Attachment_5_-_Mechanical_Plans_0001.pdf
PDF 532 KB Posted
- Solicitation number
- 140P4326R0003
About this file
This document contains architectural floor plans for the Farwell Jones House rehabilitation project at Minute Man National Historical Park under the Great American Outdoors Act (GAOA). The drawings show basement, first floor, second floor, and garage plans with detailed specifications for construction work.
The rehabilitation scope includes window restoration with preparation and installation of new window frames and sash (W101-W212 series), replacement of existing aluminum storm windows with new storms, exterior door replacement with new aluminum storm doors per door schedule, installation of a new lightning protection system coordinated with roofing work, clapboard siding repairs with dutchman repair sections where windows were cut out, and interior bathroom exhaust fan roof vent installation. Interior work consists of complete prep and paint for entire interior spaces, refinishing of selected wood floors, installation of door closers on selected interior doors, and bathroom upgrades coordinated with finish and door schedules. The project drawing number is 406 181577, sheet A3.1 (Basement and First Floor Plans) and A3.2 (Second Floor and Garage Plans), dated June 2, 2022, with design, technical review, and CADD work performed by SEH and HACE. The work is part of ancillary structure rehabilitation efforts with a PMIS number of 317529.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASEMENT FLOOR PLAN
UP
UP
WB01 WB02
WB03
WB04
WB05
WB06
WB07
WB08
FIRST FLOOR PLAN
DN
UP
UP
DN
DN
W101 W102 W103 W104
W105
W106
W108
A
W108
B
W109
W113
W110
W112
B
W112
A
W111
W107
APPROXIMATE
LINE OF
CONCRETE
WASH
APPROXIMATE LINE
OF CONCRETE
WASH
PROJECTING STONE
FOUNDATION;
PROTECT
A1
A1
A2
A3
A7
A5
A6
A6
A6
A4
APPROXIMATE
LINE OF
CONCRETE
WASH
A1 REBUILD BRICK PIERS 100%; SALVAGE ALL
SOUND BRICK AND INCORPORATE INTO WORK;
INSTALL DAMP COURSE AT PIER BASE.
A2 REPOINT BRICK. # S.F.
A3 REPLACE BRICK. # EA
A4 REPLACE CONCRETE. # S.F.
A5 PATCH CONCRETE WASH. # S.F.
A6 REPOINT OPEN CRACKS IN CONCRETE. # L.F.
A7 SELECTED REPAIR OF CONCRETE. # S.F.
PLAN REPAIR NOTES
FJ 1 REMOVE AND REPLACE ALL ASPHALT SHINGLE ROOFING,
INCLUDING SHINGLES, UNDERLAYMENT, DETERIORATED
SHEATHING, FLASHING, AND DRIP EDGES. ASSUME 10%
REPLACEMENT OF ROOF SHEATHING.
FJ 2 PREP, PRIME AND PAINT ALL EXTERIOR PAINTED SURFACES
INCLUDING FOUNDATION, SIDING, TRIM, WINDOW
FRAMES/SILLS, GUTTERS, DOWNSPOUTS, ETC. ALL PAINT TO
MATCH EXG. COLORS.
FJ 3 REPAIR OF FRONT PORCH N.I.C. - WORK WILL BE DONE BY
OTHERS. CONTRACT WORK CONSISTS OF FOUNDATION
PIER REPAIR/REPOINTING, INSTALLATION OF NEW SBS
ROOFING, AND PREP AND PAINTING OF COMPLETED WORK
BY OTHERS.
FJ 4 REPAIR OF SIDE PORCH N.I.C. - WORK WILL BE DONE BY
OTHERS. CONTRACT WORK CONSISTS OF INSTALLATION OF
NEW ASPHALT SHINGLE ROOFING, WOOD GUTTER AND
COPPER DOWNSPOUT, PREP AND PAINTING OF COMPLETED
WORK BY OTHERS.
FJ 5 REMOVE WINDOW SASH W209 A AND B, TRIM, CASING. INFILL
OPENING AND INSTALL CLAPBOARD SIDING TO MATCH
ADJACENT. DUTCHMAN REPAIR SECTION OF
SOFFIT/FASCIA/EAVE WHERE CUT OUT FOR WINDOW.
PROVIDE ROOF VENT FOR BATHROOM EXHAUST FAN.
FJ 6 REPLACEMENT OF BULKHEAD N.I.C. - WORK WILL BE DONE
BY OTHERS. CONTRACT WORK CONSISTS OF PREP AND
PAINTING OF WORK COMPLETED BY OTHERS.
