ATCH_05_-_RFI_Response_6_JUN_2023_0003.pdf

PDF 79 KB Posted

Attached to
MOD-BIT ROOF REPLACEMNT FT BARRANCAS VISITORS CTR Federal contract opportunity
Solicitation number
140P5223Q0031
Issued by
Department of the Interior National Park Service Southeast Region

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO. N6945020R0112

PROJECT TITLE/LOCATION: B191 Elevated Mezzanine Storage Platform with Shelving/NS Mayport

GOVERNMENT PRE AWARD INQUIRY FORM

1 5/30/2023

Due to the size of this project, please confirm if full time site supervision by the GC is required, or if a part-time Superintendent/QC Manager/Site Safety aand Health Officer will be permitted to supervise and inspect the jobsite periodically.

Full time Site Supervision is required John_Kowlok@nps.gov

2 5/30/2023

The "Design-Build (DB) Request for Proposal (RFP) Template with Sustainability, ARRA”scope item #2 states “The removal and disposal of the current or existing fire hydrants, valves, and other incidental waste created in the construction progress.” Please confirm if this is required, and if so, where on site this fire hydrants would be located.

There are no hydrants in this project, please omit John_Kowlok@nps.gov

3 5/30/2023 Can additional information regarding the exisitng skylights be provided (Size, brand, etc.)?

This information is not available. Recommend the contractor make a site visit to get this info.

John_Kowlok@nps.gov

4 5/30/2023 Are any maintenance pads required to be placed for this building? No John_Kowlok@nps.gov

5 5/30/2023 Are contractors required to replace any damaged decking for the exisitng roof? If so, how much decking should contractors anticipate replacing?

There is no known damage to the decking. If during roof replacement, the contractor observes damage to the decking they need to notify the COR. If damage is incurred during the roof replacement that damage is the responsibility of the contractor to repair/replace.

John_Kowlok@nps.gov

6 5/30/2023 Is any asbestos anticipated to be encountered in the existing roof insulation? No John_Kowlok@nps.gov

7 5/30/2023 Are contractors to provide new downspouts at the drainage penetration locations for the parapet walls?

There is no identified damage to the downspouts. If during roof replacement, the contractor observes damage to the downspouts they need to notify the COR. If damage is incurred during the roof replacement that damage is the responsibility of the contractor to repair/replace.

John_Kowlok@nps.gov

8 5/30/2023 Are contractors to provide new flashing around the drainage penetration locations? Yes John_Kowlok@nps.gov

9 5/30/2023 Is an NDL warranty required for the new roof? If so, what is the length of the NDL warranty required?

Yes 15 year warranty John_Kowlok@nps.gov

10 5/30/2023

No. QUESTION

GOV'T RESPONDER

NAME, E-MAIL

Date GOVERNMENT RESPONSE