B08_-_140P4322R0003_LOWE_ATTACHMENT_NUMBER_012_090190_52_Maint_Repainting_LOWE_241738_0004.pdf

PDF 141 KB Posted

Attached to
LOWE REHABILITATE CENTRAL STREET WALKWAY
Solicitation number
140P4322R0003
Issued by

About this file

This document is a specification section outlining requirements for maintenance repainting of steel structures and guardrails at the LOWE REHABILITATE CENTRAL STREET WALKWAY project for the Department of the Interior National Park Service Northeast Region. It specifies preparatory cleaning materials and methods, paint materials including a rust-inhibitive water-based primer and alkyd exterior semigloss topcoat, patching materials, and execution requirements. Repainting is to match existing colors and have a uniform appearance when viewed from 20 feet away.

View the file

Other files

File Type Posted
Sol_140P4322R0003_Amd_0005.pdf PDF
Sol_140P4322R0003_Amd_0004.pdf PDF
B08_-_140P4322R0003_LOWE_ATTACHMENT_NUMBER_013_Site_Visit_Sign_in_Sheet_0004.pdf PDF
Sol_140P4322R0003_Amd_0003.pdf PDF
B08_-_140P4322R0003_LOWE_ATTACHMENT_NUMBER_011_BINDER_1_CENTRAL_STREET_ADDITIONAL_PHOTOS_0003.pdf PDF
Sol_140P4322R0003_Amd_0002.pdf PDF
Sol_140P4322R0003_Amd_0001.pdf PDF
B08_-_140P4322R0003_LOWE_ATTACHMENT_NUMBER_010_CENTRAL_STREET_SITE_MTG_LOCATION_0001.pdf PDF
B08_-_140P4322R0003_LOWE_ATTACHMENT_NUMBER_007__FAR_52_204-26_Covered_Telecommunications_Equipment_or_Services-Representation.pdf PDF
B08_-_140P4322R0003_LOWE_ATTACHMENT_NUMBER_009_LmtOnSubconRpt.xlsx XLSX spreadsheet
B08_-_140P4322R0003_LOWE_ATTACHMENT_NUMBER_003_Rehabilitate_Central_Street_Canal_Walkway_2108-06-28_drawings.pdf PDF
B08_-_140P4322R0003_ATTACHMENT_NUMBER_001_LOWE_Rehabilitate_Central_Street_Canal_Walkway_SOW.docx DOCX document
B08_-_140P4322R0003_LOWE_ATTACHMENT_NUMBER_004_Rehabilitate_Central_Street_Canal_Walkway__DOL_DBA_GD_MA20220008__MA_Heavy_01072022.pdf PDF
B08_-_140P4322R0003_LOWE_ATTACHMENT_NUMBER_002_Rehabilitate_Central_Street_Canal_Walkway_Specifications_-_Updated_2_9_2022.pdf PDF
B08_-_140P4322R0003_LOWE_ATTACHMENT_NUMBER_006_FAR_52_212-3_Offer_Representations_and_Certifications_-_Commercial_Products_and_Commercial_Services.pdf PDF
B08_-_140P4322R0003_LOWE_ATTACHMENT_NUMBER_008_FAR_52_204-24___REPRESENTATION_REGARDING_CERTAIN_TELECOMMUNICATIONS_AND_VIDEO.pdf PDF
Sol_140P4322R0003.pdf PDF
B08_-_140P4322R0003_LOWE_ATTACHMENT_NUMBER_005_Rehabilitate_Central_Street_Canal_Walkway_Guidance_on_Preparing_Workplace_for_COVID_19.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOWE 241738 09 0190.52 - 1

MAINTENANCE REPAINTING

SECTION 09 0190.52 - MAINTENANCE REPAINTING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes maintenance repainting as follows:

1. Repainting.

1.3 DEFINITIONS

A. Gloss Level 5: 35 to 70 units at 60 degrees, according to ASTM D 523.

1.4 SEQUENCING AND SCHEDULING

A. Perform maintenance repainting in the following sequence, which includes work specified in this and other Sections:

1. Examine condition of surfaces to be painted.

2. Remove existing paint to the degree required for each substrate and surface condition of existing paint.

3. Apply paint system.

1.5 ACTION SUBMITTALS

A. Product Data: For each type of product.

1. Include recommendations for product application and use.

2. Include test data substantiating that products comply with requirements.

B. Samples: For each type of paint system and each pattern, color, and gloss; minimum 6 inches long in least dimension.

1. Include stepped Samples defining each separate coat, including fillers and primers.

Resubmit until each required sheen, color, and texture is achieved.

