Re stripe Ft Pickens
Gulf Islands National Seashore
STATEMENT OF WORK:
CYCLIC RESTRIPE FORT PICKENS ROAD AND PARKING
LOTS
PMIS# 317756 PEPC# 43976
DATED:
7/12/2022
NATIONAL PARK SERVICE
SOUTHEAST REGION
WEST MAJOR ACQUISITION BUYING OFFICE
SOO Format
1. Background
2. Objectives
3. Place of performance
4. Period of performance
5. Scope
6. Tasks
7. Deliverables
8. Government-Furnished Property (GFP)
9. Safety
10. Security Considerations
11. Travel
12. Special Material Requirements
13. Other Unique Requirements and Considerations
14. Quality Assurance Requirement
15. Project Personnel
1. BACKGROUND:
Gulf Islands National Seashore is head quartered in Gulf Breeze, FL. Fort Pickens is located on the Western Tip of Santa Rosa Island near Pensacola Beach. The island is a popular tourist location. Fort Pickens area offers daytime access to the Gulf of Mexico and is extremely popular with park visitors. The traffic control lines are severely faded and do not comply with the MUTCD Road Standards resulting in unsafe road conditions to park visitors and employees.
This project will address the needs for this road improvement
2. OBJECTIVES:
To restripe the entire area known as Fort Pickens located in the boundary of Gulf Islands National Seashore. Work will begin at the boundary with Pensacola Beach and through what is identified in this SOW as Ft Pickens proper. The intent of this SOW is to repaint all current markings within the area known as Fort Pickens.
3. PLACE OF PERFORMANCE:
The location of this project for which these services are contracted is within the Gulf Islands National Seashore (GUIS), a unit of the National Park Service (NPS), in Escambia County, Florida. The closest city would be Gulf Breeze, Florida. This project is located in the Fort Pickens Area in the Florida District of the Gulf Islands National Seashore.
4. PERIOD OF PERFORMANCE:
All tasks and deliverables for this contract must be completed within 120 days after Notice to proceed. Days listed herein refer to calendar days. The primary and approved work schedule is Monday through Friday between the hours of 7 am to 4:30 pm. Any days or hours outside the primary work schedule will have to be requested in advance and approved by the COR in advance.
5. SCOPE:
This work is to re-stripe the current roadway markings, bike lane markings, crosswalks, and parking lots to include stop bars, Bus and RV, and directional arrows for the entire area known as Fort Pickens which begins at the parks boundary lines with Pensacola Beach. All striping and accessibility space identification shall meet all codes and laws.
6. Tasks:
Restripe approximately:
• 7 miles of double yellow line and solid white edge line on the main road. (Painting shall be as wide as any previously striping visible ~4” wide) This may require wider stripes in some areas of the roadway
• Bike lane identification (Multiple along approx... 5 miles of the roadway)
• Crosswalks (5)
• Parking area drive lane markings at fee entrance station all hand work and parking (6 spaces including current ABA spaces)
• Parking Lot #19A (30 spaces including current ABA spaces)
• Parking Lot#17A (22 spaces including current ABA spaces) will require turn around striping (corners marked out with stripes to deter parking and addition of travel direction arrows) on the East end of Parking lot currently designated by Barricades and barrels.
• Life Saving Station/Campground check in (33 spaces including current ABA spaces to include RV spaces)
• Langdon Battery Parking lot (27 spaces including current ABA spaces)
• Langdon Beach Parking lot (100 spaces including current ABA spaces)
• Entrance Area of Loop A Campground
• Old Campground Store lot and entrance to Campground Loop B, C, & D (18 spaces including current ABA spaces)
• Battery Worth parking lot and entry (164 spaces including current ABA spaces)
• Battery Cooper area (Consist of a few small lots 16 spaces total including current ABA spaces)
• Ft. Pickens Proper Roadways and parking areas (This area consist of one large parking area and several small areas along with some roadway and directional arrows, crosswalks, Bus and RV markings including current ABA spaces.
