This document appears to be an amendment to a Request for Information (RFI) related to a solicitation for replacing water treatment facility components at Assateague Island National Seashore (ASIS). The RFI includes 14 questions and government responses regarding the operational parameters of the water treatment plant, required control system components, and existing infrastructure. Key details include:

The normal operational window is 24/7/365, with average monthly usage ranging from 75,000 to 150,000 gallons. A single PLC control panel is required that can interface with existing equipment like jockey pumps and sand filters. No SCADA software or servers are needed, but the PLC must allow for future SCADA integration. All control panels, including for the jockey pumps and sand filters, need to be replaced. The voltage for the jockey pumps will be changed from 120V to 208V, using the existing distribution panel. No new electrical panel is required, just integrating the new equipment with the old panel. The maximum flow rate of the plant is not specified.

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE WATER TREATMENT FACILITY COMPONE, newest first.
File Type Posted
Sol_140P4324R0016_Amd_0002.pdf PDF
Jockey_Pump_Control_Panels_0002.jpg JPG image
Sand_Filter_Control_Panels_0002.jpg JPG image
Sol_140P4324R0016_Amd_0001.pdf PDF
Sol_140P4324R0016.pdf PDF
Attachment_4_-_Past_Performance_Questionnaire_.doc DOC document
B08_RFP-ASIS-H2OTreatmentPlant.docx DOCX document
A04-SOW-H2O-TreatmentPlant_Final.docx DOCX document
B03-MD20240057-8_9_24.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P4324R0016 ASIS Water treatment Facility Components

Amendment 0002 RFIs 1-14

1. What is the flow rate and normal operational window of the water plant?

Government response: The normal operational window of the water plant is 24/7/365, and the gallons used per month, on average, range from 150k gallons in the summer to 75k gallons in the winter.

2. The PLC panel with HMI and Chart recorder what is the PLC manufacturer and model you want to use?

Government response: Can't specify a specific manufacturer or model but it need to be able to fit the SOW (this will be a submittal). The PLC panel used for the wastewater is an automation direct panel with Allen Bradley Compact Logic.

3. Will the PLC be a single PLC or redundant?

Government response: Single

4. Will the PLC be required to have UPS and for how many hours of power and at what percentage of load?

Government response: There is a generator at the building that will turn on if the power goes out. If the panel doesn't have an internal way to keep power for a couple seconds when that transition happens then yes it will need a UPS that can handle the load of the panel but won't need multiple hours of battery backup.

5. What is the SCADA software you are using and how many licenses do you need?

Government response: We are not currently using a SCADA software, but need be able to use SCADA in the future.

6. How many servers do you need and are they redundant?

Government response: No servers needed.

7. Is water panel E-3 powered by electrical panel DP-3?

Government response: Presumably but not 100%, the electric is all coming from that main electric room though that was observed during the site visit.

8. Do you need any additional workstation computers for operations and if so, how many?

Government response: No

9. Is there an existing program that is being used for the site that can be transferred/modified or does this require all brand-new programming including graphics?

Government response: No, needs to be all brand new.

10. Are the jockey pumps controlled directly from PLC or do they need a control panel and is the control panel provided by the manufacturer, or does it need to be built?

Government response: They need to be able to be controlled by the PLC, but also need their own "control panel" like the one that is currently there that can turn on/off the pumps, show hours, and house the circuitry.

11. The documents mentioned the changing of voltage, but don’t specify where, is this for a specific piece of equipment, for the overall service, or is this not needed as the existing panelboard is already listed for 208/120VAC power?

Government response: The voltage change is for the Jockey Pumps, going from 120 to 208, which can be provided from existing DP.

12. Do you need additional circuits beyond what is available for the existing equipment or are you looking to have all the new equipment installed on a new panelboard and abandon the old panelboard?

Government response: New equipment installed on the old panelboard (distribution panel); we are not abandoning the old panel or installing a new one.

13. What is the equipment required to be controlled and/or monitored by the PLC?

Government response: Most of the system will be able to be controlled and monitored by the PLC, such as but not limited to, hours of pumps, tank levels, pump cycle counter, set tank alarm levels, turn on/off pumps.

14. Outside of panels “Water Control System E3” and Well Pump Control Panel “LPI-I9”, are there any other existing control panels that need to be replaced?

What is the maximum flow rate through the plant?

Government response: The jockey pumps will all need individual control panels and each of the sand filters also have a control panel, all of the control panels will need to be replaced.

Unsure on the maximum flow rate of the water plant. What we know, which is what was provided, was the general gallons used throughout the summer and winter.

See attachment: Jockey Pump Control Panels, and Sand Filter Control Panels