquitous. The Parkway does not maintain data for construction purposes on the location or type of rock to be encountered by excavation or drilling activities. The contractor must verify and account for the extent, nature and impact to work activities of rock within the project site prior bid submission.

f. INVASIVE EXOTICS‐ To reduce the chance that harmful, non‐native plants or organisms will be transported from off‐parkway locations to the work site, the contractor, prior to entering the parkway, must clean all soils, roots, seeds, and other sources of plant parts and pathogens from any equipment used for the application of grasses and all heavy equipment, such as dump trucks, front end loader, and graders, which have previously been operating off the park.

g. WILDLIFE‐ All wildlife is protected within the park boundaries, and some species, which occur within the park, receive special State and Federal protection due to their rare, threatened or endangered status. Very few wildlife species present any danger to persons working within the park. Even species which have the potential to do harm to persons, can usually be avoided. Unless wildlife is presenting an immediate threat to persons, harassment or destruction of wildlife is prohibited.

2. Project‐specific environmental compliance mitigations

a. The following items are required by the National Environmental Policy Act and National

Historic Preservation Act as applied to this project and may be described further in other sections of this statement of work.

b. Staging and parking for vehicles, equipment and materials shall be confined to paved parking areas throughout the Price Park developed area. Other areas utilized shall be only as designated approved by the local Resource Management Specialist.

c. Store all temporary inorganic or construction and demolition materials in a gathered/piled manner that will readily accommodate removal, and will not create fluid or additional waste removal problems.

d. All debris shall be removed from the park for legal and proper disposal.

e. If needed, only clean fill, preferably from some site on the Parkway, shall be used. Any fill coming from off‐site shall be inspected (as well as the site it came from) to reduce the chances for introduction of exotic plant species.

f. All construction activities shall be performed in a manner having the least possible detrimental effect upon the surrounding terrain or vegetation.

1‐6 QUALITY CONTROL

A. It is the responsibility of the Contractor to develop and implement a construction quality process to ensure work conforms to the requirements of the contract.

B. Assign a competent and experienced person to oversee the construction of this project with the authority to stop or correct work due to unsatisfactory materials or workmanship.

C. Perform quality control inspection, documentation and process control sampling and testing as required by applicable standards.

D. All materials and methods used shall meet or exceed the current local, state, and federal codes, standards, and regulations applicable to this project.

Blue Ridge Parkway

E. The COR will perform on‐site inspections to insure conformance to this contract. The Government reserves the right to perform any testing it sees fit to insure a satisfactory product is delivered. Any non‐conforming work will be removed and replaced at no cost to the Government.

1‐7 REFERENCE STANDARDS:

A. Perform all work in accordance Federal Highway Administration (FHWA) Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects (FP14). These specifications are available for free download at https://flh.fhwa.dot.gov/resources/specs/

B. Materials shall meet FP‐14 specifications or be currently approved for use by North Carolina Department of Transportation (NCDOT) on the Approved Products List (APL) when applicable. The APL is available at https://apps.ncdot.gov/vendor/ApprovedProducts/

1‐8 SUBMITTALS AND PROCEDURES

A. General

1. Refer to attached CM‐16 Transmittal Form for required submittal items. Contractor is responsible for additional submittals that may be required. Electronic forms are available.

2. Unless otherwise instructed by the CO, send construction material and other items requiring approval to the CO. Provide one (1) electronic copy of each submittal unless otherwise specified.

Forward related materials as a package. Reference the SOW section number on each submittal.

Allow 14 days for review and approval.

3. The CO will indicate in writing the approval or disapproval of each submittal, the reason for any disapproval, and any resubmission requirements. One (1) of each approved submittal will be stamped and returned to the Contractor unless otherwise requested.

4. The contractor shall not mobilize until the CO has approved the necessary work plan submittals.

5. Until the Contractor receives approval from the CO, no construction material or other items requiring the CO’s approval may be ordered, delivered, or incorporated into the project work.

6. There will be no waiver of any required submittal unless authorized by the CO. The CO may request submittals other than those specified in this document.

