ATTACHMENT 1
SECTION B
SUPPLIES OR SERVICES AND PRICE
National Park Service Solitication Number 1140P5218R0015 B-1
Description Material Cost/Unit Total Material Cost Labor Cost/Unit Total Labor Cost Equipment
Cost/Unit Total Equipment
Cost Direct
Cost/Unit Total Direct
Costs G10 BASE BID - REPAIR PUBLIC PIER and GOV'T DOCKS -$ -$ -$ -$ -$ -$ -$ -$
G20 BID ADDITIVE ONE - TREX UPGRADE DECK -$ -$ -$ -$ -$ -$ -$ -$
G30 BID ADDITIVE ONE - TREX UPGRADE TOP RAIL CAP -$ -$ -$ -$ -$ -$ -$ -$
Total Direct Construction Costs -$ General Conditions -$
Subtotal NET Construction Cost -$ Bonds & Permitting & Insurance - ________% 0.00% -$ Overhead - ________% 0.00% -$ Profit - ________% 0.00% -$
Estimated NET Construction Cost -$ Total Cost of Construction -$
Independently, and not as an agent of the Government, the Contractor shall provide all labor, materials, equipment and travel necessary for Repair Storm Damaged Public Fishing Pier and Government Boat Dock at Davis Bayou Area, in Ocean Springs, Mississippi.
Due to the availability of Fiscal Year Funding, work is identified as the Basic Requirement and Additives. At present, the National Park Service has funding to award all of the work identified as Basic Requirement and Additive Number 1 and 2. Should additional funds become available, Additive Work will be awarded to the contract. If funding is not available, to add Additives at the time of contract award, Additives will be written into the contract as priced Additives to be added to the contract via written modification based on the Availibiity of Funds clause included in the contract.
| Bid Item 1 Summary |
| General Conditions |
| Item 1-G10 Site Preparation |
| Item 1-G20 Site Improvements |
| Item 1-G30 Site Mechanical |