This document is a set of question responses related to a federal contract opportunity to Replace U.S.S. Constitution Museum Connector Roof (Solicitation Number: 140P4324R0030). The key details are:

The existing roof drains, downspout points, and copper vent caps are to be reused. The contractor may place a dumpster in the grass area north of the connector building. The contractor is responsible for removing and reinstalling the heat trace cable, as well as relocating the existing working split system on the roof. No asbestos testing has been conducted on the existing roof material. Payment and performance bonds are required for this project. The preferred location for the dumpster is the grass area north of the connector building, but the maximum allowed size is not specified.

View the file

Other files for this federal contract opportunity

Other files attached to BOST - REPLACE CONNECTOR ROOF, newest first.
File Type Posted
Sol_140P4324R0030_Amd_0002.pdf PDF
Sol_140P4324R0030_Amd_0001.pdf PDF
Attachment_4_-_Temporary_Parking_Request_0001.pdf PDF
B08_Attachment_2_-_Drawings.pdf PDF
B08_Attachment_1_-_Scope_of_Work.pdf PDF
Sol_140P4324R0030.pdf PDF
Provisions_Clauses.pdf PDF
B08_Attachment_3_-_WD_MA20240001_docx.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Replace U.S.S. Constitution Museum Connector Roof (140P4324R0030)

1. Are we reusing the existing Drain and Drain Caps? Per SOW Section 3.2 & drawing 5/A- 501 existing drains to remain and drain covers replaced.

2. Are the existing downspout points to remain? Yes

3. Can we put a dumpster against the building in the grass area? Yes, this is preferred location.

4. Are we reworking the heat trace lines? Under the Demolition Key Notes on drawing sheet AD-101, “remove and safely store all heat trace cable to be reinstalled.”

5. Has the existing roof material been tested for ACM's? Not to our knowledge

6. Are we reusing the existing Copper vent caps? Yes, per drawing 6/A-501

7. Who is disposing of the non-working Split system on the roof? Roofing contractor

8. Who will relocate the Existing working split system on the roof? Roofing contractor

9. Do we need to bond this project? Yes, payment and performance bonds are required for this project. See block 12a of the SF1442.

10. Do you have a location from the dumpster? And size allowed? Grass area north of the connector building (site of work) is the preferred location. Size not specified.