2. Include a list of materials for each coat of each Sample.

1.6 MAINTENANCE MATERIAL SUBMITTALS

A. Furnish extra paint materials, from the same production run, that match products applied and that are packaged with protective covering for storage and identified with labels describing contents, including material, finish, source, and location on building.

1. Quantity: Furnish Government with an additional 1 gal. of paint.

LOWE 241738 09 0190.52 - 2

1.7 QUALITY ASSURANCE

1.8 DELIVERY, STORAGE, AND HANDLING

A. Store materials not in use in tightly covered containers in well-ventilated areas with ambient temperatures continuously maintained at not less than 45 deg F.

1. Maintain containers in clean condition, free of foreign materials and residue.

2. Remove rags and waste daily.

1.9 FIELD CONDITIONS

A. Weather Limitations: Proceed with maintenance repainting only when existing and forecasted weather conditions are within the environmental limits set by each manufacturer's written instructions and specified requirements.

B. Apply paints only when temperature of surfaces to be painted and ambient air temperatures are between 50 and 95 deg F.

C. Do not apply paint in snow, rain, fog, or mist; when relative humidity exceeds 85 percent; at temperatures less than 5 deg F above the dew point; or to damp or wet surfaces.

1. Painting may continue during inclement weather if surfaces and areas to be painted are enclosed and heated within temperature limits specified by manufacturer for surface preparation and during paint application and drying periods.

PART 2 - PRODUCTS

2.1 PREPARATORY CLEANING MATERIALS

A. Water: Potable.

B. Hot Water: Water heated to a temperature of 140 to 160 deg F.

C. Detergent Solution: Solution prepared by mixing 2 cups of tetrasodium pyrophosphate (TSPP), 1/2 cup of laundry detergent that contains no ammonia, 5 quarts of 5 percent sodium hypochlorite bleach, and 15 quarts of warm water for every 5 gal. of solution required.

D. Mildewcide: Commercial proprietary mildewcide or a job-mixed solution prepared by mixing 1/3 cup of household detergent that contains no ammonia, 1 quart of 5 percent sodium hypochlorite bleach, and 3 quarts of warm water.

E. Abrasives for Ferrous Metal Cleaning: Aluminum oxide paper, emery paper, fine steel wool, steel scrapers, and steel-wire brushes of various sizes.

F. Rust Remover: Manufacturer's standard phosphoric acid-based gel formulation, also called "naval jelly," for removing corrosion from iron and steel.

2.2 PAINT, GENERAL

A. Material Compatibility:

LOWE 241738 09 0190.52 - 3

1. Provide materials for use within each paint system that are compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience.

2. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat for use in paint system and on substrate indicated.

B. Colors: Match existing.

2.3 PAINT MATERIALS, GENERAL

A. MPI Standards: Provide products that comply with MPI standards indicated and that are listed in its "MPI Approved Products List."

B. Transition Coat: Paint manufacturer's recommended coating for use where a residual existing coating is incompatible with the paint system.

2.4 PAINT MATERIALS

A. Metal Primers:

1. Primer, Rust-Inhibitive, Water Based: MPI #79.

a. Basis-of-Design Product: Sherwin-Williams; Steel Spec Universal Metal Primer

(B50WV8430). Provide this or equal product, as approved by Contracting Officer.

B. Solvent-Based Paints:

1. Alkyd, Exterior, Semigloss (Gloss Level 5):MPI #94.

a. Basis-of-Design Product: Sherwin-Williams; DTM Alkyd Semi-Gloss (B55W00101). Provide this or equal product, as approved by Contracting Officer.