7. Submit as a package all required items under each submittal item.

Blue Ridge Parkway

B. Submittals: Work Plans

1. Project Schedule

a. Contractor shall submit a construction schedule outlining each phase of the work along with a written narrative of the activities displayed in the schedule.

b. The schedule shall reflect the work conditions and limitations in SOW Section 1‐5.B.

c. See FAR 52.236‐15 Schedules for Construction Contracts.

d. Refer to FP‐14 Section. —SCHEDULES FOR CONSTRUCTION CONTRACTS.

2. Safety Plan

a. Contractor shall submit a site‐specific Safety Plan for the work prescribed in this contract. If a general company health and safety plan exists, submit that as well.

b. The plan shall designate a competent individual capable of overseeing and understanding worker safety and the hazards associated with this type of work to implement the plan.

c. The plan shall describe the potential hazards of the work site for each phase, along with all company policies, controls, work practices selected to minimize those hazards and detail the implementation of the plan.

d. The plan shall contain at a minimum company policy or goals statement, list of responsible persons, hazard identification, hazard controls and safe practices, emergency and accident response, employee training and communication as well as recordkeeping procedures.

3. Contractor Quality Control Plan

a. Contractor shall submit a detailed and comprehensive plan which details the planning and implementation of a construction quality process to ensure work conforms to the contract. This work also includes quality control inspection and documentation, and process control sampling and testing.

b. Refer to SOW Section 1‐6 Quality Control.

c. See FAR Clause 52.246‐12 Inspection of Construction.

d. Refer to FP‐14 Section. – CONTRACTOR QUALITY CONTROL PLAN.

4. Erosion and Sediment Control Plan

a. Contractor shall submit a site‐specific Erosion and Sediment Control Plan (ESCP) which details the necessary information to contain all sediment within the construction site for each phase of work and minimize impacts to water quality. The ESCP shall address construction sequencing, existing topography, proposed land grades, soil type, classifications of surrounding waters, critical habitat areas, and any environmental concerns.

b. Refer to the current North Carolina Department of Transportation (NCDOT) Erosions and Sediment Control (ESC) Design and Construction Manual. This document can be downloaded for free at https://connect.ncdot.gov/resources/hydro/HSPDocuments/NCDOT_ESC_Manual_2015 .pdf.

c. Also refer to FP‐14 Section 157. —SOIL EROSION AND SEDIMENT CONTROL.

Blue Ridge Parkway

5. As‐built Drawings

a. Contractor shall submit as‐built drawings upon completion of all contract work.

b. Drawings shall be a pdf file and submitted electronically.

c. Markups shall be in red and shall be neat and legible.

d. Refer to FP‐14 Section 104. —CONTROL OF WORK.

C. Submittals: Materials

1. Pipe Culvert:

a. Metallic‐Coated corrugated steel pipe, special sections (such as elbows, branch connections, and prefabricated flared end sections) and coupling bands conforming to AASHTO M 36 and either AASHTO M 218, AASHTO M 274, or AASHTO M 289 for the dimensions and thicknesses specified.

b. Furnish a suitable, well‐graded, free draining bedding material; 1/2inch maximum particle size; maximum 10.0% passing No. 200 sieve.

c. Furnish a suitable, well‐graded, compactable backfill material; 3in maximum particle size; AASHTO M 145 soil classification A‐1, A‐2, or A‐3.

2. Stone Masonry Headwall:

a. Submit representative samples for proposed new stone. Stone shall match physical characteristics of existing stones such as size, color, texture, etc.

b. Furnish masonry cement mortar, Type M or Type S.

c. SPECIAL NOTE: The contractor awarded this contract is to install one (1) stone masonry headwall in Price Park Campground Loop A. The headwall shall be constructed per the detail in these project plans. No other work in Loop A is included in this contract.

3. Drop Inlet:

a. Inlet box shall be ASTM C913 Standard Specification for Precast Concrete Water and

Wastewater Structures from a National Precast Concrete Association (NPCA) certified plant.

b. Frame and grate shall be cast iron, H‐20 traffic rated.

c. Furnish a suitable, well‐graded, free draining bedding material; 1/2inch maximum particle size; maximum 10.0% passing No. 200 sieve.

d. Furnish a suitable, well‐graded, compactable backfill material; 3in maximum particle size; AASHTO M 145 soil classification A‐1, A‐2, or A‐3.