Key requirements for striping service include but are not limited to the following bulleted items:
• All roads and parking areas must be clean, swept, blown off with appropriate equipment prior to applying paint Materials.
• Clean job site of all debris at the end of each workday and ensure that all work is performed in a safe, professional manner (straight lines)
• Contractor is responsible for recording all existing pavement markings with sufficient detail (lengths, widths, symbols, and/or letters, etc.) prior to work.
• All work shall be performed with the utmost care and safety, conforming to all OSHA regulations.
7. DELIVERABLES:
Before notice to proceed
● Provide a written narrative summary of how the contractor will execute the project with a timeline. This document will be referred to as the implementation plan.
● Provide safety plan as identified in Section 9.
● Contractor shall submit plan/drawing displaying how each parking area shall meet required ABA/ADA parking lot standards
Before contract close out
Upon completion of this contract the contractor shall remove all equipment, tools, debris from project, etc. and shall leave the premises clean, neat, and in good condition.
The Contractor shall supply pay records a complete invoice to the COR in a timely manner for payment. Payment shall be made through the government electronic payment system and may take up to 30 days.
8. GOVERNMENT-FURNISHED PROPERTY, MATERIAL, EQUIPMENT, OR INFORMATION (GFP,
GFM, GFE, OR GFI):
The government will not supply any property, labor, material, tools, or equipment to complete this project.
9. SAFETY:
This contractor is to follow at a minimum all OSHA rules and procedures. Contractor must:
1. Provide a safe and healthful workplace for all employees while on NPS site.
2. Provide a safety plan outlining your safety program specific to this site.
3. Provide a level of public safety commensurate with exposure at NPS worksite.
4. Comply in rectifying all unsafe or unhealthful conditions called to his attention by the contracting officer.
5. Allow for informal and formal, announced and unannounced safety inspections by the COTR and the appropriate safety officer at the worksite.
6. Submit an acceptable documented safety plan before beginning work.
7. OSHA Highway Work Zones Compliance applicable to Construction Industry (29 CFR 1926) and more specifically Standard 1926 Subpart G - Signs, Signals, and Barricades
10. SECURITY:
N/A.
11. TRAVEL:
Contractor shall be responsible for all travel related expenses for this project, including mobilization of equipment, tools, materials, manpower, lodging, meals, and per diem.
12. SPECIAL MATERIAL REQUIREMENTS:
FDOT 971-1.6 and Federal Highways Specification: 634.05 Standard Fast Dry Waterborne Traffic Paint (Type B) TT-P- 1952 B or E Color: ASTM D1729 – White – Minimum 300 MCD
FDOT 971-1.6 and Federal Highways Specification: 634.05 Standard Fast Dry Waterborne Traffic Paint (Type B) TT-P- 1952 B or E Color: ASTM D1729 – Yellow – Minimum 300 MCD
Federal Specification: Color Standard 595B 35180 Blue Fast-Dry Waterborne Traffic Paint (TTP- 1952-E Type 1) Color: 72L-A002 Blue
13. OTHER UNIQUE REQUIREMENTS:
Parking lot striping must meet ADA-ABAAS requirements.
Chapter 5: Parking Spaces (access-board.gov):
· The term "parking facility" is used Section 208.2 instead of the term "parking lot" so that it is clear that both parking lots and parking structures are required to comply with this section. The number of parking spaces required to be accessible is to be calculated separately for each parking facility; the required number is not to be based on the total number of parking spaces provided in all of the parking facilities provided on the site.
· For every six or fraction of six parking spaces required by 208.2 to comply with 502, at least one shall be a van parking space complying with 502.
