220308_BATHROOM_BUILDING_0001.pdf

PDF 1 MB Posted

Attached to
Fire Alarm/Sprinkler System Inspection, Testing, M Federal contract opportunity
Solicitation number
140P4323Q0045
Issued by
Department of the Interior National Park Service Northeast Region

View the file

Other files for this federal contract opportunity

Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOSTON FIRE SYSTEMS INSPECTION REPORT

LOCATION

'BatHv^oc::>Na I-cxvn:!^

SYSTEM

SYSTEM TYPE

□ FIRE SUPPRESSION

i^FIRE ALARM □ SPRINKLER SYSTEWI CONTROLS

O halon o O novec

O FM200 O WET CHEMICAL Q

INSPECTION TYPE [gfANNUAL n SEMI-ANNUAL □ QUATERLY □ CONDITION AS FOUND [g"NORMAL □ IN TROUBLE □ INSPECTOR MEDONEILLs.e.t. □ ATTACHED INFO 0 PANEL INFO AND BATTERY DATA g' FIELD DEVICE TEST DATA

□ DETECTOR SENSITIVITY DATA □

INSPECTOR COMMENTS

(Awo T>CgS vAAeerr— <->L A^VA.»ryv^ ^ngyv^yvrx

z) TMEWS A'iza l/VlO\Tv?^e. -l&Sues. UOfTV Sr^-W.v>^ Ll'bVSr:) CSiv\ "TKcsE-

"PiaWt (S Tlgp -Ra ^'7S-7'/D-/'£<k) t^oC-A (s.

UJtTTi 7?*e STPFg- gys7g=^vi

INSPECTION RESULT

I have inspected and tested the above listed system according to NFPA requirements , the equipment manufacturers requirements, and standard industry practice and find that it can best be described as follows:

^IN WORKING ORDER 0JN NEED OF REPAIRS □

The code conformance of this system can only be determined by the local Authority Having Jurisdiction .

NFPA Codes change frequently and it is generally not mandated to modify an existing system to conform to changes in code adopted after the system installation. Any large deviation in this system to current codes will be noted in the comments section of this report.

INSPECTOR INITIALS DATE SYSTEM BACK IN SERVICE AT

3-^-22-

SW&M, "^ATHrasOM, "^VXiG, item REMARKS

3) '^y^L. ''T^6C>n^wv MA^ Sc")\a\S. cTaAI A\T©Va/^T<^

<SorvAc> OUT" luvTV '~v=tA«v= ♦ TVe 'FVow- Lvv>e<^

ArT~ TW= f^vl^ T>t> i/\OT- CuoiVr

I VX^ to»U aIAt-vw "n^Avvsm sSiVv'v Arv<c>

TSe <2or^e-c-oeT> i^LreS'^W /v\;isc-\>v\ ts^ iaot" c:toAA.wveo,t7^\.

/^VAriv«

Uo Auo^^>e A\^'r>w &<rt€S.r3 IM '0SA(- c93r-n>'Xi

"n^ ^S>u! \*c>v^C, ( (Sups'T/^Loc\<c?0 '^*^VrCl2i'^ )

Uc> V\6oe^V AT?f?

XWrc, "tSr-W^i (A "^Utlr^vr^ "rr*

"TW- "~P^*^\rc date _ LOCATION SYSTEM roovi IS /DG

CONTROL EQUIPMENT

CONTROL PANEL

MAKE >SbscA

MODEL

MFC DATE

FIRMWARE VER. Cll o Li

SOFTWARE VER.

tM

VISUAL INSPECTION

FUSES/OCR

Ok

LAMPS OK

ALARM RESPONSE

TROUBLE RESPONSE CPC

STATUS

REMARKS

REMOTE MONITORING

□ NONE

□ MASTER BOX #

□ TRIP COIL TESTED

□ TRIP TO FIREDEPT

^CENTRAL STATION MONITORING

□ BUILDING ALARM SYSTEM

□ ALARMS RECIEVED

□ TROUBLES RECIEVED

BATTERY TESTING

STANDBY BATTERIES

CONTROL PANEL

QUANTITY 1

VOLTAGE

AMP/HOUR SIZE ^'C>

INST DATE

FLOAT VOLTAGE /2'7

AMP/HOUR

READING V.o

AUTO LOAD TEST

30MIN DISCHARGE

TEST

STATUS

REMARKS

'■STANDBY* CONTROL PANEL

OPEN CIRCUIT

VOLTAGE

NORMAL STAND-BY

LOAD

TEST LOAD USED

INITIAL VOLTAGE

{UNDER LOAD) r

TEST TIME /^uro

FINAL VOLTAGE

( UNDER LOAD)

FINAL VOLTAGE

POST TESTING

* ALARM*

ALARM LOAD USED

TEST TIME

FINAL VOLTAGE

(UNDER LOAD )

OPEN CIRCUIT

VOLTAGE

REMARKS