4. Paved Waterway:

a. Submit job mix formula spreadsheet for a current year NCDOT approved for minor asphalt.

b. Hot asphalt concrete mix composed of crushed stone or gravel and asphalt binder mixed in an approved plant. Use an aggregate gradation and asphalt binder of a quality conforming to those normally used locally by either Federal or State agencies for the type of work being constructed.

c. Furnish crushed aggregate meeting Aggregate Base Course requirements.

Blue Ridge Parkway

5. Riprap:

a. Submit representative samples for riprap stone.

b. Natural riverbed rock, rounded shape, shades of brown in color, 6 inch to 8 inch diameter

6. Reset Stone Masonry Curb:

a. Reuse existing stone to the greatest extent possible.

b. Submit representative samples for proposed new stone (if needed). Stone shall match physical characteristics of existing stones such as size, color, texture, etc.

c. Portland cement concrete dry mix

d. Furnish masonry cement mortar, Type M or Type S.

7. Full Depth Reconstruction:

a. Asphalt shall meet SOW Section 1‐8.C.8.

b. Furnish crushed aggregate meeting Aggregate Base Course requirements.

8. Asphalt Pavement (roadway and patches):

a. Submit job mix formula spreadsheet for a current year NCDOT approved roadway mix

b. Superpave Asphalt Concrete Pavement (SACP), 1/2 inch (12.5 millimeter) nominal maximum sized aggregate, <0.3 equivalent single axle loads (ESAL);

9. Deep Asphalt Patch:

a. Asphalt shall meet SOW Section 1‐8.C.8.

b. Furnish crushed aggregate meeting Aggregate Base Course requirements.

10. Asphalt Pavement Widening:

a. Asphalt shall meet SOW Section 1‐8.C.8.

b. Furnish crushed aggregate meeting Aggregate Base Course requirements.

11. Topsoil:

a. Certified material from NPS approved source

b. Conserved on‐site material may be used as approved by COR

12. Seed Materials:

a. Seed material with the appropriate composition meeting Section 2.1 of the attached

BLUE RIDGE PARKWAY BROADCAST SEEDING and HYDROSEEDING SPECIFICATIONS

b. Straw material meeting Section 2.2 of the attached BLUE RIDGE PARKWAY BROADCAST

SEEDING and HYDROSEEDING SPECIFICATIONS

13. Asphalt Crack Sealing and Filling ‐

a. Crack Sealant, hot‐applied: ASTM D6690, Type II or Type III

b. Crack Filler, hot‐applied: ASTM D5078

Blue Ridge Parkway

14. Pavement Markings:

a. High‐build waterborne traffic paint (non‐reflective); yellow or white, acrylic water‐ based, ready‐mixed paint.

b. Stop Bars may be either high‐build waterborne traffic paint (non‐reflective) or preformed thermoplastic.

PART 2 – WORK REQUIREMENTS

2‐1 GENERAL

A. The referenced standard for performance of all work of this contract is the FP‐14. The FP‐14 can be downloaded for free at the link provided in SOW Section 1‐7.

B. The Contractor is responsible for investigating site conditions in the vicinity of the required work including frost depths, groundwater, location of rock, existing utilities, or any other hazards or obstacles which may increase time or cost of the work.

C. Remove excess material and debris and dispose properly at acceptable facilities on non‐Federal land.

D. Place and maintain all erosion and sediment control (E&S) while areas are disturbed and until permanent turf has established. Remove all E&S once permanent turf has established as approved by the COR.

E. Refer to FP‐14 Section 104. —CONTROL OF WORK.

F. Refer to FP‐14 Section 156. — PUBLIC TRAFFIC.

2‐2 SITE SURVEYING AND CONSTRUCTION STAKING

A. The Contractor is responsible for all surveying and staking necessary to complete the work of this project.

B. The Government will provide approximate locations and quantities of existing and proposed facilities to assist the Contractor with necessary surveying and staking.

