MONUMENT TRAIL - STONE AND TRUCK HAULING
Solicitation number
140P5224Q0026
Issued by

About this file

This document is a Requirements Document that outlines the solicitation for MONUMENT TRAIL - STONE AND TRUCK HAULING. The solicitation is for the supply, hauling, and delivery of 5,000 tons of Florida DOT Limestone Base to the Big Cypress National Preserve, with delivery terms of FOB Destination 34141. The Requirements Document includes the Statement of Work, maps, FDOT specifications, and the Department of Labor Wage Determination. The solicitation number is 140P5224Q0026, and it is being issued by the Department of the Interior National Park Service Southeast Region. The solicitation includes the SF-1449 Offer form, as well as the provisions and contract clauses required for the acquisition of commercial products and services.

View the file

Other files

File Type Posted
Sol_140P5224Q0026_Amd_0001.pdf PDF
Sol_140P5224Q0026.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATIONS (RFQ)

Solicitation Number 140P5224Q0026

MONUMENT TRAIL - STONE AND TRUCK HAULING

Big Cypress National Preserve Ochopee, Florida GPS (25° 51.801'N, 81° 5.998'W)

REQUIREMENT/NEED: Crushed Lime Rock (Road Base — DOT-Approved) 5,000 Tons delivered.

SUBMISSION: Small business under NAICS code 212312 (size standard 750 employees) may submit offers on or before date for receipt of offers (SF-1449 BLOCK 8) via email to Andre_Ward@nps.gov. A complete OFFER should include:

1) Executed SF 1449 or letterhead stationery IAW FAR Clause 52.212-1 Instructions to Offerors;

2) Technical (capability and schedule availability to meet the agency need).

3) Price ( Unit Price or Lump Sum for defined work) and any discount terms, if applicable;

4) Offeror Representations and Certifications IAW FAR provision 52.212-3 paragraph (b).

5) Offerors and quoters are required to be registered in System for Award Management

(SAM)at the time an offer or quotation is submitted, and continue to be registered until time of award, during performance, and through final payment. Register or update registration via https://www.sam.gov and pursuant to FAR provision 52.204-7;

BASIS OF AWARD: Best value offer based on NPS comparative evaluations of offers IAW FAR Subpart 13.106-2 considering price and other factors (technical and past performance).

CONTRACTOR QUALIFICATIONS: A prospective contractor must affirmatively demonstrate its responsibility, and the responsibility of its proposed subcontractors as applicable. To be deem responsible, a prospective contractor must meet General Standards in FAR 9.104-1.

CONTRACT TYPE: Firm-Fixed Price commercial supply/services contract IAW FAR Part 12.207

INQUIRIES: Questions or request for clarification of solicitation or technical requirements may be submitted via EMAIL NLT 10 AM (CST) MAY 8, 2024.

mailto:Andre_Ward@nps.gov https://www.acquisition.gov/far/52.212-1 https://www.acquisition.gov/far/52.212-1 https://www.acquisition.gov/far/52.212-3 https://www.acquisition.gov/far/part-52#FAR_52_204_7 https://www.acquisition.gov/far/part-9#FAR_9_104 https://www.acquisition.gov/far/part-12#FAR_12_207

TABLE OF CONTENTS -- REQUIREMENTS DOCUMENT

1) STATEMENT OF WORK (SOW) .............................................PAGE 3-5

2) MAP of Delivery Location (primary)..................................PAGE 6

3) MAP of Delivery Location (enhanced with GPS).............PAGE 7

4) MAP of Alternate Dump Site...............................................PAGE 8

5) FDOT SPECS 911 FY24-25......................................................PAGE 9-11

6) WAGE DETERMINATION 2015-4545 (Collier County).........PAGE 12-23

Milestones:

Solicitation release 1 MAY 2024 Offer due Date: 9 MAY 2024 Evaluation of Offers: Week of 6 MAY 2024 Award Date: 15 MAY 2024 (on or about) POP: 06/03/2024 thru 07/03/2024 (tentative) 31-Days (calendar)

Tentative POP assume that the Contractor could make first delivery ~ 2-weeks after Date of Contract. This timeline is a very narrow window to take advantage of dry trail conditions in order to complete this cyclic trail stabilization project to enhance public traffic safety.