2.5 PATCHING MATERIALS

A. Metal-Patching Compound: Two-part, polyester-resin, metal-patching compound; knife-grade formulation as recommended in writing by manufacturer for type of metal repair indicated, tooling time required for the detail of work, and site conditions. Compound shall be produced for filling metal that has deteriorated from corrosion. Filler shall be capable of filling deep holes and spreading to feather edge.

PART 3 - EXECUTION

3.1 MAINTENANCE REPAINTING, GENERAL

A. Maintenance Repainting Appearance Standard: Completed work is to have a uniform appearance as viewed from building exterior at 20 feet away from painted surface.

B. Execution of the Work: In repainting surfaces, disturb them as minimally as possible and as follows:

1. Remove failed coatings and corrosion and repaint.

2. Verify that substrate surface conditions are suitable for repainting.

LOWE 241738 09 0190.52 - 4

3. Allow other trades to repair items in place before repainting.

C. Mechanical Abrasion: Where mechanical abrasion is needed for the work, use gentle methods, such as scraping and lightly hand sanding, that will not abrade softer substrates, reducing clarity of detail.

D. Heat Processes: Do not use torches, heat guns, or heat plates.

3.2 EXAMINATION

A. Examine substrates and conditions, with Installer present, for compliance with requirements for maximum moisture content and other conditions affecting performance of painting work. Comply with paint manufacturer's written instructions for inspection.

B. Alkalinity: Do not begin application of coatings unless surface alkalinity is within range recommended in writing by paint manufacturer. Conduct alkali testing with litmus paper on exposed plaster, cementitious, and masonry surfaces.

C. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers.

1. If existing surfaces cannot be prepared to an acceptable condition for proper finishing by using specified surface-preparation methods, notify Contracting Officer in writing.

D. Begin coating application only after unsatisfactory conditions have been corrected and surfaces are dry.

1. Beginning coating application constitutes Contractor's acceptance of substrates and conditions.

3.3 PREPARATORY CLEANING

A. General: Use the gentlest, appropriate method necessary to clean surfaces in preparation for painting. Clean all surfaces, corners, contours, and interstices.

B. Detergent Cleaning: Wash surfaces by hand using clean rags, sponges, and bristle brushes. Scrub surface with detergent solution and bristle brush until soil is thoroughly dislodged and can be removed by rinsing. Use small brushes to remove soil from joints and crevices. Dip brush in solution often to ensure that adequate fresh detergent is used and that surface remains wet. Rinse with water applied by clean rags or sponges.

C. Mildew: Clean off existing mildew, algae, moss, plant material, loose paint, grease, dirt, and other debris by scrubbing with bristle brush or sponge and detergent solution. Scrub mildewed areas with mildewcide. Rinse with water applied by clean rags or sponges.

D. Chemical Rust Removal:

1. Remove loose rust scale with specified abrasives for ferrous-metal cleaning.

2. Apply rust remover with brushes or as recommended in writing by manufacturer.

LOWE 241738 09 0190.52 - 5

3. Allow rust remover to remain on surface for period recommended in writing by manufacturer or as determined by preconstruction testing. Do not allow extended dwell time.

4. Wipe off residue with mineral spirits and either steel wool or soft rags, or clean with method recommended in writing by manufacturer to remove residue.

5. Dry immediately with clean, soft cloths. Follow direction of grain in metal.

6. Prime immediately to prevent rust. Do not touch cleaned metal surface until primed.

E. Mechanical Rust Removal:

1. Remove rust with specified abrasives for ferrous-metal cleaning. Clean to bright metal.

2. Wipe off residue with mineral spirits and either steel wool or soft rags.

3. Dry immediately with clean, soft cloths. Follow direction of grain in metal.

4. Prime immediately to prevent rust. Do not touch cleaned metal surface until primed.

3.4 PAINT REMOVAL

A. General: Remove paint where indicated. Where cleaning methods have been attempted and further removal of the paint is required because of incompatible or unsatisfactory surfaces for repainting, remove paint to extent required by conditions.

B. Paint Removal with Hand Tools: Remove paint manually using hand-held scrapers, wire brushes, sandpaper, and metallic wool as appropriate for the substrate material.

3.5 SUBSTRATE REPAIR

A. General: Repair substrate surface defects that are inconsistent with the surface appearance of adjacent materials and finishes.