· Car parking spaces shall be 96 inches (2440 mm) wide minimum and van parking spaces shall be 132 inches (3350 mm) wide minimum, shall be marked to define the width, and shall have an adjacent access aisle complying with 502.3.
o EXCEPTION: Van parking spaces shall be permitted to be 96 inches (2440 mm) wide minimum where the access aisle is 96 inches (2440 mm) wide minimum.
· Access aisles serving parking spaces shall comply with 502.3. Access aisles shall adjoin an accessible route. Two parking spaces shall be permitted to share a common access aisle.
· Parking spaces complying with 502 that serve a particular building or facility shall be located on the shortest accessible route from parking to an entrance complying with 206.4. Where parking serves more than one accessible entrance, parking spaces complying with 502 shall be dispersed and located on the shortest accessible route to the accessible entrances. In parking facilities that do not serve a particular building or facility, parking spaces complying with 502 shall be located on the shortest accessible route to an accessible pedestrian entrance of the parking facility.
o EXCEPTIONS: 1. All van parking spaces shall be permitted to be grouped on one level within a multi-story parking facility.
· Parking spaces shall be permitted to be located in different parking facilities if substantially equivalent or greater accessibility is provided in terms of distance from an accessible entrance or entrances, parking fee, and user convenience.
· Total number of parking spaces & minimum number of accessible parking spaces:
o 1 to 25 =1 accessible o 26-50 =2 accessible
· Accessible spaces must be identified by signs with the International Symbol of Accessibility (ISA) (§703.7.2.1). Signs identifying van spaces must include the term “van accessible.” This designation is informative and does not restrict use of such spaces to van users only. No other text or content is required by the Standards.
· Signs must be at least 60” high measured to the bottom edge so that they are visible while vehicles are parked in a space. Signs can be on posts, or where feasible, on walls or suspended from ceilings (an 80” minimum headroom clearance is required at signs suspended above circulation paths (§307.4)). ISA designations on the parking surface, even if required by a state or local government, cannot substitute for above-ground signs that remain visible at all times.
· State or local codes and regulations may address other sign characteristics, including size, color, and additional content, such as “reserved” or violation fines, but the ABA Standards do not.
CONSTRUCTION WAGE RATE REQUIREMENTS STATUTE WAGE DETERMINATIONS
The Department of Labor is responsible for issuing wage determinations reflecting prevailing wages, including fringe benefits. The wage determination apply only to those laborers and mechanics employed by a contractor upon the site of the work including drivers who transport to or from the site materials and equipment used in the course of control operations. Determinations are issued for different types of construction, such as building, heavy, highway, and residential (referred to as rate schedules), and apply only to types of construction designed in the determination.
TRAFFIC AND ZONE MARKINGS PAINTS
Bio-based products: Contracting Officers should refer to DSDA’s list of USDA-designated items (available through the Internet athttp://www.biopreferred.gov) and to their agencies affirmative procurement program when purchasing supplies that contain bio-based material or when purchasing services that could include supplies that contain bio-based material.
Catalog Home : TRAFFIC AND ZONE MARKING PAINTS
USDA Certified Biobased
Mandatory Federal Purchasing https://www.biopreferred.gov/BioPreferred/faces/catalog/Catalog.xhtml
Compare
ProductFilter by Product CompanyFilter by Company
BIOSTRIPE® REGULAR DRY BLACK
WATERBORNE ALKYD LATEX TRAFFIC
SAFETY PAINT
Aexcel Corporation
BIOSTRIPE® REGULAR DRY BLUE
BIOSTRIPE® REGULAR DRY RED
BIOSTRIPE® REGULAR DRY WHITE
BIOSTRIPE® REGULAR DRY YELLOW
Soyathane water based Urethane Bipacco Coatings LLC
The government will periodically evaluate the contractor’s performance in accordance with the statement of work.
14. QUALITY ASSURANCE REQUIREMENT:
The contractor shall develop and maintain a quality control program to ensure services are performed in accordance with commonly accepted commercial practices. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. As a minimum the contractor shall develop quality control procedures addressing the critical areas identified in this statement of work. The government will periodically evaluate the contractor’s performance in accordance with the statement of work.