Statement of Work 4/30/2024

Stone/Truck Hauling for Monument Trail Big Cypress National Preserve

1. Background:

a. Big Cypress National Preserve (BICY) is a United States National Preserve in South

Florida, about 45 miles west of Miami on the Atlantic coastal plain. The 720,000-acre Big Cypress (along with Big Thicket National Preserve in Texas) are the first national preserve in the United States National Park System and established on October 11, 1974.

b. Big Cypress manages water flow coming out of Central Florida through Lake Okeechobee over the land as sheet flow through what is now as a River of Grass. During periods of high-water volume, Big Cypress canals diverts an extremely high volume of water to the city of Everglades City. Traditionally, manmade structure known as ditch plugs, act to slow the volume of water down to prevent flooding in Everglades City and has become a major part in reducing the Service’s Liability risk in the local community.

2. Objectives:

a. Monument Trail (Off Road Vehicle Use) is within Big Cypress National Preserve.

Supply, Haul and Deliver 5,000 Tons of DOT limerock base. Monument trail is 10.01 miles in length. Visitor use of swamp buggies and off-road vehicles, along with seasonal flooding of the Preserve, causes substantial wear and tear of the extensive trail system, each year. As a result, stone is required to fill large holes and ruts throughout the trail.

The contractor must provide sufficient trucks/drivers to deliver stone/aggregate in 20-yard dump trucks during the four-week delivery period.

3. Place of Performance:

a. Big Cypress National Preserve

Monument Trail – 14.3 miles E of:

33100 Tamiami Trail E.

Ochopee, FL 34141 (25° 51.801'N, 81° 5.998'W)

4. Period of Performance:

The period of performance is estimated to be 31 calendar days. Advance coordination with NPS COR required. Required delivery terms: within 4-weeks from date of first delivery.

5. Scope:

Haul specific material from stone quarry to exact location 14.3 miles East of BICY headquarters. Google Earth maps will be attached of dump site and GPS locations. The contractor will provide load tickets for each truck delivery to National Park Service personnel or load ticket box provided by NPS. Hauling will continue until all aggregate tonnage is delivered. Contractor shall have enough trucks on hand to deliver the 5,000 tons within the period of performance. Breakdowns of trucks should be replaced immediately with another to meet 31-day delivery schedule. Each dump truck should have at a minimum, 18–20-yard capacity. An alternate dump site has been designated and will be utilized in the event the primary dump site reaches capacity or if deemed necessary by park staff. Alternate dump site map, along with GPS location will be attached.

6. Tasks: Contractor shall complete the following tasks and requirements:

• Workdays: 8-hours daily, Monday-Friday excluding holidays, beginning at 7:30 a.m.

• Delivery location at Monument Trail in Ochopee, FL is marked on the Maps.

• Supply, Haul and Deliver 5,000 tons of DOT lime rock base (construction material).

• Obey speed limits on all roads and adhere to applicable laws and regulations.

• All roads along the route are paved roads. Comply with posted weight limits. If your vehicle, or vehicle and load, is determined to be overweight, Florida law provides for a penalty of $.05 per pound for all weight over the legal weight for the vehicle.

7. Government-Furnished Property, Material, Equipment, or Information:

• BICY to provide labor and equipment to pile up delivered stone to keep driver access open.

• BICY to provide stockpile marker on exact locations to dump at Monument Bypass Trail.

• BICY to provide personnel to collect load tickets from driver or will supply a load ticket box for drivers to put tickets in at Monument dump site.

8. Safety:

The contractor is to follow at a minimum all OSHA rules and procedures. OSHA has authority over off-highway loading and unloading. Trucking Industry OSHA Standards.

9. Security:

N/A

10. Travel:

Contractor shall be responsible for all travel related expenses for this project (i.e. tools, materials, manpower, meals, per diem)

11. Special Material Requirements:

Limerock Bearing Ratio (LBR): Materials shall meet the requirements in FDOT SPECS 911-3.1 Table 911-1 in accordance with FM 5-515:

• Average Results per LOT - 100, minimum

• Individual Results - 90, minimum

Gradation and Size Requirements: Materials shall meet the gradation and size requirements in FDOT 911-3.4 Table 911-4 in accordance with FM 1-T27 and FM 1-Tl 1:

• Limerock Base At least 97% shall pass a 3-1/2 inch sieve.