C. Proposed locations of work, construction limits and layout for the road alignment must be staked and approved by the COR prior to construction.

D. Refer to FP‐14 Section 152. —CONSTRUCTION SURVEY AND STAKING.

2‐3 TRAFFIC CONTROL

A. Traffic control is required while work is in progress in accordance with the Manual on Uniform Traffic Control Devices (MUTCD).

B. Campground roads in loop(s) where work is being performed will be closed to visitors. Despite being closed to visitors, pedestrian traffic is likely. The Contractor shall take necessary measures to close

Blue Ridge Parkway off the work area(s) to pedestrian traffic. Campground roads in loop(s) open to visitors shall remain unobstructed at all times.

C. Maintain open, two‐way traffic on the Parkway motor road at all times. Temporary one‐lane closures on the motor road are not expected for this project. If necessary, coordinate with the COR prior to beginning work.

D. Place and maintain temporary traffic control (TTC) devices and pedestrian control devices at all times while in place and throughout the duration of the project.

E. Refer to FP‐14 Section 635. — TEMPORARY TRAFFIC CONTROL.

2‐4 EXECUTION

A. General

1. Below is a general approach to complete each of the work items. Additional steps may need to be performed to complete the work items. Refer to Section 1‐1 to determine required and optional work items. The basic applicable FP‐14 sections for the work items of this contract are also included below. It may be necessary to refer to other FP‐14 sections for subsidiary work items.

2. Each work item or phase of work shall have an on‐site preparatory meeting prior to work beginning. Multiple work items or phases of work may be combined into a larger start‐up meeting. At a minimum, the contractor’s Superintendent or Foreman and COR shall be in attendance.

3. Subsidiary work items are those items required to complete the items specifically called out in the Bid Sheet. These items are understood to be included to complete the respective required work items and the optional work items listed in SOW Section 1‐1.

4. Most of the work of this project requires placing topsoil and seed.

a. Topsoil may be from conserved material on‐site. Off‐site topsoil material shall be inspected and certified by the NPS. NPS resource management staff shall have the opportunity to inspect the material in‐place prior to excavation. Also refer to FP‐14 Section 624. – TOPSOIL.

b. Refer to attached BLUE RIDGE PARKWAY BROADCAST SEEDING and HYDROSEEDING SPECIFICATIONS for seeding requirements.

Blue Ridge Parkway

B. Mobilization and Demobilization

1. Confine staging and parking for vehicles, equipment, and materials to paved areas and parking areas as approved by the COR.

2. The Contractor shall provide for methods to appropriately secure the work site including equipment and materials and is ultimately responsible for the project site through the duration of the project.

3. Access site only by methods described in SOW Section 1‐2.

4. Install appropriate E&S, TTC devices and necessary pedestrian control devices prior to work beginning.

C. Pipe Culvert

1. Deconstruct stone masonry headwall(s) as necessary. Stockpile stone masonry for reuse.

2. Excavate and remove existing pipe culvert.

3. Clean, grade, prepare base and place bedding material and leave uncompacted.

4. Recess the bedding material at pipe joints to accommodate bells.

5. Place the culvert on the uncompacted bedding layer. Position the pipe with a longitudinal joint

(seam) so the joint is opposite the invert (up). Fully join pipe sections with leak‐resistant seals according to AASHTO M 36 or AASHTO M 196.

6. Place and compact backfill material in evenly balanced, 6 inch layers on each side of the pipe to a height of 12 inches above the top of the pipe culvert.

7. Complete backfilling to the top of the trench. Place and compact backfill material in the trench in layers not exceeding 6 inches.

8. Place and compact asphalt pavement patch.

9. Ensure inlet ditch(es) are graded to permit positive draining into the culverts in the temporary condition before the stone masonry headwall(s) are installed.

