B08_Attachment_0008_PPQ_140P5125Q0024_0001.pdf
PDF 231 KB Posted
- Attached to
- Provide Asbestos Abatement Services - CAHA
- Solicitation number
- 140P5125Q0024
About this file
This is a Past Performance Questionnaire (PPQ) for Request for Quotation (RFQ) 140P5125Q0024, issued by the National Park Service for Asbestos Abatement Services at Cape Hatteras National Seashore. The project requires comprehensive renovation of the Fire Cache building, including removing loose lead-based paint, restoring exterior and interior finishes with new primer and paint, removing asbestos flooring tile and particle board subflooring upstairs, installing new plywood subflooring, and carefully moving building contents in and out of temporary storage during the process.
The questionnaire is designed for a previous or current contract reference to provide an evaluation of the contractor's performance across five key areas: overall performance, timeliness, ability to resolve timeliness problems, quality of work, and an overall rating. The evaluation uses a rating scale from Exceptional to Unsatisfactory, with space for narrative comments. The solicitation is for a single Firm-Fixed Price Contract using a Lowest Priced Technically Acceptable (LPTA) source selection procedure, with an estimated performance period from July 1, 2025, through October 30, 2025.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 0008 – RFQ 140P5125Q0024
PAST PERFORMANCE
QUESTIONNAIRE
Solicitation#140P5125Q0024
Please complete this Questionnaire and Submit with your Quote
We are currently in the process of preparing our proposal for the National Park Service, Contracting Operations (ConOps) East, Solicitation Number: 140P5125Q0024 for Asbestos Abatement Services at Cape Hatteras National Seashore.
This project shall remove all loose lead-based paint and restore exterior and interior finishes of the Fire Cache building with new primer and paint. Remove all asbestos flooring tile upstairs, remove particle board subflooring upstairs down to the original existing subflooring and install new plywood subflooring on top of original subflooring. Move entire contents of the downstairs portion building into rented temporary storage units, then wipe clean and move all items back into the building placed in the same location where they were prior to moving, when asbestos containing materials and lead-based paint abatement measures are completed for Cape Hatteras Island Fire Cache Building 46500 Lighthouse Road, Buxton, North Carolina.
As part of our proposal, we have listed you as a reference on our performance for this type of service with your agency under the previous/current contract listed below. Your input on our performance is therefore requested.
Notice to Contractor
Information provided in this questionnaire is intended for use as source selection information and as such is deemed Source Selection Sensitive. Statements or comments provided in the questionnaire do not signify an express or implied endorsement of any product, supply, service, or enterprise.
This information shall not be construed as an endorsement by the Government or its employee(s) of the contractor for advertising purposes or in a manner that implies the contractor, its products, or services, are approved, endorsed, or considered by the Government to be superior to other products or services.
The contractor shall not be permitted to use any information provided in this questionnaire to publicize, or otherwise circulate, promotional materials that state or imply Governmental, organizational, group, expert, or individual endorsement or consumer testimonial of a product, service, or position which the contractor represents.
Please complete this Questionnaire and submit with your quote
Questionnaire is due to prior to the closing of RFQ #140P5125Q0024.
POC name:
POC phone number:
POC e-mail address:
Thank you.
NAME OF OFFEROR:
Phone: Fax:
mailto:Please%20complete%20this%20Questionnaire%20and%20e-mail%20to%20edward_dingle@nps.gov mailto:%20edward_dingle@nps.gov mailto:%20edward_dingle@nps.gov
Attachment 0008 – RFP 140P5125Q0024
E-Mail:
I. Current or Historical Contract Information
CONTRACT REFERENCED:
1. Contract or Identifying Number:
2. Contract Value:
3. Period of Performance:
4. Brief description of items provided:
5. Name of Person Completing Questionnaire:
Agency/Company:
Title: Phone:
E-mail:
II. EVALUATION. Please rate the Contractor utilizing the guide below. Explanatory narratives for as many responses as possible would be appreciated. These narratives need not be lengthy, just detailed. Attach additional pages if more space is needed.
Evaluation Definitions –
The following definitions should be used in the assessment of Contractor performance.
EXCEPTIONAL
Performance EXCEEDS MOST contractual requirements. The performance of areas being assessed was accomplished with few minor issues or concerns.
VERY GOOD
Performance EXCEEDS SOME contractual requirements. The performance of areas being assessed was accomplished with few minor issues or concerns, for which the Contractor’s corrective actions were highly effective.
SATISFACTORY
Performance MEETS contractual requirements. The performance of the areas being assessed contains minor issues or concerns, for which corrective actions taken by the Contractor were effective.
MARGINAL
Performance MEETS SOME contractual requirements. The performance of the areas being assessed includes significant problems, issues, or concerns for which corrective actions taken by the Contractor were only somewhat effective.
UNSATISFACTORY
Performance DOES NOT MEET contractual requirement. The performance of the areas being assessed includes serious problems, issues, or concerns for which the Contractor’s corrective actions were ineffective.
NOT APPLICABLE (N/A) Performance information not recent or relevant as defined in the Solicitation. Unable to provide assessment.
Past Performance Evaluation
Question 1. Performance
What is your assessment of the Contractor’s ability to meet your requirements?
Exceptional Very Good Satisfactory Marginal Unsatisfactory N/A
Performance
Comments, if any.
Questions 2 and 3. Timeliness
What is your assessment of the Contractor’s ability to provide products in a timely manner?
Timeliness
Ability to Resolve Timeliness Problems
Question 4. Quality of Work
What is your assessment of the Contractor’s ability to meet requirements of tasks and the overall quality of the work?
Quality of Shipments
Question 5. Overall Rating of Contractor’s performance
What is your overall rating of Contractor’s performance (requirements, schedule, and price) on contract being assessed?
Exceptional Very Good Satisfactory Marginal Unsatisfactory
General Comments:
| Please complete this Questionnaire and Submit with your Quote |
| I. Current or Historical Contract Information CONTRACT REFERENCED: |
| II. EVALUATION. Please rate the Contractor utilizing the guide below. Explanatory narratives for as many responses as possible would be appreciated. These narratives need not be lengthy, just detailed. Attach additional pages if more space is needed. |
| Past Performance Evaluation Question 1. Performance |
| Questions 2 and 3. Timeliness |
| Question 4. Quality of Work |
| Question 5. Overall Rating of Contractor’s performance |
File details come from the government source that posted it. Updated .