This document is an amendment to a solicitation (Solicitation Number: 140P4324R0019) for the demolition and replacement of the Schoodic wastewater system for the National Park Service's Northeast Region. The purpose of this amendment is to revise the Bid Schedule in Section B to include a unit of measure and quantity for CLIN 00030 - Ledge Excavation. The period of performance is from 01/01/2025 to 12/31/2025. The solicitation includes the following base line items: Wastewater Treatment Plant Demolition and Decommissioning, Selective Site Demolition, Ledge Excavation, Gravity Sewer and Effluent Forcemain Installation, Septic Tank and Sewer Pump Station Construction, Septic Disposal Field Construction, and Reed Bed Disposal. Offerors are required to submit pricing for all base and option line items.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4324R0019_Amd_0001.pdf | ||
| Sol_140P4324R0019.pdf | ||
| B08_Attachment_5_Limitation_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| B08_Attachment_1_Specs.pdf | ||
| B08_Attachment_4_Construction_Contract_Administration.docx | DOCX document | |
| B08_Attachment_2_Drawings.pdf | ||
| B08_Attachment_3_DOL_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P4324R0019 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Boston MA 02129-4543
PNN
Building I-1 Charlestown Navy Yard Boston National Historical Park
NPS, NER - NE MABO
ACAD - 18720309/12/20240002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/27/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment is to revise Section B - Bid Schedule to include a unit of measure and quantity for CLIN 00030.
Amended Bid Schedule is included as a continuation page to this Amendment.
Period of Performance: 01/01/2025 to 12/31/2025
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Jason Albright
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
SECTION B – BID SCHEDULE
CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER: 140P4324R0019
PARK - PMIS: 187203
PROJECT TITLE: Demolish and Replace Schoodic Wastewater System
Offerors are required to submit, at a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of summation error, the total corrected amounts govern. Round totals & extended prices to whole dollars.
CONTRACT LINE
ITEM NUMBER
(CLIN)
CONTRACT LINE ITEM
(CLI) TITLE QUANTITY UNIT OF
MEASURE
UNIT
PRICE
CLIN
PRICE
PMIS 187203
00010
Base – Wastewater Treatment Plant Demolition and Decommissioning, Existing Systems Removal
1 LUMP SUM $________
00020 Base – Selective Site Demolition 1
LUMP SUM
00030 Base – Ledge Excavation 815 CUBIC
YARDS $________ $________
00040 Base – Gravity Sewer and Effluent Forcemain Installation
LUMP SUM
00050 Base – Septic Tank and Sewer Pump Station Construction
LUMP SUM
00060 Base – Septic Disposal Field Construction 1 LUMP SUM $________
00070 Base – Reed Bed Disposal 1 LUMP SUM $________
TOTAL BASE PRICE (Contract Line Item Numbers 00010/00020/00030/00040/00050/00060/00070) --- $________
All measurement and payment information are included in the project specifications.