BOSTON FIRE SYSTEMS INSPECTION REPORT
LOCATION
'BatHv^oc::>Na I-cxvn:!^
SYSTEM
SYSTEM TYPE
□ FIRE SUPPRESSION
i^FIRE ALARM □ SPRINKLER SYSTEWI CONTROLS
O halon o O novec
O FM200 O WET CHEMICAL Q
INSPECTION TYPE [gfANNUAL n SEMI-ANNUAL □ QUATERLY □ CONDITION AS FOUND [g"NORMAL □ IN TROUBLE □ INSPECTOR MEDONEILLs.e.t. □ ATTACHED INFO 0 PANEL INFO AND BATTERY DATA g' FIELD DEVICE TEST DATA
□ DETECTOR SENSITIVITY DATA □
INSPECTOR COMMENTS
(Awo T>CgS vAAeerr— <->L A^VA.»ryv^ ^ngyv^yvrx
z) TMEWS A'iza l/VlO\Tv?^e. -l&Sues. UOfTV Sr^-W.v>^ Ll'bVSr:) CSiv\ "TKcsE-
"PiaWt (S Tlgp -Ra ^'7S-7'/D-/'£<k) t^oC-A (s.
UJtTTi 7?*e STPFg- gys7g=^vi
INSPECTION RESULT
I have inspected and tested the above listed system according to NFPA requirements , the equipment manufacturers requirements, and standard industry practice and find that it can best be described as follows:
^IN WORKING ORDER 0JN NEED OF REPAIRS □
The code conformance of this system can only be determined by the local Authority Having Jurisdiction .
NFPA Codes change frequently and it is generally not mandated to modify an existing system to conform to changes in code adopted after the system installation. Any large deviation in this system to current codes will be noted in the comments section of this report.
INSPECTOR INITIALS DATE SYSTEM BACK IN SERVICE AT
3-^-22-
SW&M, "^ATHrasOM, "^VXiG, item REMARKS
3) '^y^L. ''T^6C>n^wv MA^ Sc")\a\S. cTaAI A\T©Va/^T<^
<SorvAc> OUT" luvTV '~v=tA«v= ♦ TVe 'FVow- Lvv>e<^
ArT~ TW= f^vl^ T>t> i/\OT- CuoiVr
I VX^ to»U aIAt-vw "n^Avvsm sSiVv'v Arv<c>
TSe <2or^e-c-oeT> i^LreS'^W /v\;isc-\>v\ ts^ iaot" c:toAA.wveo,t7^\.
/^VAriv«
Uo Auo^^>e A\^'r>w &<rt€S.r3 IM '0SA(- c93r-n>'Xi
"n^ ^S>u! \*c>v^C, ( (Sups'T/^Loc\<c?0 '^*^VrCl2i'^ )
Uc> V\6oe^V AT?f?
XWrc, "tSr-W^i (A "^Utlr^vr^ "rr*
"TW- "~P^*^\rc date _ LOCATION SYSTEM roovi IS /DG
CONTROL EQUIPMENT
CONTROL PANEL
MAKE >SbscA
MODEL
MFC DATE
FIRMWARE VER. Cll o Li
SOFTWARE VER.
tM
VISUAL INSPECTION
FUSES/OCR
Ok
LAMPS OK
ALARM RESPONSE
TROUBLE RESPONSE CPC
STATUS
REMARKS
REMOTE MONITORING
□ NONE
□ MASTER BOX #
□ TRIP COIL TESTED
□ TRIP TO FIREDEPT
^CENTRAL STATION MONITORING
□ BUILDING ALARM SYSTEM
□ ALARMS RECIEVED
□ TROUBLES RECIEVED
BATTERY TESTING
STANDBY BATTERIES
CONTROL PANEL
QUANTITY 1
VOLTAGE
AMP/HOUR SIZE ^'C>
INST DATE
FLOAT VOLTAGE /2'7
AMP/HOUR
READING V.o
AUTO LOAD TEST
30MIN DISCHARGE
TEST
STATUS
REMARKS
'■STANDBY* CONTROL PANEL
OPEN CIRCUIT
VOLTAGE
NORMAL STAND-BY
LOAD
TEST LOAD USED
INITIAL VOLTAGE
{UNDER LOAD) r
TEST TIME /^uro
FINAL VOLTAGE
( UNDER LOAD)
FINAL VOLTAGE
POST TESTING
* ALARM*
ALARM LOAD USED
TEST TIME
FINAL VOLTAGE
(UNDER LOAD )
OPEN CIRCUIT
VOLTAGE
REMARKS