10. Basic applicable FP‐14 sections:

c. Section 104. – CONTROL OF WORK

d. Section 152. – CONSTRUCTION SURVEY AND STAKING

e. Section 209. – STRUCTURE EXCAVATION AND BACKFILL

f. Section 602. – CULVERTS AND DRAINS

D. Stone Masonry Headwall

1. Construct sample headwall and obtain COR approval prior to continuing work.

2. Carefully remove stones and stockpile so not to get damaged.

3. Excavate to the necessary dimensions as shown in the project plans.

4. Clean and grade excavated area and prepare base.

5. Place aggregate base course.

6. Place mortar bed and set first course of stone.

7. One full course of stone shall be under the pipe invert. Do not place mortar joint directly beneath the pipe invert.

8. Place and mortar remaining courses of stone.

9. Mortar between stones and around pipe inlet to prevent water infiltration behind the headwall.

10. Hand dress and shape inlet or complete paved waterway to achieve positive drainage into the pipe.

11. Backfill area with topsoil, hand dress disturbed areas, place seed and lightly compact.

12. Basic applicable FP‐14 sections:

a. Section 209. – STRUCTURE EXCAVATION AND BACKFILL

b. Section 620. – STONE MASONRY

Blue Ridge Parkway

E. Drop Inlet

1. Excavate to the dimensions necessary as specified by the manufacturer.

2. Clean and grade excavated area, prepare base and place and compact bedding.

3. Install and adjust structure to achieve proper drainage from and to the adjacent drainage devices.

4. Install pipe culvert according to SOW 2‐4.C.

5. Place backfill layers evenly on all sides of the structure. Extend each layer to the limits of the excavation. Place backfill material in compacted layers not exceeding 6 inches in depth.

6. Place necessary thickness of topsoil to natural ground level to achieve positive drainage into the inlet.

7. Place topsoil, hand dress disturbed area, place seed and lightly compact.

8. Grout or seal joint with pipe culvert according to manufacturer specifications.

9. Basic applicable FP‐14 sections:

a. Section 209. – STRUCTURE EXCAVATION AND BACKFILL

b. Section 552. – STRUCTURAL CONCRETE

c. Section 601. – MINOR CONCRETE STRUCTURES

d. Section 604. – MANHOLES, INLETS, AND CATCH BASINS

F. Paved Waterway

1. Utilize the existing natural drainage alignment where possible for placement of new paved waterway. Align outer edge of new paved waterway with edge of roadway where there is no existing natural drainage. Insure roadway edge is clean and remove any broken or dislodged existing asphalt pavement.

2. Excavate to the necessary dimensions as shown in the project plans.

3. Finished waterway shall be parallel to the finished closest roadway edge.

4. Finished waterway shall be below the grade of the finished closest roadway edge.

5. Place aggregate base course and shape to achieve the finished waterway.

6. Compact the aggregate material with at least three passes of a lightweight mechanical tamper, roller, or vibratory system.

7. Place necessary thickness of asphalt and compact while maintaining required finished shape.

8. Place topsoil, hand dress disturbed areas, place seed and lightly compact.

9. Basic applicable FP‐14 sections:

a. Section 209. – STRUCTURE EXCAVATION AND BACKFILL

b. Section 403. – ASPHALT CONCRETE

c. Section 608. – PAVED WATERWAYS

G. Riprap

1. Place material to the dimensions shown in the project plans.

2. Lightly compact to key‐in or set first layer of material.

3. Basic applicable FP‐14 sections:

a. Section 209. – STRUCTURE EXCAVATION AND BACKFILL

b. Section 251. – RIPRAP

H. Reset Stone Masonry Curb

1. Construct sample section and obtain COR approval prior to continuing work.

2. Carefully remove stones and stockpile so not to get damaged.

Blue Ridge Parkway

3. Excavate to the necessary dimensions shown in the project plans.

4. Clean and grade excavated area and prepare base.

5. Place dry concrete mix bed and compact.

6. Place stone to achieve the required finished reveal.

7. Place and compact dry concrete mix backfill in layers evenly on all sides of the stone accounting for the final layer of the appropriate material.