FJ 7 PROVIDE ALL NEW LIGHTNING PROTECTION SYSTEM;
COORDINATE WITH ROOFING WORK. SEE ELECTRICAL.
FJ 8 REHABILITATE EXG WINDOW FRAMES AND SASH; REPLACE
EXG. ALUM. STORM WINDOWS WITH NEW STORMS. SEE
WINDOW SCHEDULE.
FJ 9 REHABILITATE EXT DOORS; REPLACE EXG. ALU. STORM
DOOR WITH NEW . SEE DOOR SCHEDULE.
FJ 10 PREP AND PAINT ENTIRE INTERIOR, REFINISH SELECTED
WOOD FLOORS, INSTALL DOOR CLOSERS ON SELECTED
INTERIOR DOORS. UPGRADE BATHROOM, COORDINATE WITH
FINISH SCHEDULE AND DOOR SCHEDULE.
GENERAL NOTES
SCALE:
A
SCALE:
A
SCALE:
A
A7
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
TITLE OF SHEET
CADD:
MINUTE MAN NATIONAL HISTORICAL PARK
DRAWING NO.
PMIS No.
SHEET
317529
06/02/2022
HACE
SEH
SEH
REHABILITATE ANCILLARY STRUCTURES
GREAT AMERICAN OUTDOORS ACT (GAOA)
181577
A3.1
FARWELL JONES HOUSE
BASEMENT AND FIRST FLOOR PLANS
c U s e r s s e h o l l i s t e r o n e d r i v e d o i m i m a g a o a G
A O
A a n c i l l a r y C
A D
D C
D s M
I M
A A
N C
A
S e r i e s
F
J d w g
A
M
A u t o
C A
D
P
D F
G e n e r a l
D o c u m e n t a t i o n p c
AutoCAD SHX Text B02
AutoCAD SHX Text B01
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3481
AutoCAD SHX Text 8'
AutoCAD SHX Text 4'
AutoCAD SHX Text 2'
AutoCAD SHX Text
AutoCAD SHX Text 16'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
STAIR 1
AutoCAD SHX Text
STAIR 2
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text 101A
AutoCAD SHX Text 104A
AutoCAD SHX Text 105A
AutoCAD SHX Text 107A
AutoCAD SHX Text
AutoCAD SHX Text A3.1
AutoCAD SHX Text
AutoCAD SHX Text A3.1
AutoCAD SHX Text E107A
AutoCAD SHX Text E105A
AutoCAD SHX Text E106
AutoCAD SHX Text E107B
AutoCAD SHX Text
FJ
AutoCAD SHX Text
AutoCAD SHX Text
FJ
AutoCAD SHX Text
AutoCAD SHX Text
FJ
AutoCAD SHX Text
AutoCAD SHX Text
EB01
AutoCAD SHX Text E105B
AutoCAD SHX Text E104A
AutoCAD SHX Text E101A
AutoCAD SHX Text E101B
AutoCAD SHX Text E101C
AutoCAD SHX Text E103A
AutoCAD SHX Text E102A
AutoCAD SHX Text E102B
AutoCAD SHX Text E102C
AutoCAD SHX Text
OF
SECOND FLOOR PLAN
UP
DN
DN
W201
W209
A
W202 W203 W204 W205
W206
W207
W208
W209
B
W212
W210
W211
GARAGE FLOOR PLAN
WG01
WG03
WG04
WG02
A4
A4
A4
A4
A1 REBUILD BRICK PIERS 100%; SALVAGE ALL
SOUND BRICK AND INCORPORATE INTO WORK;
INSTALL DAMP COURSE AT PIER BASE.
A2 REPOINT BRICK. # S.F.
A3 REPLACE BRICK. # EA
A4 REPLACE CONCRETE. # S.F.
A5 PATCH CONCRETE WASH. # S.F.
A6 REPOINT OPEN CRACKS IN CONCRETE. # L.F.
A7 SELECTED REPAIR OF CONCRETE. # S.F.
PLAN REPAIR NOTES
FJ 1 REMOVE AND REPLACE ALL ASPHALT SHINGLE ROOFING,
INCLUDING SHINGLES, UNDERLAYMENT, DETERIORATED
SHEATHING, FLASHING, AND DRIP EDGES. ASSUME 10%
REPLACEMENT OF ROOF SHEATHING.