• The material shall be well graded down to dust.

• The fine material shall consist entirely of dust of fracture.

12. Quality Assurance Requirement:

Approval of mineral aggregate sources shall be in accordance with FDOT SPECS 6-2.3.

The Government will periodically evaluate the contractor’s performance in accordance with the technical requirements cited in the statement of work.

https://www.flhsmv.gov/florida-highway-patrol/commercial-vehicle-enforcement/safety-enforcement/weight-enforcement/ https://www.osha.gov/trucking-industry https://doimspp-my.sharepoint.com/personal/award_nps_gov/Documents/BICY%20MONUMENT%20TRAIL%20STONE%20AND%20TRUCK%20HAULING%20FY24%200040660706/FDOT%20SPECS%20911_fy2024-25ebookfinalcomp-revised3-4-24.pdf https://doimspp-my.sharepoint.com/personal/award_nps_gov/Documents/BICY%20MONUMENT%20TRAIL%20STONE%20AND%20TRUCK%20HAULING%20FY24%200040660706/FDOT%20SPECS%20911_fy2024-25ebookfinalcomp-revised3-4-24.pdf

The Government shall rely on contractors' existing quality assurance systems as a substitute for Government inspection and testing before tender for acceptance unless customary market practices for the commercial product being acquired include in-process inspection. Any in-process inspection by the Government shall be conducted in a manner consistent with commercial practice. The Government shall rely on the contractor to accomplish all inspection and testing needed to ensure that commercial services acquired conform to contract requirements before they are tendered to the Government. Pursuant to clause at 52.246-1, Contractor Inspection Requirements.

13. NPS Project Personnel:

a. Adam Collins

b. Reynolds Cavins

c. Dillon Lewis

d. Tyler Phillips

e. Pete Roth

f. Damien Hardgrove

Contracting Officer:

Evans Andre Ward Park Headquarters 1801 Gulf Breeze Parkway Gulf Breeze, FL 32563

(850) 232-4630 andre_ward@nps.gov

Park Facility Manager:

Christopher Hotaling 33100 Tamiami Trail E.

Ochopee, FL 34141

(239) 695-1178 christopher_hotaling@nps.gov

Contracting Officer Representative:

Damien Hardgrove 33100 Tamiami Trail E.

Ochopee, FL 34141

(239) 340-0079 damien_hardgrove@nps.gov

Monument - Dump Site Stone and Truck Hauling - GPS Location

Legend

Monument - Dump Site

100 ft

N

N Image © 2024 Airbus

Image © 2024 Airbus

Image © 2024 Airbus

911-1 Description.

FLEXIBLE-PAVEMENT MATERIALS

(INCLUDING MATERIALS FOR STABILIZING)

SECTION 911

BASE AND STABILIZED BASE MATERIALS

FooTI

This Section governs materials to be used in the construction of base and subgrade stabilization including limerock, shell, shell-rock, cemented coquina shell, and recycled concrete aggregate (RCA).

911-2 Materials.

911-2.1 General:

911-2.1.1 Approval of Material: Approval of mineral aggregate sources shall be in accordance with 6-2.3.

911-2.1.2 Deleterious Substances: Materials shall not contain deleterious substances that would result in: prevention of the bituminous prime coat from adhering to the base course; a detriment to the finishing, strength, or performance of the base; or a surface which is susceptible to distortion under construction traffic. Such substances include, but are not limited to: cherty or other extremely hard pieces, lumps, balls or pockets of sand or clay size material, organic matter, loose sand, loose, free shells, corals or skeletal remain of other marine invertebrates retained on the No. 4 sieve, or water sensitive clay minerals.

911-2.2 Limerock Composition: Limerock material shall consist of unconsolidated or partly consolidated limestone of marine origin.

911-2.3 Shell Material: Composition: Shell materials shall consist of naturally occurring deposits formed essentially of broken mollusk shell, corals and the skeletal remains of other marine invertebrates. Live or steamed shell, or man-made deposits as a by-product of the shellfish industry will not be permitted.

911-2.3.1 Bank Run Shell: Shell materials meeting the requirements of this Section which are presently found as "dry land" deposits.

911-2.3.2 Dredged Shell: Shell materials meeting the requirements of this Section which are dredged from ocean, bay or lake deposits.