8. Mortar joints between stones.

9. Place final layer of material and compact.

10. Place topsoil to the dimensions shown in the project plans, hand dress, place seed and lightly compact.

11. Stockpile excess stones in one location as approved by the COR.

12. Basic applicable FP‐14 sections:

a. Section 209. – STRUCTURE EXCAVATION AND BACKFILL

b. Section 609. – CURB AND GUTTER

I. Full Depth Reclamation with Cement

1. Layout and temporarily mark locations for COR review.

2. Excavate to the dimensions shown in the project plans.

3. Clean and grade excavated area, prepare base, place and compact aggregate base course.

4. Place prime coat to aggregate base material and apply tack coat to asphalt base material.

5. Place asphalt pavement lifts a minimum of 3x the nominal maximum aggregate size.

6. Place topsoil along roadway edges, hand dress, place seed and lightly compact.

7. Basic applicable FP‐14 sections:

a. Section 203. – REMOVAL OF STRUCTURES AND OBSTRUCTIONS

b. Section 411. – ASPHALT PRIME COAT

c. Section 412. – ASPHALT TACK COAT

d. Section 418. – ASPHALT CONCRETE PAVEMENT PATCHING

J. Asphalt Pavement

1. Clean and prepare base for asphalt pavement.

2. Apply prime coat to aggregate base material and apply tack coat to asphalt base material.

3. Place asphalt pavement lifts a minimum of 3x the nominal maximum aggregate size.

4. Place topsoil along roadway edges, hand dress, place seed and lightly compact.

5. Finished surface shall be smooth in appearance free of ripples, ridges and cracks, free of “bird baths” creating ponding, and free draining to road shoulder.