FJ 2 PREP, PRIME AND PAINT ALL EXTERIOR PAINTED SURFACES
INCLUDING FOUNDATION, SIDING, TRIM, WINDOW
FRAMES/SILLS, GUTTERS, DOWNSPOUTS, ETC. ALL PAINT
TO MATCH EXG. COLORS.
FJ 3 REPAIR OF FRONT PORCH N.I.C. - WORK WILL BE DONE BY
OTHERS. CONTRACT WORK CONSISTS OF FOUNDATION
PIER REPAIR/REPOINTING, INSTALLATION OF NEW SBS
ROOFING, AND PREP AND PAINTING OF COMPLETED WORK
BY OTHERS.
FJ 4 REPAIR OF SIDE PORCH N.I.C. - WORK WILL BE DONE BY
OTHERS. CONTRACT WORK CONSISTS OF INSTALLATION OF
NEW ASPHALT SHINGLE ROOFING, WOOD GUTTER AND
COPPER DOWNSPOUT, PREP AND PAINTING OF COMPLETED
WORK BY OTHERS.
FJ 5 REMOVE WINDOW SASH W209 A AND B, TRIM, CASING.
INFILL OPENING AND INSTALL CLAPBOARD SIDING TO
MATCH ADJACENT. DUTCHMAN REPAIR SECTION OF
SOFFIT/FASCIA/EAVE WHERE CUT OUT FOR WINDOW.
PROVIDE ROOF VENT FOR BATHROOM EXHAUST FAN.
FJ 6 REPLACEMENT OF BULKHEAD N.I.C. - WORK WILL BE DONE
BY OTHERS. CONTRACT WORK CONSISTS OF PREP AND
PAINTING OF WORK COMPLETED BY OTHERS.
FJ 7 PROVIDE ALL NEW LIGHTNING PROTECTION SYSTEM;
COORDINATE WITH ROOFING WORK. SEE ELECTRICAL.
FJ 8 REHABILITATE EXG WINDOW FRAMES AND SASH; REPLACE
EXG. ALUM. STORM WINDOWS WITH NEW STORMS. SEE
WINDOW SCHEDULE.
FJ 9 REHABILITATE EXT DOORS; REPLACE EXG. ALU. STORM
DOOR WITH NEW . SEE DOOR SCHEDULE.
FJ 10 PREP AND PAINT ENTIRE INTERIOR, REFINISH SELECTED
WOOD FLOORS, INSTALL DOOR CLOSERS ON SELECTED
INTERIOR DOORS. UPGRADE BATHROOM, COORDINATE
WITH FINISH SCHEDULE AND DOOR SCHEDULE.
GENERAL NOTES
SCALE:
A
SCALE:
A
SCALE:
A
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
TITLE OF SHEET
CADD:
MINUTE MAN NATIONAL HISTORICAL PARK
DRAWING NO.
PMIS No.
SHEET
317529
06/02/2022
HACE
SEH
SEH
REHABILITATE ANCILLARY STRUCTURES
GREAT AMERICAN OUTDOORS ACT (GAOA)
181577
A3.2
FARWELL JONES HOUSE
SECOND FLOOR AND GARAGE PLANS
c U s e r s s e h o l l i s t e r o n e d r i v e d o i m i m a g a o a G
A O
A a n c i l l a r y C
A D
D C
D s M
I M
A A
N C
A
S e r i e s
F
J d w g
A
M
A u t o
C A
D
P
D F
G e n e r a l
D o c u m e n t a t i o n p c
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3481
AutoCAD SHX Text 8'
AutoCAD SHX Text 4'
AutoCAD SHX Text 2'
AutoCAD SHX Text
AutoCAD SHX Text 16'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
STAIR 1
AutoCAD SHX Text
STAIR 2
AutoCAD SHX Text
STAIR 3
AutoCAD SHX Text
AutoCAD SHX Text A3.2
AutoCAD SHX Text
AutoCAD SHX Text A3.6
AutoCAD SHX Text E207A
AutoCAD SHX Text E206
AutoCAD SHX Text E205
AutoCAD SHX Text E201B
AutoCAD SHX Text E204
AutoCAD SHX Text E207B
AutoCAD SHX Text E202
AutoCAD SHX Text E201A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A3.2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FJ
AutoCAD SHX Text
AutoCAD SHX Text 205A
AutoCAD SHX Text 208A
AutoCAD SHX Text 208B
AutoCAD SHX Text 206B
AutoCAD SHX Text 206A
AutoCAD SHX Text
OF
Blank Page
File details come from the government source that posted it. Updated .