Additional Requirements:
● All affected areas must be restored to their original condition from before the work began. Any damages will be fixed and repaired at no cost to the government.
● Park visitors can be expected to be present during all working hours for the duration of the project. The contractor must give consideration to managing a compact construction site that minimizes intrusion (noise, traffic, material staging, dust) of visitor activities
● NEPA Required Mitigations: Follow FWC's standard shorebird protection procedures (as defined by FWC's Best Management Practices for operating vehicles on the beach) to protect wildlife on and near the road.
15. PROJECT PERSONNEL:
Contracting Officer:
Andre Ward
Contracting Officer – West MABO O: 850-934-2614 C: 850-232-4630 Email: Andre_ward@nps.gov
Facility Management:
Hank Reynolds Deputy Chief of Facilities Gulf Islands National Seashore 1801 Gulf Breeze Parkway
Gulf Breeze FL 32561-5000 O: 850-916-3024 C: 850-281-2165
Email: @nps.gov mailto:Andre_ward@nps.gov
Total Number of Minimum Number of
Parking SpacesProvided in Parking Facility Required accessible Parking Spaces
1 to 25 1
26 to 50 2
51 to 75 3
76 to 100 4
101 to 150 5
151 to 200 6
201 to 300 7
301 to 400 8
401 to 500 9
501 to 1000 2 percent of total
1001 and over 20, plus 1 for each 100, or fraction thereof, over 1000
The term "parking facility" is used Section 208.2 instead of the term "parking lot" so that it is clear that both parking lots and parking structures are required to comply with this section. The number of parking spaces required to be accessible is to be calculated separately for each parking facility; the required number is not to be based on the total number of parking spaces provided in all of the parking facilities provided on the site.
For every six or fraction of six parking spaces required by 208.2 to comply with 502, at least one shall be a van parking space complying with 502.
Car parking spaces shall be 96 inches (2440 mm) wide minimum and van parking spaces shall be 132 inches (3350 mm) wide minimum, shall be marked to define the width, and shall have an adjacent access aisle complying with 502.3.
EXCEPTION: Van parking spaces shall be permitted to be 96 inches (2440 mm) wide minimum where the access aisle is 96 inches (2440 mm) wide minimum.
Access aisles serving parking spaces shall comply with 502.3. Access aisles shall adjoin an accessible route. Two parking spaces shall be permitted to share a common access aisle.
Parking spaces complying with 502 that serve a particular building or facility shall be located on the shortest accessible route from parking to an entrance complying with 206.4. Where parking serves more than one accessible entrance, parking spaces complying with 502 shall be dispersed and located on the shortest accessible route to the accessible entrances. In parking facilities that do not serve a particular building or facility, parking spaces complying with 502 shall be located on the shortest accessible route to an accessible pedestrian entrance of the parking facility.
EXCEPTIONS: 1. All van parking spaces shall be permitted to be grouped on one level within a multi-story parking facility.
2. Parking spaces shall be permitted to be located in different parking facilities if substantially equivalent or greater accessibility is provided in terms of distance from an accessible entrance or entrances, parking fee, and user convenience.
| 1. Background: |
| 2. Objectives: |
| 3. Place of Performance: |
| 4. Period of Performance: |
| 5. Scope: |
| 7. Deliverables: |
| 8. Government-Furnished Property, Material, Equipment, or Information (GFP, GFM, GFE, or GFI): |
| 9. SAFETY: |
| 10. Security: |
| 11. Travel: |
| 12. Special Material Requirements: |
| 13. Other Unique Requirements: |
| 14. Quality Assurance Requirement: |
| The contractor shall develop and maintain a quality control program to ensure services are performed in accordance with commonly accepted commercial practices. The contractor shall develop and implement procedures to identify, prevent, and ensure non... |