Q_A_KEMO_-_Remove_Hazardous_Trees_0002.pdf
PDF 91 KB Posted
- Solicitation number
- 140P5126Q0015
About this file
This is a Questions and Answers document for the Kennesaw Mountain National Battlefield Park hazardous tree removal solicitation. The document clarifies key requirements and submission details for this new federal requirement.
The project involves removal of hazardous trees at the park, with all tree stumps required to be cut 6 inches or less above ground. Contractors must submit ISA Arborist certification documents with their quote and should visit the worksite given the project's complexity. Bid submissions must include a price sheet and all evaluation factors outlined in section 52.212-2 of the solicitation; quotes are due Thursday, April 9, 2026 at 5:00 PM EDT via email to Jade_bynum@ios.doi.gov. The park will not require a bond for this project. Equipment such as bucket trucks or man lifts is permitted during tree removal operations, and removal of smaller trees is allowed if necessary for safe felling of hazardous trees. No photos or mile markers of tree locations are provided; contractors are directed to section 8.1 of the Statement of Work for site information. A Schedule will be coordinated between the Contracting Officer's Representative and the awarded contractor following the Notice to Proceed, rather than requiring advance submission prior to award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Kennesaw Mountain National Battlefield Park – Remove Hazardous Trees
Q&A
Q: Is there any incumbent/recompete or this is a brand-new project? If yes, could you please provide us with their award number or even if the customer bought similar services in the past.
A: Any previous awarded information would have been released at time of the contract award inside of the System for Award Management (SAM) which is the Official U.S.
Government system or sent only to the contractors who were in the competitive range or submitted a bid. Contract information or a copy of a contract is not sent out to other contractors for research. This is for a new requirement, and all information can be located in the solicitation. Please refer to SAM.gov for further information.
Q: The SOW (Section 3.1) states stumps shall be cut no more than 1 inch above ground, but the bid sheet for Types C and D specifies 6 inches or less. Which stump height standard governs for each tree removal type?
A: All tree stumps should be cut 6 inches or less above ground.
Q: Must the contractor submit a project schedule or work plan before the Notice to Proceed, and if so, how many days in advance?
A: Once the contractor receives the notice to proceed, the COR will coordinate with the contractor with a schedule to remove the trees.
Q: Are ISA Arborist certification documents required to be submitted with the quote, or will they be requested only upon award?
A: Arborist certification should be submitted with the quote.
Q: Will a bond be required for the duration of the project?
A: The park will not require a bond for this requirement.
Q: Is the price sheet the only document required for the bid submission?
A: The price sheet must be included, but also please refer to the guidance outlined in the solicitation as well as the section titled 52.212-2 EVALUATION for all factors being evaluated.
Q: To whom and where should we submit our bid?
A: Please refer to guidance outlined in the solicitation as well as the information in section 11b of the SF-18 for information regarding this matter. The closing date and time for receipt of quotes is Thursday, 9 April 2026 at 5pm (EDT) via email to Jade_bynum@ios.doi.gov.
Q: Will there/can there be photos of some of the large trees to be cut? If not, are there approximate mile markers to see them via Google Street view?
A: There are no photos or mile markers of trees location provided for this solicitation.
(Please see section 8.1 of SOW).
Q. Are we allowed to use bucket trucks or smaller man lifts instead of climbers for the trees that need to be taken down instead of felling?
A: Equipment is allowed during the tree removal process. Please see section 4.0 of SOW)
Q. The bid is clear about not cutting other trees, but in the sections that require felling are we allowed to cut small trees to allow safe felling if necessary? Or in situations like that do we then have to climb to ensure no other trees are hurt?
A: Removing smaller trees will be allowed if necessary for safe felling of hazardous trees.