This is an Amendment 001 document containing Requests for Information (RFIs) and Government responses for a boiler replacement project at Beale House, Adams National Historic Park in Quincy, Massachusetts (Solicitation 140P4326R0026). The project, issued by the National Park Service Northeast Region, requires the replacement of an existing gas-fired boiler system installed in 1998 with new high-efficiency, code-compliant units while protecting historic fabric and ensuring compatibility with existing mechanical, electrical, and control systems. A second site visit has been scheduled for Wednesday, July 1, 2026, at 9:00 a.m. EDT at 181 Adams Street, Quincy, MA 02169.

Key clarifications from the government responses address contractor concerns regarding design approach, material procurement, and project logistics. Contractors may propose any high-efficiency boiler meeting performance requirements rather than a specific manufacturer model. The existing building controls contractor has remote access capability, and the government will not provide 1998 paper-only design drawings. One qualified individual may serve as Superintendent, SSHO, and QC Manager. The period of performance is fixed at 200 days with work to be completed before heating season, starting approximately 14 days after award; extension requests due to equipment lead times cannot be accommodated. The facility is tax-exempt and currently occupied by 4–10 people. The government will provide warranty and COTR verification; no third-party commissioning agent is required. No asbestos or hazardous materials are known to be present, temporary heating is not required, partitioning and negative air machines are not required, and permitting is the contractor's responsibility to comply with current codes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P4326R0026 ADAM Replace Boiler at Beale House Amendment 001 RFIs 1-17

****Second Site visit to be held on Wednesday, July 1, 2026, at 9:00am EDT. **** All interested parties will meet at 181 Adams St, Quincy MA 02169.*******

1. Please confirm design intent is to remain in place existing B&G inline pumps. Only supply and return piping drops to boilers will be disconnected and reconnected to new, leaving existing/current piping configuration in place.

Government response: Leave and reconnect to existing B&G inline pumps.

2. Please confirm who the existing building controls contractor is within the building in order to coordinate integration with.

Government response: Existing Control contractor has the ability for remote access.

3. Please confirm if there is a 3rd party commissioning agent or if it is the reasonability of the contactor to verify and commission their own system.

Government response: COTR & contractor warranty

4. Can the Agency provide existing mechanical, gas, venting, and control drawings for the existing boiler system?

Government response: Not available, in installed 1998 paper design drawings only.

5. Has the Agency conducted any asbestos or hazardous material survey within the boiler room and associated piping insulation areas? If so, please provide the report.

Government response: New 1998 installation no known asbestos.

6. Is there a preferred boiler manufacturer/model, or may contractors propose any high-efficiency boiler meeting the performance requirements outlined in the SOW?

Government response: Contractor may propose suitable high-efficiency boilers meeting the performance requirements.

7. Please confirm whether temporary heating will be required during boiler replacement activities.

Government response: Period of performance ends before heating season

8. Can one person "triple hat" as Superintendent, SSHO and QC Manager? Government response: Yes, if qualified

9. Can the period of performance be extended after award once the material/equipment lead times are confirmed due to current market conditions for the equipment for this project?

Government response: Work to be performed before heating season. period of performance is 200 days

10. Please provide the site visit attendee sign-in sheet that occurred on Wednesday, June 24, 2026, at 10:00am EDT.

Government response: Attachment 2, site visit sign in sheet.

11. (If building is occupied) Are there any phasing requirements? How many people will be in the building? Are there any temporary heating/cooling requirements? Government response: Work to be performed before heating season. 4-10 occupants

12. Please confirm whether asbestos or lead is present on this project, and if so, provide the relevant documentation.

Government response: Not aware system installed new in 1998

13. Is this project tax exempt?

Government response: Yes

14. When do you anticipate on site work starting?

Government response: 14 days after award

15. Are third party inspections required?

Government response: COTR & contractor warranty

16. Is permitting required?

Government response: Work to be performed to current codes

17. Are partitioning, dust containment, and/or negative air machines required for this project?

Government response: No