3.6 PAINT APPLICATION, GENERAL

A. Comply with manufacturers' written instructions for application methods unless otherwise indicated in this Section.

B. Prepare surfaces to be painted according to the Surface-Preparation Schedule and with manufacturer's written instructions for each substrate condition.

C. Apply a transition coat over incompatible existing coatings.

D. Metal Substrate: Stripe paint corners, crevices, bolts, welds, and sharp edges before applying full coat. Apply two coats to surfaces that are inaccessible after completion of the Work. Tint stripe coat different than the main coating and apply with brush.

E. Blending Painted Surfaces: When painting new substrates patched into existing surfaces or touching up missing or damaged finishes, apply coating system specified for the specific substrate. Apply final finish coat over entire surface from edge to edge and corner to corner.

3.7 CLEANING AND PROTECTION

A. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Project site.

LOWE 241738 09 0190.52 - 6

B. After completing paint application, clean spattered surfaces. Remove spattered paints by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.

C. Protect work of other trades against damage from paint application. Correct damage to work of other trades by cleaning, repairing, replacing, and refinishing, as approved by Architect, and leave in an undamaged condition.

D. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces.

3.8 SURFACE-PREPARATION SCHEDULE

A. Surface Preparation for MPI DSD 2 Degree of Surface Degradation:

1. Surface Condition: Paint film loose, flaking, or peeling.

2. Paint Removal: Remove loose, flaking, or peeling paint film by hand-tool or chemical paint-removal methods.

3. Preparation for Painting: Wash surface by detergent cleaning; use solvent cleaning where needed. Use other cleaning methods for small areas of bare substrate if required. Sand surfaces to smooth remaining paint film edges. Prepare bare cleaned surface to be painted according to paint manufacturer's written instructions for substrate construction materials.

3.9 EXTERIOR MAINTENANCE REPAINTING SCHEDULE

A. Ferrous Metal Substrates: Steel structure and steel guardrail:

1. Alkyd System:

a. Prime Coat: MPI #79.

b. Intermediate Coat: Alkyd, exterior, semigloss (Gloss Level 5), MPI #94.

c. Topcoat: Alkyd, exterior, semigloss (Gloss Level 5), MPI #94.

d. Color: Match existing colors.

END OF SECTION 09 0190.52

PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes maintenance repainting as follows:
1. Repainting.
1.3 DEFINITIONS
A. Gloss Level 5: 35 to 70 units at 60 degrees, according to ASTM D 523.
1.4 SEQUENCING AND SCHEDULING
A. Perform maintenance repainting in the following sequence, which includes work specified in this and other Sections:
1. Examine condition of surfaces to be painted.
2. Remove existing paint to the degree required for each substrate and surface condition of existing paint.
3. Apply paint system.
1.5 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include recommendations for product application and use.
2. Include test data substantiating that products comply with requirements.
B. Samples: For each type of paint system and each pattern, color, and gloss; minimum 6 inches long in least dimension.
1. Include stepped Samples defining each separate coat, including fillers and primers. Resubmit until each required sheen, color, and texture is achieved.
2. Include a list of materials for each coat of each Sample.
1.6 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra paint materials, from the same production run, that match products applied and that are packaged with protective covering for storage and identified with labels describing contents, including material, finish, source, and location on ...
1. Quantity: Furnish Government with an additional 1 gal. of paint.
1.7 QUALITY ASSURANCE
1.8 DELIVERY, STORAGE, AND HANDLING
A. Store materials not in use in tightly covered containers in well-ventilated areas with ambient temperatures continuously maintained at not less than 45 deg F.
1. Maintain containers in clean condition, free of foreign materials and residue.
2. Remove rags and waste daily.
1.9 FIELD CONDITIONS
A. Weather Limitations: Proceed with maintenance repainting only when existing and forecasted weather conditions are within the environmental limits set by each manufacturer's written instructions and specified requirements.
B. Apply paints only when temperature of surfaces to be painted and ambient air temperatures are between 50 and 95 deg F.
C. Do not apply paint in snow, rain, fog, or mist; when relative humidity exceeds 85 percent; at temperatures less than 5 deg F above the dew point; or to damp or wet surfaces.
1. Painting may continue during inclement weather if surfaces and areas to be painted are enclosed and heated within temperature limits specified by manufacturer for surface preparation and during paint application and drying periods.
PART 2 - PRODUCTS
2.1 PREPARATORY CLEANING MATERIALS
A. Water: Potable.
B. Hot Water: Water heated to a temperature of 140 to 160 deg F.
C. Detergent Solution: Solution prepared by mixing 2 cups of tetrasodium pyrophosphate (TSPP), 1/2 cup of laundry detergent that contains no ammonia, 5 quarts of 5 percent sodium hypochlorite bleach, and 15 quarts of warm water for every 5 gal. of sol...
D. Mildewcide: Commercial proprietary mildewcide or a job-mixed solution prepared by mixing 1/3 cup of household detergent that contains no ammonia, 1 quart of 5 percent sodium hypochlorite bleach, and 3 quarts of warm water.
E. Abrasives for Ferrous Metal Cleaning: Aluminum oxide paper, emery paper, fine steel wool, steel scrapers, and steel-wire brushes of various sizes.
F. Rust Remover: Manufacturer's standard phosphoric acid-based gel formulation, also called "naval jelly," for removing corrosion from iron and steel.
2.2 PAINT, GENERAL
A. Material Compatibility:
1. Provide materials for use within each paint system that are compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience.
2. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat for use in paint system and on substrate indicated.