6. Basic applicable FP‐14 sections:

a. Section 401. – ASPHALT CONCRETE PAVEMENT BY GYRATORY MIX DESIGN METHOD

b. Section 411. – ASPHALT PRIME COAT

c. Section 412. – ASPHALT TACK COAT

Blue Ridge Parkway

K. Deep Asphalt Patch

1. Layout and temporarily mark locations for COR review.

2. Excavate to the dimensions shown in the project plans.

3. Clean and grade excavated area, prepare base, place and compact aggregate base course.

4. Place prime coat to aggregate base material and apply tack coat to asphalt base material.

5. Place asphalt pavement lifts a minimum of 3x the nominal maximum aggregate size.

6. Place topsoil along roadway edges, hand dress, place seed and lightly compact.

7. Basic applicable FP‐14 sections:

a. Section 203. – REMOVAL OF STRUCTURES AND OBSTRUCTIONS

b. Section 411. – ASPHALT PRIME COAT

c. Section 412. – ASPHALT TACK COAT

d. Section 418. – ASPHALT CONCRETE PAVEMENT PATCHING

L. Shallow Depth Patch

1. Layout and temporarily mark locations for COR review.

2. Remove existing thickness of asphalt pavement to the dimensions shown in the project plans.

3. Scarify 6in depth the existing aggregate base material, grade and recompact.

4. Place prime coat to aggregate base material and apply tack coat to asphalt base material.

5. Place asphalt pavement lifts a minimum of 3x the nominal maximum aggregate size.

6. Place topsoil along roadway edges, hand dress, place seed and lightly compact.

7. Basic applicable FP‐14 sections:

a. Section 203. – REMOVAL OF STRUCTURES AND OBSTRUCTIONS

b. Section 411. – ASPHALT PRIME COAT

c. Section 412. – ASPHALT TACK COAT

d. Section 418. – ASPHALT CONCRETE PAVEMENT PATCHING

M. Asphalt Pavement Widening

1. Layout and temporarily mark locations for COR review.

2. Excavate to the dimensions shown in the project plans.

3. Clean and grade excavated area, prepare base, place and compact aggregate base course.

4. Place prime coat to aggregate base material and apply tack coat to asphalt base material.

5. Place asphalt pavement lifts a minimum of 3x the nominal maximum aggregate size.

6. Place topsoil along roadway edges, hand dress, place seed and lightly compact.

7. Basic applicable FP‐14 sections:

a. Section 203. – REMOVAL OF STRUCTURES AND OBSTRUCTIONS

b. Section 411. – ASPHALT PRIME COAT

c. Section 412. – ASPHALT TACK COAT

d. Section 418. – ASPHALT CONCRETE PAVEMENT PATCHING

N. Site Restoration

1. Clean and remove debris from wash out area

2. Place riprap to the dimensions shown in the project plan and according to SOW 2‐4.G.

3. Place topsoil to the dimensions shown in the project plans, hand dress, place seed and lightly compact.

4. Randomly place at angles across the wash out area the large logs on ground adjacent to the area.

5. Basic applicable FP‐14 sections:

a. Section 251. – RIPRAP

Blue Ridge Parkway

O. Asphalt Crack Sealing and Filling

1. Clean and remove debris from cracks.

2. Rout cracks to provide reservoir for sealant or filler.

3. Seal or fill cracks based on crack width.

4. Basic applicable FP‐14 sections:

a. Section 414. – ASPHALT PAVEMENT CRACK SEALING AND FILLING

P. Pavement Markings

1. Clean surfaces to be painted.

2. Layout and temporarily mark locations for COR review.

3. Place necessary markings as shown in the project plans.

4. Basic applicable FP‐14 sections:

a. Section 634. – PERMANENT PAVEMENT MARKINGS

2‐5 CLEAN UP

A. Routine Cleanup: Keep project site neat, orderly and in safe condition at all times. Provide enough refuse containers for collecting construction debris. Pick up construction debris daily to prevent blowing and scattering. Keep volatile wastes in covered containers. Unless otherwise specified, all removed material becomes the property of the contractor and shall be disposed of outside of the park in accordance to local, state and county regulations. Food trash and debris shall be disposed of in the proper bear‐proof trash containers. Trash containers may not be available throughout the duration of the project so the Contractor shall dispose of food trash and debris off‐site at the end of each work day.

B. Final Cleanup: Remove all tools, equipment, surplus materials and rubbish from the site upon completion of the work. Restore, refinish or repair surfaces of existing facilities that are marred, scratched or damaged due to work of this contract, to match the original condition. Remove any grease, dirt, asphalt, stains or foreign material from the finished surfaces. Use cleaning materials recommended by the manufacturer of the surface to be cleaned. Sweep paved or concrete areas and rake grounds to remove all construction debris. At time of the final inspection, project site shall be thoroughly clean and ready for use. All nails shall be found, collected and removed during the final cleanup of the site and through the entirety of the project at the end of each work day.

2‐6 CLOSEOUT

A. Closeout Submittals: Upon completion of the work, the Contractor shall provide any final submittals called for in Section 1‐8.

B. Substantial Completion and Final Inspection: Submit written certification that project, or designated portion of the project, is substantially complete, and request in writing a final inspection. The NPS or designated representative will make an inspection within 10 days of receipt of request. When the NPS determines the work is substantially complete, a Letter of Substantial Completion will be issued along with a list of any deficiencies to be corrected before final acceptance. If the NPS determines the work is not substantially complete, the Contractor will be notified in writing, stating the reasons.

After completing the work, Contractor shall resubmit certification and request a new final inspection.

Blue Ridge Parkway

PART 3 – MEASUREMENT AND PAYMENT

3‐1 GENERAL

Provide all supervision, labor, materials, transportation, equipment, tools and incidentals to complete the work of this project.

3‐2 MEASUREMENT

This is a lump sum contract. Individual items of work will not be measured for payment.

3‐3 PAYMENT

This a lump sum contract with one final payment made at the completion and acceptance of the project.

If the Contractor wishes to receive partial payments, a proposed payment schedule for the project work shall be submitted to the CO for review and approval. Partial payments can then be made provided all necessary documentation (e.g. payrolls, daily reports, photos, etc.) has been submitted to support the partial payment request/invoice.

END OF STATEMENT

Blue Ridge Parkway

ATTACHMENTS

CM‐16 TRANSMITTAL FORM ‐ NATIONAL PARK SERVICE

Date:

8/6/2018

Specification Section No.

1 SOW 1-8.B

2 SOW 1-8.B

3 SOW 1-8.B

4 SOW 1-8.B

5 SOW 1-8.B

6 SOW 1-8.C

7 SOW 1-8.C

8 SOW 1-8.C

9 SOW 1-8.C

10 SOW 1-8.C

11 SOW 1-8.C

Rip rap stone sample

Stone masonry stone sample (curb), portland cement, masonry cement mortar

Approved w/ Notations

Project Schedule

As‐built Drawings

Materials

Safety Plan

Contractor Quality Control Plan

Erosion and Sediment Control Plan

Contractor:

TBD

NPS ACTION

Item No.

Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

No. Copies Submitted Approved Disapproved -

Resubmit

Work Plans

Subcontractor/Supplier:

TBD

Contract No.:

TBD

Project:

Repair and Repave Price Park Campground Roads Loops B thru F

Drop Inlet, frame and grate, bedding material, backfill material

Asphalt pavement (waterways), aggregat base course material

Pipe Culvert, bedding material, backfill material

Stone masonry stone sample (headwall), masonry cement mortar

CM‐16 TRANSMITTAL FORM ‐ NATIONAL PARK SERVICE

Specification Section No.

13 SOW 1-8.C

14 SOW 1-8.C

15 SOW 1-8.C

16 SOW 1-8.C

17 SOW 1-8.C

Asphalt pavement (roadway, patches and widening), aggregate base course material

Item No.

Description of Item No. Copies

Submitted Approved Approved w/ Notations

Pavement markings (paint, stop bar if other than paint)

Asphalt crack sealant and/or asphalt crack filler

Disapproved - Resubmit(Size, Type, Name, Manufacturer, Use, Etc.)

Seed mix and certification, straw certification

Title, Date COR Signature Date

Contractor Signature Recommended by

I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the Government is not responsible for errors or omission.

Title

Topsoil source for inspection by NPS

BLUE RIDGE PARKWAY LOAD LIMITS

Gross Vehicle Weight Restrictions

Gross Vehicle Weight Single Units Pounds Kilograms Tons

2 axles 40,000 18,100 20 3 axles 48,000 21,800 24 4 or more axles 52,000 23,600 26

Combination Units

3 axles 57,000 25,900 28 4 axles 62,000 28,100 31 5 or more axles 66,000 29,600 33

IMPORTANT

When the ground is saturated with water or during periods of freezing and/or thawing, or operation over Parkway bridges, the Parkway may impose further load restrictions or suspend hauling.

Operate vehicles at speeds not exceeding 40 mph (65 kph) and spaced at 500 feet (150m) minimum intervals.

On bridges, speeds shall not exceed 25 mph (40 kph) and not more than one loaded hauling vehicle will be allowed on any bridge at one time.

Hauling over bridges, and/or oversize loads will require hauler to submit information on the dimensions and gross weight of vehicles and loads, including:

o Overall length and width including load.

o Details of axle locations, weight on each axle, number of tires on each axle, size of tire on each axle, width of each tire, air pressure in each tire and location of hitch/vehicle hinge points.

Special consideration may be made by Parkway officials for overweight and oversize loads. Special permits, times and traffic control may be required for heavy/wide loads.

All damage shall be repaired to the Government’s specification by those who cause it and at no cost to the Government. Return the area to the condition existing prior to any work.

Statement of Work November 7, 2017

Blue Ridge Parkway

EXISTING CONDITIONS

Figure 1: Typical area requiring full depth reclamation with cement.

Figure 2: Typical pipe culvert replacement and stone masonry headwall reconstruction.

Blue Ridge Parkway

Figure 3: Typical area requiring remove and reset stone masonry curb.

Figure 4: Typical area requiring paved waterway across campsite parking slip and remove stone masonry curb.

Blue Ridge Parkway

Figure 5: Typical area requiring asphalt paved waterway.

Figure 6: Typical area requiring crack sealing and filling.

Blue Ridge Parkway

Figure 7: Typical area requiring drop inlet and asphalt paved waterway.

Figure 8: Typical area requiring asphalt pavement widening.

Blue Ridge Parkway

Figure 9: Typical area requiring shallow depth asphalt patch.

Figure 10: Typical area requiring full depth asphalt patch.

Blue Ridge Parkway

Figure 11: Typical area requiring site restoration.

Figure 12: Typical area requiring rip rap waterway.

Blue Ridge Parkway

Figure 13: Area in Loop A to receive stone masonry headwall.

Figure 14: Location for large boulders.