B08_Attachment_5_Subcontracting_Percentage_Worksheet.docx

DOCX document 95 KB Posted

Attached to
GATE-REHAB ROOF-BLDG 40
Solicitation number
140P4526R0017
Issued by

About this file

This is a Subcontracting Percentage Worksheet template for FAR Clause 52.219-14 applicable to the Building 40 Stabilization project at Gateway National Recreation Area, Fort Hancock, New Jersey (Solicitation 140P4526R0017). The worksheet is issued by the Department of the Interior National Park Service Contracting Operations East office in Staten Island, New York.

The worksheet establishes subcontracting requirements for general construction work, requiring prime contractors and similarly situated entities to perform a minimum of 15 percent of the work, excluding material costs, with subcontractors receiving no more than 85 percent of the government-paid contract performance amount. The template provides calculation instructions for determining subcontracting labor cost percentages by combining direct labor, fringe benefits, and labor general and administrative (G&A) costs for both prime contractors and subcontractors. The sample calculation demonstrates a 21.43 percent subcontracting labor percentage based on prime contractor costs of $605 (direct labor $250, fringe benefits $300, and G&A $55) and subcontractor costs of $165 (direct labor $50, fringe benefits $100, and G&A $15). Contractors must substantiate that labor overhead is allowable under FAR 31.205-6(m) or the entire overhead amount will be eliminated from calculations. This worksheet is intended for offerors to complete and submit as part of their proposals to demonstrate compliance with subcontracting requirements.

View the file

Other files

File Type Posted
Sol_140P4526R0017_Amd_0002.pdf PDF
B08_Submitted_Questions_and_Answers_0002.docx DOCX document
Sol_140P4526R0017_Amd_0001.pdf PDF
B08_References_Worksheet_(1)_(1).pdf PDF
B03_WDNJ20260037_01062026.pdf PDF
A04__B40_Stabilization_SOW_REV_2026_02_09.docx DOCX document
ContractPriceSchedule_B40.xlsx XLSX spreadsheet
A06_B40_drawings_SAHO.pdf PDF
Sol_140P4526R0017.pdf PDF
B08_Past_Performance_Questionnaire_GATE_B40.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

NATIONAL PARK SERVICE

CONTRACTING OPERATIONS (ConOps) EAST New York Major Acquisition Buying Office 210 New York Avenue Staten Island, NY 10305

Solicitation: 140P4525R0022 – Building 40 Stabilization Page 2 of 2

25 July 2025

SUBJECT: FAR CLAUSE 52.219-14, SUBCONTRACTING PERCENTAGE WORKSHEET

SOLICITATION Building 40 Stabilization

PRIME CONTRACTOR: _________________________ SOURCE: ________________________

SUBCONTRACTOR: ___________________________ SOURCE: ________________________

SAMPLE SAMPLE SAMPLE

To calculate, either follow the below directions OR right click the above Excel ‘Object’ and select ‘Worksheet Object’ then ‘Edit’. You can then input Direct Labor/Fringe Benefits/G&A % and it will calculate for you (as illustrated).

a) To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).

b) Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).

c) Calculate the subcontractor's LABOR G&A by multiplying the subcontractor's G&A rate by the subcontractor's SUBTOTAL figure in (B).

d) Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.

e) Next, using the formula below, calculate the subcontracting labor percentage.

____(D)____

(C) + (D)

SUBCONTRACTING LABOR COST PERCENTAGE = %

*The firm must demonstrate that their labor overhead is allowable in accordance with FAR 3 l.205- 6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.

**G&A denotes General and Administrative Costs ***You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor's costs.

In accordance with FAR Clause 52.219-14(e)(3), General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded. Therefore, the prime contractor or similarly situated entities shall perform a minimum of 15 percent of the work, excluding the cost of materials.

NPS-National Capital Area Page 1 of 1

FOR OFFICIAL USE ONLY

SOURCE SELECTION INFORMATION – SEE FAR 3.104

Preserving unimpaired the natural and cultural resources and values of the national park system for the enjoyment, education, and inspiration of this and future generations.

FOR OFFICIAL USE ONLY

SOURCE SELECTION INFORMATION – SEE FAR 3.104

image1.emf

Microsoft_Excel_Worksheet.xlsx Sheet1

PRIME CONTRACTOR SUBCONTRACTOR

DIRECT LABOR $250.00 $50.00

FRINGE BENEFITS $300.00 $100.00

SUB TOTAL (A)$550 (B)$150

LABOR G&A** @ 10.00% $55.00 10.00% $15.00

TOTAL LABOR COST (C)$605 (D)$165

Subcontracting Labor Percentage 21.43% image2.jpeg image3.jpeg

File details come from the government source that posted it. Updated .