B. Colors: Match existing.

2.3 PAINT MATERIALS, GENERAL
A. MPI Standards: Provide products that comply with MPI standards indicated and that are listed in its "MPI Approved Products List."
B. Transition Coat: Paint manufacturer's recommended coating for use where a residual existing coating is incompatible with the paint system.
2.4 PAINT MATERIALS
A. Metal Primers:
1. Primer, Rust-Inhibitive, Water Based: MPI #79.
a. Basis-of-Design Product: Sherwin-Williams; Steel Spec Universal Metal Primer (B50WV8430). Provide this or equal product, as approved by Contracting Officer.
B. Solvent-Based Paints:
1. Alkyd, Exterior, Semigloss (Gloss Level 5):MPI #94.
a. Basis-of-Design Product: Sherwin-Williams; DTM Alkyd Semi-Gloss (B55W00101). Provide this or equal product, as approved by Contracting Officer.
2.5 PATCHING MATERIALS
A. Metal-Patching Compound: Two-part, polyester-resin, metal-patching compound; knife-grade formulation as recommended in writing by manufacturer for type of metal repair indicated, tooling time required for the detail of work, and site conditions. Co...
PART 3 - EXECUTION
3.1 MAINTENANCE REPAINTING, GENERAL
A. Maintenance Repainting Appearance Standard: Completed work is to have a uniform appearance as viewed from building exterior at 20 feet away from painted surface.
B. Execution of the Work: In repainting surfaces, disturb them as minimally as possible and as follows:
1. Remove failed coatings and corrosion and repaint.
2. Verify that substrate surface conditions are suitable for repainting.
3. Allow other trades to repair items in place before repainting.
C. Mechanical Abrasion: Where mechanical abrasion is needed for the work, use gentle methods, such as scraping and lightly hand sanding, that will not abrade softer substrates, reducing clarity of detail.
D. Heat Processes: Do not use torches, heat guns, or heat plates.
3.2 EXAMINATION
A. Examine substrates and conditions, with Installer present, for compliance with requirements for maximum moisture content and other conditions affecting performance of painting work. Comply with paint manufacturer's written instructions for inspection.
B. Alkalinity: Do not begin application of coatings unless surface alkalinity is within range recommended in writing by paint manufacturer. Conduct alkali testing with litmus paper on exposed plaster, cementitious, and masonry surfaces.
C. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers.
1. If existing surfaces cannot be prepared to an acceptable condition for proper finishing by using specified surface-preparation methods, notify Contracting Officer in writing.
D. Begin coating application only after unsatisfactory conditions have been corrected and surfaces are dry.
1. Beginning coating application constitutes Contractor's acceptance of substrates and conditions.
3.3 PREPARATORY CLEANING
A. General: Use the gentlest, appropriate method necessary to clean surfaces in preparation for painting. Clean all surfaces, corners, contours, and interstices.
B. Detergent Cleaning: Wash surfaces by hand using clean rags, sponges, and bristle brushes. Scrub surface with detergent solution and bristle brush until soil is thoroughly dislodged and can be removed by rinsing. Use small brushes to remove soil fro...
C. Mildew: Clean off existing mildew, algae, moss, plant material, loose paint, grease, dirt, and other debris by scrubbing with bristle brush or sponge and detergent solution. Scrub mildewed areas with mildewcide. Rinse with water applied by clean ra...
D. Chemical Rust Removal:
1. Remove loose rust scale with specified abrasives for ferrous-metal cleaning.
2. Apply rust remover with brushes or as recommended in writing by manufacturer.