911-2.4 Shell-Rock Material Composition: Shell-rock materials shall consist of naturally occurring heterogeneous deposits of limestone with interbedded layers or lenses of loose and cemented shell, to include cemented sands ( calcitic sandstone). This material shall be mined and processed in a manner that will result in a reasonably homogenous finished product.

911-2.5 Cemented Coquina Shell Material Composition: Cemented coquina shell materials to be used as cemented coquina base or stabilized base, shall be defined as naturally occurring deposits formed essentially of broken mollusk shell, corals and the skeletal remains of other marine invertebrates, which are presently found as "dry land" deposits and which have been cemented together by carbonates or other natural cementing agents.

911-2.6 Recycled Concrete Aggregate (RCA) Composition: RCA shall consist of concrete material derived from the crushing of hard portland cement concrete. In addition to the deleterious materials noted in 911-2.1.2, RCA shall be asbestos free. The following limits shall not be exceeded:

Return to Table of Contents 997 FY 2024-25

Bituminous Concrete ...................................... 1 % by weight Bricks ................................. ....................... ...... 1 % by weight Glass and Ceramics ......................................... 1 % by weight Wood and other organic substances .... ...... ... 0 .1 % by weight Reinforcing steel and welded wire fabric .... 0.1 % by weight Plaster and gypsum board ............................ 0.1 % by weight

911-3 Material Requirements.

911-3.1 Limerock Bearing Ratio (LBR): Materials shall meet the requirements in

Table 911-1 in accordance with FM 5-515:

Table 911-1 Limerock Bearing Ratio (LBR)

Material Requirement Limerock Shell Average Results per LOT - 100, minimum Shell-Rock Individual Results - 90, minimum Cemented Coquina Shell RCA Individual Results - 150, minimum

911-3.2 Liquid Limit and Plasticity: Materials shall meet the requirements in Table 911-2 in accordance with AASHTO T 89 and AASHTO T 90:

Table 911-2 Liquid Limit and Plastic Properties

Material Liquid Limit Plastic Properties

Limerock !Base Not to exceed 35 Non-Plastic (NP) Stabilized Base Plasticity not to exceed 10

Shell

NP

Shell-Rock - Cemented Coquina Shell - NP

RCA - NP

FooTI

911-3.3 Carbonates: Materials shall meet the carbonate requirements in Table 911-3 in accordance with FM 5-514:

Table 911-3 Percenta 1e of Carbonates (Calcium and Magnesium)

Material Requirement Limerock minimum - 70% Shell minimum - 50% Shell-Rock minimum - 50% Cemented Coquina Shell minimum - 50% RCA Not Applicable

Return to Table of Contents 998 FY 2024-25

FooTI

911-3.4 Gradation and Size Requirements: Materials shall meet the gradation and size requirements in Table 911-4 in accordance with FM 1-T27 and FM 1-Tl 1:

Table 911-4(1) Gradation Requirements

Material Requirement !Base At least 97% shall pass a 3-1/2 inch sieve<2)

Limerock Stabilized Base At least 97% shall pass a 1-1/2 inch sieve<2)

Passing 3-1/2 inch sieve - 97% !Dredged shell Passing No. 4 sieve - 50%, maximum

Shell Passing No. 200 sieve - maximum 7.5% (washed)

Passing 3-1/2 inch sieve - 97% !Bank-run shell Passing No. 4 sieve - 80%, maximum

Passing No. 200 sieve - 20%, maximum (washed)

Shell-Rock Passing 3-1/2 inch sieve - 97%, minimum Passing No. 4 sieve - 70%, maximum

Cemented Coquina Shell Passing No. 200 sieve - 20%, maximum (washed) Sieve Size Percent by Weight Passing

2 inch 100 3/4 inch 65 to 95

RCA

3/8 inch 40 to 85 No. 4 25 to 65

No. 10 20 to 50 No. 50 5 to 30 No. 200 0 to 10

( 1) The maximum dimension shall not exceed six inches.

2) The material shall be well graded down to dust. The fine material shall consist entirely of dust of fracture.

911-4 Exceptions, Additions, and Restrictions.

Approved materials shall not be mixed with other approved or non-approved materials.

Return to Table of Contents 999 FY 2024-25