Sol_140P4324R0025_Amd_0002.pdf
PDF 84 KB Posted
- Attached to
- Replace Substandard Culverts and Bridges at Katahd Federal contract opportunity
- Solicitation number
- 140P4324R0025
About this file
This document is an amendment to Solicitation 140P4324R0025 for the replacement of substandard culverts and bridges at Katahdin Woods and Waters National Monument (KAWW). The amendment corrects a previous answer provided in Amendment 0001 and clarifies that a bid bond/offer guarantee is required. The period of performance is from 08/26/2024 to 09/30/2025, and the contracting officer's representative is Christopher Loft. The contracting point of contact is Mari Tolleson. The solicitation is issued by the Department of the Interior National Park Service Northeast Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment0002_0002.pdf | ||
| Sol_140P4324R0025_Amd_0001.pdf | ||
| Amendment0001_0001.pdf | ||
| B08-Attachment_4-SOW_Penobscot_River_Loop_Bridge_7221.pdf | ||
| B08-Attachment_3-SOW_Messer_Pond_Road_Culvert_7205.pdf | ||
| Sol_140P4324R0025.pdf | ||
| B08_Solit_Clauses_Construction-KAWW_Culverts_Bridges.pdf | ||
| B08-Attachment_6-Option_SOW_Messer_Pond_Road_Bridge_7042.pdf | ||
| B08-Attachment_5-SOW_Raggid_Brook_4447.pdf | ||
| B08-Attachment_2-SOW_Messer_Pond_Road_Bridge_7041.pdf | ||
| B08_Attachment_10-Limitation_on_Subcontracting_Report_Template.xlsx | XLSX spreadsheet | |
| B08-Attachment_1-SOW_Kelloch_Moutain_Road_Culvert_7542.pdf | ||
| B08_Attachment_7-WD-ME20240047-4_5_24.pdf | ||
| B08-Attachment_9-Past_Performance_Questionnaire.doc | DOC document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P4324R0025 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Boston MA 02129-4543
PNN
Building I-1 Charlestown Navy Yard Boston National Historical Park
NPS, NER - NE MABO
07/01/20240002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/01/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
KAWW - 3 Bridges, 2 Culverts
Amendment 0002 - RFIs 7-8
Answer to RFI 7 on Amendment 0001 was incorrect, the correct answer is on Amendment 0002 for RFI 7.
Bid Bond/Offer Guarantee is required. SF1442 is incorrected annotated.
Period of Performance: 08/26/2024 to 09/30/2025
COR: Christopher Loft, christopher_loft@nps.gov
Contracts POC: Mari Tolleson, mari_tolleson@nps.gov
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Mari Tolleson
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
File details come from the government source that posted it. Updated .