Site_Visit_Agenda_0001.docx

DOCX document 42 KB Posted

Attached to
REPLACE HVAC UNITS - GULF ISLANDS NAT'L SEASHORE Federal contract opportunity
Solicitation number
140P5222Q0031
Issued by
Department of the Interior National Park Service Southeast Region

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE HVAC UNITS - GULF ISLANDS NAT'L SEASHORE, newest first.
File Type Posted
SOW-2022-HVAC_UNITS-2-NLO_HQ_BLDG_0001.docx DOCX document
Site_Visit_Sign-in_0001.docx DOCX document
Sol_140P5222Q0031_Amd_0001.pdf PDF
ATCH 2 - HVAC Quality Installation Specification qispec ACCA STD 5 QI-2010.pdf PDF
SOW-2022-HVAC UNITS-2-NLO HQ BLDG.docx DOCX document
DOL WD 2015-4561 REV18 27DEC2021_SAM.gov.pdf PDF
ATCH 4 - Energy Efficiency Requirements_ASHP.pdf PDF
ATCH 5 - Energy Efficiency Requirements_Geothermal.pdf PDF
ATCH 6 - Park Map.pdf PDF
Sol_140P5222Q0031.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Site Visit Agenda

Gulf Islands National Seashore Solicitation # 140P5222Q0031 Replace HVAC Units Date: 7 APR 2022 / Start time: 8 AM CDT (local)

· Sign in………..…………………………..…..…….………………………All Attendees

· Introductions…………………………..…..……….……….Contracting Officer

· Opening Remarks………………………..….COTR/Designated Stakeholder

· Pre-Tour Comments………………………………............Contracting Officer

· Tour Description………………………..……COTR/Designated Stakeholder

· Bullet 1 – Naval Live Oaks Area HQ Bldg HVAC

· 3 – 10-ton Air Source Heat Pumps and matched Air Handlers

· Carrier, Trane or premium equal, EERs up to 11.0 and 3.5 COP

· ASHRAE 90.1 Efficiency Compliant

· New single pump flow center, refrigerant lines, float switch, heat strips, filter rack and other associated components, and materials

· Inspect existing sub structure to ensure in good condition and compatible with new systems to be installed

· Coastal-coated protection treatment (industry standards)

· Relocate floor drains from existing bldg. interior to the exterior

· Bullet 2 – Fort Pickens Firehouse Snack Bar

· One 3-ton, LDV036 2 speed Geothermal Heat Pump System

· Water Furnace, Carrier, Trane or premium equal

· 22.3 EER / 4.1 COP (ARI 13256-1 GLHP)

· Bullet 3 – Well Field drilling and closed loop system installation

· 3 or 4 holes approximately 300' deep

· ¾" PVC pipe will be connect closed loop system

· horizontally in a trench 3' deep x 45' wide long

· Bullet 4 – Energy efficient products IAW clause 52.213-4 (b) (xiv) 52.223-15

· Information about these products is available for—

(1) ENERGY STAR® at http://www.energystar.gov/products; and (2) FEMP at https://www.energy.gov/eere/femp/energy-efficient-products-and-energy-saving-technologies

· Bullet 5 – Set-Aside 100% Total Small Business under NAICS 238220 acquisition value below the simplified acquisition threshold $250K

· Limitations on subcontracting and nonmanufacturer rule N/A

· Labor Standards for Contracts Involving Construction apply

· Final Remarks………….…………………………………..Contracting Officer

· Site Visit Ends

· Response due date: Submit firm Offers on or before 10 AM 04/19/2022 via Email: andre_ward@nps.gov (include SF-1442, Price Schedule, Past Performance) image1.jpeg

File details come from the government source that posted it. Updated .