3. Allow rust remover to remain on surface for period recommended in writing by manufacturer or as determined by preconstruction testing. Do not allow extended dwell time.
4. Wipe off residue with mineral spirits and either steel wool or soft rags, or clean with method recommended in writing by manufacturer to remove residue.
5. Dry immediately with clean, soft cloths. Follow direction of grain in metal.
6. Prime immediately to prevent rust. Do not touch cleaned metal surface until primed.
E. Mechanical Rust Removal:
1. Remove rust with specified abrasives for ferrous-metal cleaning. Clean to bright metal.
2. Wipe off residue with mineral spirits and either steel wool or soft rags.
3. Dry immediately with clean, soft cloths. Follow direction of grain in metal.
4. Prime immediately to prevent rust. Do not touch cleaned metal surface until primed.
3.4 PAINT REMOVAL
A. General: Remove paint where indicated. Where cleaning methods have been attempted and further removal of the paint is required because of incompatible or unsatisfactory surfaces for repainting, remove paint to extent required by conditions.
B. Paint Removal with Hand Tools: Remove paint manually using hand-held scrapers, wire brushes, sandpaper, and metallic wool as appropriate for the substrate material.
3.5 SUBSTRATE REPAIR
A. General: Repair substrate surface defects that are inconsistent with the surface appearance of adjacent materials and finishes.
3.6 PAINT APPLICATION, GENERAL
A. Comply with manufacturers' written instructions for application methods unless otherwise indicated in this Section.
B. Prepare surfaces to be painted according to the Surface-Preparation Schedule and with manufacturer's written instructions for each substrate condition.
C. Apply a transition coat over incompatible existing coatings.
D. Metal Substrate: Stripe paint corners, crevices, bolts, welds, and sharp edges before applying full coat. Apply two coats to surfaces that are inaccessible after completion of the Work. Tint stripe coat different than the main coating and apply wit...
E. Blending Painted Surfaces: When painting new substrates patched into existing surfaces or touching up missing or damaged finishes, apply coating system specified for the specific substrate. Apply final finish coat over entire surface from edge to e...
3.7 CLEANING AND PROTECTION
A. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Project site.
B. After completing paint application, clean spattered surfaces. Remove spattered paints by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.
C. Protect work of other trades against damage from paint application. Correct damage to work of other trades by cleaning, repairing, replacing, and refinishing, as approved by Architect, and leave in an undamaged condition.
D. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces.
3.8 SURFACE-PREPARATION SCHEDULE
A. Surface Preparation for MPI DSD 2 Degree of Surface Degradation:
1. Surface Condition: Paint film loose, flaking, or peeling.
2. Paint Removal: Remove loose, flaking, or peeling paint film by hand-tool or chemical paint-removal methods.
3. Preparation for Painting: Wash surface by detergent cleaning; use solvent cleaning where needed. Use other cleaning methods for small areas of bare substrate if required. Sand surfaces to smooth remaining paint film edges. Prepare bare cleaned surf...
3.9 EXTERIOR MAINTENANCE REPAINTING SCHEDULE
A. Ferrous Metal Substrates: Steel structure and steel guardrail:
1. Alkyd System:
a. Prime Coat: MPI #79.
b. Intermediate Coat: Alkyd, exterior, semigloss (Gloss Level 5), MPI #94.
c. Topcoat: Alkyd, exterior, semigloss (Gloss Level 5), MPI #94.
d. Color: Match existing colors.